- 40 Actual Exam Questions
- Compatible with all Devices
- Printable Format
- No Download Limits
- 90 Days Free Updates
Get All ISTQB Certified Tester Advanced Level, Test Automation Engineering Exam Questions with Validated Answers
Vendor: | iSQI |
---|---|
Exam Code: | CTAL-TAE |
Exam Name: | ISTQB Certified Tester Advanced Level, Test Automation Engineering |
Exam Questions: | 40 |
Last Updated: | October 8, 2025 |
Related Certifications: | Advanced Level Test Automation Engineer |
Exam Tags: |
Looking for a hassle-free way to pass the iSQI ISTQB Certified Tester Advanced Level, Test Automation Engineering exam? DumpsProvider provides the most reliable Dumps Questions and Answers, designed by iSQI certified experts to help you succeed in record time. Available in both PDF and Online Practice Test formats, our study materials cover every major exam topic, making it possible for you to pass potentially within just one day!
DumpsProvider is a leading provider of high-quality exam dumps, trusted by professionals worldwide. Our iSQI CTAL-TAE exam questions give you the knowledge and confidence needed to succeed on the first attempt.
Train with our iSQI CTAL-TAE exam practice tests, which simulate the actual exam environment. This real-test experience helps you get familiar with the format and timing of the exam, ensuring you're 100% prepared for exam day.
Your success is our commitment! That's why DumpsProvider offers a 100% money-back guarantee. If you don’t pass the iSQI CTAL-TAE exam, we’ll refund your payment within 24 hours no questions asked.
Don’t waste time with unreliable exam prep resources. Get started with DumpsProvider’s iSQI CTAL-TAE exam dumps today and achieve your certification effortlessly!
Which of the following is NOT a technical design consideration for a TAA?
A project consists of distributed teams working in a 24-hour environment, where activities happen at all hours of the day. This project adopts a CI (Continuous Integration) process when developer check-in code and consists of automated activities that include generating a build and deploying it to a test environment. Automated integration tests are run multiple times a day. The project have asked for a report containing the automation test results for every build, which must be available 24/7 to the project team.
Which of the following would be the BEST way to automatically provides this report?
A SUT has an existing automated test suite.
Which of the following statements relating to the introduction of new features in the SUT is TRUE?
You are executing the first test run of a test automation suite of 200 tests. All the relevant information related to the state of the SUT and to the automated test execution is stored in a small database. During the Automated test run you observe that the first 10 test pass, while an abnormal termination occurs when executing the 11th test. This test does not complete its execution and the overall execution of the suite is aborted. An immediate analysis of the abnormal termination is expected to be time consuming and you have been asked to produce a detailed report of the execution results for the first test run, as soon as possible.
What is the MOST important FIRST step to be taken immediately after the abnormal occurred when executing the 11th test?
Consider a SUT that small run on multiple platform during the execution of automated test runs. In each test run an automated test suite needs to be executed, with the same version of the TAF, against the same version of the SUT of each platform. Each platform shall have its own dedicated test environment. Your goal is to implement a process as automated as possible ( i.e with minimal manual intervention) that allows implementing a consistent setup of the TAS across the multiple test environments.
Which two of the following aspects are MOST relevant for achieving your goal in this scenario?
The configuration of the TAS uses automated installation scripts
The TAF saves the logs needed to debug errors in XML format
C) Features of the TAF not used by the automated tests have been tested
D) All the automated test cases contain the expected results
E) The TAS components are under configuration management
Security & Privacy
Satisfied Customers
Committed Service
Money Back Guranteed