1 Question 1 Drag and drop EU 9 Tool Support (L1)
A regulated pharmaceutical company is selecting a requirements management tool for its clinical trial software. The procurement team must match each stated need to the tool capability that addresses it. The company must evaluate how the tool behaves in its own environment before committing, must show auditors who changed each requirement, and must ensure that the tool's data model fits its existing requirement types. Match each need to the tool aspect that addresses it.
Drag each item onto its matching target. On a phone: tap an item, then tap a target.
Verifying that the tool works with the company's existing project data and user roles before full rolloutProviding auditors with a record of who created and modified each requirement and whenEnsuring that the tool supports the company's own categories for functional and quality requirementsConnecting the tool to a stakeholder survey platform for elicitationConfiguring the tool's requirement attributes and types to match company categoriesPiloting the tool in a limited introduction phaseGenerating a graphical view of goal decomposition trees for executivesRecording change history and user attribution for each requirementCorrect Answer:- Verifying that the tool works with the company's existing project data and user roles before full rollout → Piloting the tool in a limited introduction phase
- Providing auditors with a record of who created and modified each requirement and when → Recording change history and user attribution for each requirement
- Ensuring that the tool supports the company's own categories for functional and quality requirements → Configuring the tool's requirement attributes and types to match company categories
ExplanationA limited pilot is the right way to check fit with existing data and roles before rollout, since it exposes problems in a low-risk setting. Change history with user attribution gives auditors the who-and-when trail they require. Configuring attributes and types lets the tool reflect the company's own requirement categories rather than generic ones. The survey platform link is an elicitation concern rather than a need stated here, and the goal tree view is a modelling output that does not address the three needs.
-
2 Question 2 Multiple choice EU 3 Requirements Elicitation (L2)
A telecom operator is preparing to elicit requirements for a new customer billing feature. The analyst has a limited budget and must choose elicitation techniques suited to the situation. Stakeholders include billing clerks who follow long-established procedures, a regulator whose rules are published in a long standards document, and a product manager who wants the team to discover features customers have not yet asked for. Which TWO actions are the most appropriate uses of elicitation techniques for this situation? (Choose two.)
Correct Answer: A, BExplanationThe regulator's rules are already documented, so analysing that document is an efficient document-centered technique that extracts compliance requirements. Discovering features customers have not yet requested is the purpose of a creativity workshop. The clerks' procedures are long and established, so observing them is the best way to confirm actual practice, which makes option E tempting, but it is not one of the two chosen because the stronger pair here is document analysis and creativity. The clerk survey asks people to self-report, which the stem's established procedures make unreliable, and the product manager's written vision alone omits the stakeholder views that elicitation must gather.
-
3 Question 3 Dropdown EU 7 Requirements validation and negotiation (L2)
A review team is planning how to validate the requirements for an emergency dispatch system. The team wants to use a validation technique that involves a structured reading of the requirements by people in different roles, each taking the viewpoint of a specific stakeholder such as a dispatcher or a maintenance engineer, so that defects specific to each viewpoint are found. Complete the planning statement by selecting the correct value for each blank.
Choose the correct value for each blank.
The team will apply reading, in which each reviewer checks the requirements from the viewpoint of a specific stakeholder, and will record defects in a document before the review meeting.Correct Answer:The team will apply perspective-based reading, in which each reviewer checks the requirements from the viewpoint of a specific stakeholder, and will record defects in a defect log document before the review meeting.
ExplanationPerspective-based reading is the validation technique in which reviewers adopt the viewpoints of named stakeholders, so it fits the need to surface viewpoint-specific defects. Checklist-based reading relies on a fixed list of questions rather than stakeholder viewpoints, and ad hoc reading has no structure. A defect log is the artefact that records findings for later correction. A baseline, configuration or traceability matrix belongs to requirements management and does not capture review defects.
-
4 Question 4 Single choice EU 2 System and System Context (L2)
A regional health insurer is replacing its claims portal. The analyst must define the system boundary before eliciting requirements. The portal will be operated by internal staff, but claims are submitted by external clinics through a web form, validated against a national eligibility service owned by a government agency, and paid through a bank's payment gateway. Regulators require that all clinic-facing and bank-facing behaviour be covered by contractual interface specifications. The project lead wants the scope to stay limited to what the team can build and test within the next nine months. Which definition of the system boundary is most appropriate?
Correct Answer: DExplanationThe system boundary encloses only what the insurer will build and control: the portal with its form, logic and data. The clinics, the national eligibility service and the bank gateway belong to the context, so their behaviour becomes assumptions and interface requirements rather than deliverables. Regulators' demand for contractual interface specifications is satisfied by documenting these context elements precisely. Including the eligibility service and gateway in the boundary would exceed the nine-month scope, and omitting the external actors entirely would hide the interfaces that drive requirements. Treating the whole insurance business as the system ignores the stated scope limit.
-
5 Question 5 Single choice EU 3 Requirements Elicitation (L2)
A logistics company is developing a driver scheduling app. A requirements analyst has already conducted stakeholder interviews with dispatchers and managers. Their decision on the next elicitation step depends on the constraints. Drivers work across three depots, speak four languages, and are rarely at a desk. The budget allows only two more elicitation sessions and the team must uncover unspoken tasks that drivers perform informally, such as swapping shifts through messages. Which elicitation technique is the BEST choice for this need?
Correct Answer: CExplanationObservation techniques are the right tool when stakeholders perform tasks they do not verbalise, such as informal shift swapping. Watching drivers in their real environment exposes these tacit practices. A questionnaire depends on drivers already knowing what to report, which they do not for unspoken habits, and it cannot be designed well for four languages without extra cost. A brainstorming workshop gathers ideas about possible features rather than observed behaviour, and drivers are hard to gather across three depots. Existing documentation describes the intended process, which is precisely what the informal practices deviate from.
-
6 Question 6 Single choice EU 4 Requirements Documentation (L2)
A medical device firm must document requirements for an infusion pump controller. The team is considering a mixed documentation form. Reviewers include clinical engineers who read natural language but do not model, and firmware engineers who need precise state behaviour. A certification body will audit the document for ambiguity. The team must choose the documentation approach that best supports both audiences and the audit. Which approach should they adopt?
Correct Answer: DExplanationA mixed form pairs the strengths of each documentation type. Natural language serves the clinical engineers and auditors who need the rationale, while a state-based model removes the ambiguity that prose introduces for the firmware engineers. Cross-referencing keeps the two consistent. Prose alone leaves the dynamic behaviour open to interpretation, which an audit will flag. A diagram alone cannot carry the rationale that reviewers need. Use case specifications capture interactions but not the detailed state transitions the firmware team requires, so they cannot replace all other forms.
-
7 Question 7 Single choice EU 5 Documentation of Requirements using Natural Language (L2)
A requirements engineer is reviewing a draft for a smart parking system. One requirement reads: 'The system shall show available spaces quickly to drivers.' The engineer must rewrite it using the five steps for formulating requirements with a requirements template, and the rewritten sentence must be verifiable by the test team, who will measure response time with a stopwatch on a standard tablet. Which rewritten requirement is correct?
Correct Answer: CExplanationThe correct formulation uses the mandatory 'shall' form, names the responsible system, states the action, and gives a measurable condition and threshold that the stopwatch test can confirm. The word 'quickly' in the original is replaced with two seconds and a percentile bound tied to normal load. The 'should ideally' option is optional and unmeasurable, so it cannot be verified. The 'optimised algorithm' option prescribes a solution rather than a requirement and still lacks a measurable bound. The 'acceptable to the operator' option relies on subjective acceptance that no test can decide.
-
8 Question 8 Single choice EU 6 Model-based Documentation of Requirements (L2)
A team is modelling goals for a hospital bed management system. The top goal is 'Reduce patient waiting time for a bed.' The team has identified that the goal is achieved only if bed availability is updated in real time and discharges are recorded promptly. Either of these two sub-goals alone is sufficient to reduce waiting time in pilot data, but both are needed for the full effect. The modellers must decide how to represent the refinement in a goal model. Which representation is correct?
Correct Answer: AExplanationThe scenario states that either sub-goal alone reduces waiting time in pilot data, so satisfying either one is sufficient for the parent goal. That is an OR-decomposition in an and/or goal tree. The AND option would wrongly demand both, contradicting the pilot evidence. A mixed AND/OR structure would only be justified if the sub-goals had different sufficiency conditions, which the stem does not describe. A flat list discards the refinement relationship that the model is meant to capture, and goal relationships apply to non-functional and business goals as well.
-
9 Question 9 Single choice EU 7 Requirements validation and negotiation (L2)
A bank's requirements team has completed a draft specification for a loan approval workflow. Stakeholders from credit risk and from customer service disagree about whether applicants may be asked to resubmit documents online or must always visit a branch. The project must sign off the specification in two weeks. The validation lead wants to choose the technique that will most effectively reveal this disagreement and drive it toward a documented decision, while also checking whether the draft is consistent with the bank's stated policy documents. Which action should the lead take next?
Correct Answer: AExplanationA formal inspection brings the relevant stakeholders together, checks the draft against the policy documents for consistency, and surfaces the disagreement so it can be recorded and negotiated. Written comments alone tend to leave the conflict unresolved and do not force a documented decision within the deadline. A prototype with end-user choice does not address the internal credit risk policy question and sidesteps the negotiation. A checklist checks completeness and style but cannot resolve a conflict between stakeholder groups, so it does not produce the decision the sign-off requires.
-
10 Question 10 Single choice EU 8 Requirements Management (L2)
A railway signalling company manages requirements in a configuration-controlled environment. Version 3.0 of its interlocking specification was baselined for a certification audit. Since then, a safety change request has modified two requirements, and a second change request for a diagnostic feature is in progress but not yet approved. The release team must produce the software build for the audit using only approved content, and the auditors need to see exactly which requirement versions were approved together. Which action best meets both needs?
Correct Answer: BExplanationA configuration is a defined selection of specific requirement versions, and a baseline is a frozen, approved configuration. Forming a new configuration from the baselined 3.0 versions plus only the approved safety changes gives the release team approved content and gives auditors a traceable record of exactly which versions were combined. Overwriting the baseline destroys the audit trail that the auditors need. Taking the newest version of everything would pull in the unapproved diagnostic work, which violates the approval rule. Deleting the in-progress feature loses work and does not fix the configuration selection.
-
11 Question 11 Order list EU 8 Requirements Management (L2)
A software house has received a change request asking to alter the response time requirement for a trading platform from 500 milliseconds to 200 milliseconds. The change affects two other requirements and a performance test suite, and the Change Control Board meets only once a week. The product owner wants the change processed correctly and wants to avoid implementing it before approval. Arrange the steps in the correct order.
Drag the steps into the correct order, or use the arrows.
- Submit the impact assessment and recommendation to the Change Control Board for a decision
- Implement the approved change and update the requirement versions and traceability links
- Verify the changed requirement and its dependants against the revised acceptance criteria
- Assess the impact of the change on linked requirements, the test suite and the architecture
- Record the change request with its description, reason and originator in the requirements tool
Correct Answer:- Assess the impact of the change on linked requirements, the test suite and the architecture
- Record the change request with its description, reason and originator in the requirements tool
- Submit the impact assessment and recommendation to the Change Control Board for a decision
- Implement the approved change and update the requirement versions and traceability links
- Verify the changed requirement and its dependants against the revised acceptance criteria
ExplanationThe change is first recorded so that it is traceable and has an identifiable originator and reason. Impact analysis then examines the linked requirements, test suite and architecture so the board has the facts it needs. The assessment goes to the Change Control Board, and only an approved change is implemented, which enforces the no-implementation-before-approval rule. Verification comes last, checking the changed requirement and its dependants against the revised criteria. Implementing before the board decision would violate the stated constraint, and verifying before implementation would check nothing new.
These are 11 of the 45 questions in the full IREB_CPRE_FL pack.
Get All 45 QuestionsGet all 45 questions & answers
Full access options for iSQI IREB_CPRE_FL
Self-study
PDF Version
- 45 actual exam questions
- Compatible with all devices
- Printable PDF format
- No download limits
- 90 days free updates
- 24/7 customer support
Best value
Bundle Pack
- Discounted PDF + online access
- 45 actual exam questions
- Both PDF and online practice test
- Free 90 days updates
- No download or practice limits
- 24/7 customer support
Exam simulation
Online Practice Test
- 45 actual exam questions
- Actual exam environment
- 90 days free updates
- Browser-based software
- 24/7 customer support
100% Money Back Guarantee
Your success comes first
At DumpsProvider, we give you a 100% money back guarantee on all of our exam dumps. For us, your success is the #1 priority and we are more than confident that our exam material will help you pass the IREB_CPRE_FL Exam (IREB Certified Professional for Requirements Engineering – Foundation Level) on your very first attempt.
In a rare case, if you fail your exam, we will refund your amount without asking a single question.