1 Question 1 Single choice Objective 10: Use data flow analysis to detect if code has any data flow anomalies.
A payments team is reviewing a C function that computes a refund. The function declares 'long refund;' and, inside a branch that is taken only when the customer account is flagged, executes 'refund = amount * rate;' then calls 'log_refund(refund);'. On the path where the flag is not set, the function reaches 'log_refund(refund);' without ever assigning refund. The compiler accepts the code without error, and the team must decide which data flow anomaly to report and where to focus dynamic test cases. Which anomaly is present and what is the best next action?
Correct Answer: DExplanationOn the unflagged path refund is referenced at log_refund without any definition reaching that use, which is the classic undefined-use (u) anomaly that data flow analysis flags. The most useful follow-up is a targeted test that drives execution down the unflagged path to observe the garbage value being logged. A define-define anomaly needs two successive definitions with no intervening use, which is absent here. A define-kill anomaly involves a definition followed by an undefined-ing event such as leaving scope, and a use-kill anomaly involves a use immediately followed by such an event, neither of which describes an uninitialised read. A NULL check is meaningless for a long integer and does not address the root cause.
-
2 Question 2 Single choice Objective 3: Design test cases for a given test object by applying statement testing to achieve a defined level of coverage.
A regulated insurer must demonstrate statement coverage of at least 95 percent for a premium calculation module before a release audit in six working days. The module contains 140 executable statements. A current test suite of 118 statements is covered according to the coverage tool. Three statements are inside a deprecated legacy adapter that is excluded from the audit scope by a signed decision record, and cannot be tested because the adapter's dependency service is decommissioned. The team has budget for only a few new test cases. Which action most efficiently achieves the audited target?
Correct Answer: DExplanationThe signed decision record removes the adapter from audit scope, so the denominator for the audited statement coverage target should exclude it. Statement coverage is defined as executed statements divided by executable statements in scope, so the team should identify the uncovered in-scope statements and add minimal tests for them. Testing every statement regardless of scope wastes the limited budget on code the audit does not measure. Switching to decision coverage changes the criterion the auditor specified rather than meeting it. Mocking a decommissioned dependency for code excluded from scope adds effort with no audit benefit and contradicts the constraint of the decision record.
-
3 Question 3 Multiple choice Objective 6: Design test cases for a given test object by applying the multiple condition test technique to achieve a defined level of coverage.
A loan eligibility rule is implemented as 'if (age >= 18 && (income > 30000 || hasGuarantor)) approve'. The team must apply the multiple condition test technique to reach full multiple condition coverage, and the test set must be kept as small as possible while still being correct. Which TWO statements about the required test cases are correct? (Choose two.)
Correct Answer: C, DExplanationMultiple condition coverage requires that every combination of truth values of the atomic conditions is exercised, which for three atomic conditions yields up to eight combinations, some of which are infeasible given the structure and may be reduced accordingly; the statement that eight combinations are needed for the three atomic conditions reflects the definition. Requiring coverage of every combination forces the age condition to take both values within those combinations. Two cases are insufficient because they exercise only two of the combinations. MC/DC is a weaker criterion than multiple condition coverage and needs fewer cases, but the stem requires multiple condition coverage, so the claim that MC/DC requires fewer cases is not a comparison that justifies choosing it here, and the statement that a case is unnecessary ignores that multiple condition coverage demands every combination.
-
4 Question 4 Order list Objective 12: Apply dynamic analysis to achieve a specified goal.
A team must use dynamic analysis to find a memory leak in a long-running C++ order service that grows roughly 40 MB per day in production. The service can be run in a staging environment with an instrumented build, and the goal is to confirm the leaking allocation site before changing code. Arrange the steps in the correct order.
Drag the steps into the correct order, or use the arrows.
- Correlate the leaking allocation site with the source code and confirm it by reviewing the owning object lifetime
- Apply the fix and rerun the same workload to verify that heap growth no longer occurs
- Build the service with debug symbols and run it under a memory profiler or leak detector in staging
- Replay a representative workload for a fixed period while recording heap growth
- Compare heap snapshots taken at intervals to identify allocation sites whose live memory keeps growing
Correct Answer:- Build the service with debug symbols and run it under a memory profiler or leak detector in staging
- Replay a representative workload for a fixed period while recording heap growth
- Compare heap snapshots taken at intervals to identify allocation sites whose live memory keeps growing
- Correlate the leaking allocation site with the source code and confirm it by reviewing the owning object lifetime
- Apply the fix and rerun the same workload to verify that heap growth no longer occurs
ExplanationDynamic analysis requires an instrumented build and a tool attached during execution before any observation is possible. A representative workload must then be replayed so that heap growth is actually exercised. Snapshots compared over time reveal which allocation sites retain memory, which is the evidence needed before any code change. Correlating the site with source and object lifetime confirms the cause, and only then is a fix applied and verified with the same workload. Placing the fix before observation would violate the stated goal of confirming the site first.
-
5 Question 5 Single choice Objective 13: For a particular scenario, analyze the non-functional requirements and write the respective sections of the test plan.
A ticketing platform will launch a flash sale expected to draw 200,000 concurrent users in its first ten minutes, and the product owner has specified that 99 percent of checkout requests must complete within 2 seconds, that no seat may be sold twice, and that the platform must survive a single availability-zone outage during the sale. The test plan is being drafted, and the team lead asks where the non-functional requirements should be captured. Which section design best meets the test plan's needs?
Correct Answer: AExplanationNon-functional requirements need measurable acceptance criteria, a defined load profile that reflects 200,000 concurrent users, and explicit failure scenarios such as the availability-zone outage. Placing them as test items within scope and approach makes them traceable and executable. Leaving them only in approach text with no scope entry, deferring them to release notes, or summarising them vaguely in risks would leave the 2-second percentile, the no-double-sale rule and the zone failover untested or unverifiable.
-
6 Question 6 Dropdown Objective 22: Explain the principal aspects to be considered in planning and specifying performance testing.
A video streaming team must specify a performance test for its catalogue API, which must sustain 5,000 requests per second with a p95 latency under 300 ms during an evening peak. The load generator will be a separate machine, and the team plans to ramp up gradually to avoid masking warm-up effects. Complete the test specification by selecting the correct value for each blank.
Choose the correct value for each blank.
Load profile: ramp from 0 to 5000 req/s over minutes, hold steady for minutes before measurement, and measure in a steady-state window where the load generator's must stay below its saturation threshold.Correct Answer:Load profile: ramp from 0 to 5000 req/s over 15 minutes, hold steady for 30 minutes before measurement, and measure in a steady-state window where the load generator's CPU utilisation must stay below its saturation threshold.
ExplanationA gradual ramp of fifteen minutes avoids masking warm-up effects while keeping the test within a practical duration. Holding steady for thirty minutes before measurement lets caches and connection pools stabilise, which is the steady-state requirement for a valid p95 reading. The load generator's own CPU utilisation must stay below saturation, otherwise the measured latency reflects the generator rather than the system under test. A five-minute ramp is too abrupt to separate warm-up effects, and a ninety-minute hold adds time without changing the measurement validity. DNS cache, disk label and TLS version do not govern whether the generator is a limiting factor in a load profile.
-
7 Question 7 Single choice Objective 14: Given a particular product risk, define the particular non-functional test type(s) which are most appropriate.
A hospital records system stores patient imaging metadata and is accessed by clinicians on hospital workstations and on tablets used during ward rounds. The product risk identified in the risk workshop is that clinicians may be unable to retrieve a patient's allergy record during a ward round, because the tablet client intermittently loses its connection and the application does not cache the allergy list locally. Which non-functional test type is MOST appropriate to address this specific risk?
Correct Answer: DExplanationThe risk is that the application fails to provide the allergy data when the connection drops, which is a fault-tolerance and recoverability concern, so reliability testing focused on intermittent connectivity and recovery is the direct match. Server performance under peak load does not address a client losing its connection. Portability concerns running on different platforms rather than degraded connectivity. Security testing addresses unauthorised access, which is not the risk described.
-
8 Question 8 Drag and drop Objective 15: Understand and explain the stages in an application's software development lifecycle where non-functional testing should typically be applied.
A bank is introducing a new mobile payments feature in an agile programme with two-week sprints, a nightly build pipeline, and a quarterly production release. Match each non-functional test activity to the lifecycle stage where it should typically be applied first.
Drag each item onto its matching target. On a phone: tap an item, then tap a target.
Monitoring of error rates and latency after the quarterly releaseStatic analysis for maintainability rules on each commitLoad test of the payment API against a production-sized datasetPre-release in a performance environmentDuring development, on every commitPost-release in productionDuring requirements elicitationCorrect Answer:- Static analysis for maintainability rules on each commit → During development, on every commit
- Load test of the payment API against a production-sized dataset → Pre-release in a performance environment
- Monitoring of error rates and latency after the quarterly release → Post-release in production
ExplanationStatic maintainability checks are cheapest and most effective when run on every commit during development. A production-sized load test needs a representative environment and data, so it belongs before release. Ongoing error and latency monitoring is a post-release activity. Requirements elicitation is where non-functional requirements are defined, not where a test activity such as static analysis or monitoring is executed, so it is an unsuitable match for any of these activities.
-
9 Question 9 Single choice Objective 16: For a given scenario, define the types of defects you would expect to find by using the different non-functional test types.
A logistics company runs a warehouse application that must support field staff uploading barcode scan batches over unreliable mobile networks. A reliability test injects packet loss and connection resets during a batch upload. Afterward, the team inspects the database and finds that some scanned items appear twice and a few batches are recorded as complete when only part of their data arrived. Which defect type is the reliability test most likely exposing, and what should the team check next?
Correct Answer: DExplanationDuplicates after retries and batches marked complete with missing data point to a recoverability weakness, where a retried upload is not idempotent and a batch can be committed partially. The right follow-up is to examine transactional boundaries around the batch and whether each retry carries a unique key so the server can detect duplicates. Slow queries would show as latency rather than duplicated or incomplete data. Wording of error messages does not produce duplicate records, and device portability does not explain data corruption under connection loss.
-
10 Question 10 Single choice Objective 17: Explain the reasons for including security testing in a test approach.
A government benefits portal allows citizens to view and update their bank details. A penetration report from a previous system raised concerns about session handling, and the portal will be audited against a standard that requires evidence of security testing before go-live. The programme has a tight timeline and wants to reduce the chance of a costly post-launch breach. Which justification most convincingly explains why security testing must be included in this test approach rather than left to a general functional regression?
Correct Answer: DExplanationFunctional tests are written around intended behaviour, so they rarely probe attacker techniques such as session fixation, token theft or privilege escalation, which is why dedicated security tests are needed. The audit requirement reinforces this, because evidence of security testing must exist. Assuming login regression catches session weaknesses ignores that misuse paths are outside intended flows. Bank details are sensitive regardless of whether they are only displayed or also stored, so deferring security testing is unjustified. Security testing complements functional testing and does not replace it.
-
11 Question 11 Order list Objective 18: Explain the principal aspects to be considered in planning and specifying security tests.
A health insurer is planning security tests for a new claims submission API that accepts patient documents and identifiers, and the regulator requires documented threat coverage before approval. The team has budget for one planned round of testing and must scope it correctly from the outset. Arrange the steps in the correct order.
Drag the steps into the correct order, or use the arrows.
- Select test techniques and tools suited to each attack surface and agree the scope and rules of engagement
- Define the security test conditions and the expected controls for each identified threat
- Identify the assets and data classes the API handles, such as patient identifiers and documents
- Execute the tests, record findings with evidence, and map results back to the threat model
- Model the threats and attack surfaces, including authentication, input handling and authorisation paths
Correct Answer:- Identify the assets and data classes the API handles, such as patient identifiers and documents
- Model the threats and attack surfaces, including authentication, input handling and authorisation paths
- Define the security test conditions and the expected controls for each identified threat
- Select test techniques and tools suited to each attack surface and agree the scope and rules of engagement
- Execute the tests, record findings with evidence, and map results back to the threat model
ExplanationPlanning security tests starts with knowing what must be protected, so assets and data classes are identified first. The threat model derives from those assets and identifies the attack surfaces that tests must target. Test conditions and expected controls follow from the threats, and only then can appropriate techniques, tools and rules of engagement be selected. Execution comes last, with results traced back to the threat model to satisfy the regulator's documented-coverage requirement.
-
12 Question 12 Single choice Objective 19: Explain the reasons for including reliability testing in a test approach.
An airline's crew scheduling system runs as a primary and a standby node, with failover expected to occur within 30 seconds when the primary fails. The operations director notes that the last outage lasted nine minutes because the standby loaded stale assignments. The test team is asked to justify a reliability test stream to the steering group, which is sceptical because the system passed all functional tests and a throughput test last quarter. Which reason most directly supports including reliability testing?
Correct Answer: AExplanationThe stated requirement of 30-second failover with consistent, current assignments is a reliability property, verifying that correct service continues through a node failure and recovers within a defined time. Functional tests confirm behaviour in the absence of failure and throughput tests confirm speed under load, so neither detects stale state after failover. Response time under normal peak load is a performance concern, not reliability. Browser consistency is a usability or compatibility concern. Certification is not a prerequisite for reliability testing.
-
13 Question 13 Single choice Objective 20: Explain the principal aspects to be considered in planning and specifying reliability tests.
A utility company's meter data platform must keep ingesting readings during planned maintenance and must recover within 5 minutes after an unplanned database node crash, with no loss of acknowledged readings. The test environment cannot reproduce the full production database cluster because of licensing limits, and the team has three weeks before the maintenance window. Which planning decision best addresses reliability test specification under these constraints?
Correct Answer: DExplanationA reliability test specification must define the fault to inject, the success criteria in measurable terms, and the data-integrity check, and a reduced cluster can still exercise the failover mechanism and verify that acknowledged writes survive. Measuring only throughput does not verify recovery time or durability, and extrapolating recovery time from throughput has no basis. Skipping the crash scenario leaves the stated 5-minute and no-loss requirements untested. Deferring specification to the maintenance window leaves no time to correct defects found there.
-
14 Question 14 Single choice Objective 21: Explain the reasons for including performance testing in a test approach.
A retail bank is deciding whether to add performance testing to the test approach for its new online account opening journey, which has passed functional and security testing. The journey involves identity verification calls to a third-party service that is rate-limited to 50 requests per second. Marketing plans a campaign that could push 300 sign-up attempts per second for ten minutes. Which reason most strongly justifies including performance testing in this approach?
Correct Answer: DExplanationThe campaign's 300 requests per second against a dependency limited to 50 means the journey will encounter throttling, and performance testing is needed to measure how it behaves under that planned peak, including response times and failure rates. Functional correctness under load is a weaker reason because functional tests do not reveal throughput limits. Encryption at rest is a security concern and accessibility is a usability concern, so neither is supported by performance testing.
-
15 Question 15 Single choice Objective 23: Explain the reasons for including maintainability testing in a test approach.
A financial services firm has a core pricing engine written over eight years by a team that is being disbanded. Forecast changes for the next two years include adding new product types and replacing a deprecated rules library, and the firm's architecture board has asked whether maintainability testing should be included in the test approach. Which justification is the MOST accurate reason to include it?
Correct Answer: BExplanationMaintainability concerns how readily a system can be changed, analysed and tested, and the combination of planned product-type additions, library replacement and loss of original authors makes that risk concrete. Speed improvement is performance, installability on another operating system is portability, and user satisfaction is usability, so each of those alternatives describes a different quality characteristic.
-
16 Question 16 Single choice Objective 25: Explain the reasons for including portability testing in a test approach.
A medical device company is adapting its clinician dashboard, which currently runs on Windows-based workstations, so it can also be deployed on a Linux-based ward terminal fleet and inside a browser on tablets. The regulatory file must show that the software behaves consistently across the target environments. Which reason best justifies including portability testing in the approach?
Correct Answer: BExplanationPortability testing checks adaptability and installability in new environments, and the move from Windows to Linux and tablet browsers introduces defects such as file path conventions, font rendering and browser-specific behaviour that only this type of testing targets. Calculation correctness is a functional concern that still needs platform-specific functional testing, so portability does not replace it. Installation time is one narrow aspect, not the only one. Deployment within a single organisation does not remove the need for portability testing when the environments change.
-
17 Question 17 Single choice Objective 26: Explain why review preparation is important for the Technical Test Analyst.
A Technical Test Analyst has been asked to review a 60-page architecture design for a new event-streaming service before the design review meeting in two days. The design covers broker topology, consumer group rebalancing, retention policies and the disaster recovery procedure. The analyst has not yet seen the testability requirements or the checklist used by the architecture board. Which preparation action is most important before the review starts?
Correct Answer: BExplanationEffective review preparation means understanding what the review must verify, which the entry and exit criteria, checklist and identified technical risks define, so that the analyst can focus on the design issues that matter for testability and risk. Reformatting the document does not improve the review's substance. Executing automated tests against a design document is not meaningful because there is no executable system. Writing exhaustive test cases before the review does not prepare the analyst to evaluate the design and does not make the review unnecessary.
-
18 Question 18 Single choice Objective 28: Analyze an architectural design and identify problems according to a checklist provided in the syllabus.
A Technical Test Analyst reviews the architecture of an e-commerce order service that calls a payment gateway synchronously inside the order transaction and writes to the order database and an event bus in the same method. The design states that orders must never be charged twice and must never be lost. The checklist asks the analyst to identify design problems related to failure handling and consistency. Which finding best reflects a real design problem the analyst should raise?
Correct Answer: CExplanationThe stated requirements forbid double charges and lost orders, and writing to two systems without a transactional outbox or an idempotency key on the payment call leaves a gap where a partial failure either drops an event or causes a retry that charges again. Synchronous calls are not inherently wrong, so claiming they must always be replaced is an overstatement. The programming language is not a design flaw relevant to the checklist. Using an event bus is a legitimate choice when other systems consume events, so it is not a defect.
-
19 Question 19 Dropdown Objective 29: Summarize the activities that the Technical Test Analyst performs when setting up a test automation project.
A Test Automation Engineer is setting up a project for a web application with a regression suite that must run on every merge request in a CI pipeline. The team wants a simple structure in which the test steps are stored in a single base framework that is reused by all teams, and the test results must be reported in a consistent format. Complete the setup decisions by selecting the correct value for each blank.
Choose the correct value for each blank.
Set up the automation project by choosing a pattern for the test library, configure the pipeline to run the suite on every merge request, and direct results to a report so that failures can be traced to individual tests.Correct Answer:Set up the automation project by choosing a keyword-driven pattern for the test library, configure the pipeline to run the suite on every merge request, and direct results to a JUnit XML report so that failures can be traced to individual tests.
ExplanationA keyword-driven structure stores reusable action keywords in a shared library, which suits the requirement for common base steps across teams. CI systems commonly consume JUnit XML, which enables per-test traceability on each merge request. A data-driven pattern focuses on varying input data for one test script, which does not match the shared step library requirement. A spreadsheet is a poor machine-readable report format for CI, and screenshots and binary dumps do not provide per-test results.
-
20 Question 20 Single choice Objective 2: Summarize the activities of the Technical Test Analyst within a risk-based approach for testing activities.
A financial reporting system is being prepared for release. The risk workshop produced a list of product risks, including incorrect currency rounding in month-end reports, slow dashboard loading, and cosmetic misalignment in the help pages. The test manager has time for about 60 percent of the planned test effort and asks the Technical Test Analyst how to allocate it. Which activity best applies a risk-based approach for this decision?
Correct Answer: DExplanationA risk-based approach ranks risks by likelihood and impact and then assigns effort proportionally, so the month-end rounding risk, which affects financial correctness, gets the most thorough testing while the cosmetic help-page risk receives reduced effort. Equal allocation ignores differences in impact. Testing in listing order is arbitrary. Dropping the most significant financial risk simply because it is hard to test is not a valid response to a constrained budget.
These are 20 of the 65 questions in the full ATTA pack.
Get All 65 QuestionsGet all 65 questions & answers
Full access options for ISTQB ATTA
Self-study
PDF Version
- 65 actual exam questions
- Compatible with all devices
- Printable PDF format
- No download limits
- 90 days free updates
- 24/7 customer support
Best value
Bundle Pack
- Discounted PDF + online access
- 65 actual exam questions
- Both PDF and online practice test
- Free 90 days updates
- No download or practice limits
- 24/7 customer support
Exam simulation
Online Practice Test
- 65 actual exam questions
- Actual exam environment
- 90 days free updates
- Browser-based software
- 24/7 customer support
100% Money Back Guarantee
Your success comes first
At DumpsProvider, we give you a 100% money back guarantee on all of our exam dumps. For us, your success is the #1 priority and we are more than confident that our exam material will help you pass the ATTA Exam (Advanced Technical Test Analyst) on your very first attempt.
In a rare case, if you fail your exam, we will refund your amount without asking a single question.