1 Question 1 Single choice Configuration and Quotation Guide for Enterprise Products
A regional hospital chain is quoting a GPON access network for six sites. Each site has a central equipment room with a 19-inch cabinet and needs 1 Gbit/s service to 48 user endpoints, with the expectation that subscriber counts will double within three years. The customer wants the quotation to avoid replacing the OLT when expansion happens and to keep the initial spend low. The sales engineer must select the OLT configuration. Which approach best meets these requirements?
Correct Answer: AExplanationA modular chassis OLT lets the quotation include only the boards and power modules needed today while keeping empty slots for future PON cards, so expansion is a board purchase rather than a platform replacement. Fully populating the chassis inflates initial cost, which the customer explicitly wants to avoid. A compact fixed OLT cannot be grown by adding slots, so it fails the no-replacement requirement. Cascading splitters to multiply ports degrades optical budget and does not add OLT capacity at all.
-
2 Question 2 Single choice GPON Principle Introduction
A distribution network operator reports that a GPON tree serving 32 ONUs shows intermittent loss of service on a subset of ONUs at the far end of the tree. Investigation shows the ONUs are registering successfully and then dropping. The OLT logs show repeated ONU deactivations with the same ONU IDs. The team wants to identify the most likely cause using the GPON timing and ranging mechanism before physically visiting sites. Which conclusion is most consistent with the symptoms?
Correct Answer: CExplanationIn GPON, ranging measures each ONU's round-trip delay so the OLT can equalize upstream timing; if the delay compensation drifts or is wrong for far-end ONUs, their bursts overlap others and the ONUs lose synchronization. Repeated deactivation of specific ONUs after successful registration points at this timing problem. An ID pool shortage would prevent registration rather than cause mid-session drops. AES key rotation affects downstream decryption, not upstream burst collisions. A fixed DBA grant size reduces bandwidth fairness but would not cause deactivations by itself.
-
3 Question 3 Single choice Huawei Enterprise Access Network Solution Overview
A university campus plans to deploy a Green Intelligent OptiX access network to serve academic buildings, a library and a student residence. The IT director wants the solution to reduce power consumption at night when lecture rooms are empty, and also wants a single management view across the optical access layer. The procurement team is comparing Ethernet switch uplinks with the optical design. Which element of the optical access solution best meets the energy and management requirements together?
Correct Answer: CExplanationA centralised management system provides the single view the director asked for, and it can schedule energy-saving behaviour on access devices according to time-based policies, which matches the night-time requirement. Extra uplink ports add power rather than reduce it. Unmanaged passive ONTs cannot be monitored and do not fit a managed optical deployment at all. Separate local controllers per building break the single-view requirement and multiply operational overhead.
-
4 Question 4 Single choice Huawei FTTH Solution Introduction
An ISP is designing an FTTH rollout for a new residential estate of 600 homes. The customer premises must support IPTV and high-speed broadband, and the ISP wants to keep fibre cabling inside the estate minimal and to deliver optical signals to each home from a shared distribution point. The engineering team asks which network architecture element should be used to split the feeder fibre to the homes in the most economical way while maintaining an acceptable optical budget. Which choice is most appropriate?
Correct Answer: CExplanationA PON architecture uses passive splitters to share one feeder fibre among many homes, and placing the splitter in a distribution point near the estate minimises feeder fibre and aligns with the cost goal. Dedicated point-to-point fibre per home is costly and ignores the economical sharing the ISP wants. Active switches with copper do not deliver the FTTH optical design requested. A single splitter at the central office with 600 direct fibres defeats the purpose of splitting and makes the feeder and cabling uneconomical.
-
5 Question 5 Single choice Huawei FTTM Solution Introduction
A property management company operates a 14-storey residential building and wants to upgrade internet access to multi-gigabit speeds for tenants without rewiring every apartment. The building has existing structured cabling in the riser shafts, and the owner wants to keep disruption to tenants minimal. A proposal uses fibre to the multi-dwelling-unit location, with the last segment reusing existing in-building wiring. The sales consultant must explain why this design suits the constraints. Which statement is correct?
Correct Answer: CExplanationFTTM, fibre to the multi-dwelling unit, carries fibre to a building-level access point and then uses the existing in-building wiring for the final stretch, which limits disruption and cost for tenants. The statement that fibre terminates at each apartment describes FTTH, not FTTM. Placing OLTs in each apartment is not how the architecture works, since the OLT sits in the operator's equipment, not in units. FTTM is specifically designed to work with existing buildings, so the claim that it only fits greenfield sites is wrong.
-
6 Question 6 Single choice Huawei FTTO Solution Introduction
A manufacturing company is building a new office block that needs gigabit connectivity for staff workstations, VoIP phones and surveillance cameras. The facilities manager wants power delivered to cameras and phones over the same cabling used for data to reduce installation work. The architect has specified that workstation drops must stay within the cabling standard distance from the telecom room. Which FTTO design choice satisfies both the power delivery and distance requirements?
Correct Answer: CExplanationIn an FTTO design, an optical terminal in the floor telecom room converts the fibre feed to Ethernet, and the copper run to each device stays within the standard limit while the same cabling can deliver power to phones and cameras. Fibre alone does not carry power to endpoints, so the first option is wrong. A basement OLT with no terminal device leaves nothing to convert to Ethernet for the endpoints. Wireless access points ignore the requirement to power and wire the cameras and phones over the cabling the facilities manager wants.
-
7 Question 7 Single choice Configuration and Quotation Guide for Enterprise Products
A sales engineer is quoting ONTs for a hotel chain that wants each guest room to have voice, data and a single Wi-Fi access point connected through the ONT. Some rooms have only a single RJ45 port available behind the wall socket, while others have a voice line and two data ports. The customer wants to avoid over-buying ports and has a strict budget. The engineer must choose the ONT configuration for each room type. Which quotation decision is most appropriate?
Correct Answer: CExplanationMatching ONT port configuration to each room's actual service ports avoids over-buying while still meeting voice and data needs, which is the right way to balance the strict budget. Standardising on the highest-port model inflates cost without benefit in single-port rooms. ONU and ONT are not interchangeable in the quotation logic here, and the cost claim does not hold across all cases. A pure media converter does not supply the voice and multi-port service profile the rooms require.
-
8 Question 8 Multiple choice GPON Principle Introduction
A telecom operator is preparing a GPON network to carry triple-play services for a new housing development. The planning team wants the design to support per-subscriber bandwidth guarantees and to keep ONU provisioning simple for field technicians. Which TWO elements should the design include to meet these requirements? (Choose two.)
Correct Answer: C, DExplanationDynamic bandwidth allocation profiles with assured and maximum bandwidth let the OLT guarantee per-subscriber rates while sharing upstream capacity, and OMCI lets the OLT provision ONU service ports centrally, which removes manual work for technicians. Static timeslots assigned in the factory cannot adapt to registration or traffic demand. Disabling encryption does not improve bandwidth guarantees and weakens security. A fibre pair per subscriber abandons the shared PON design the operator chose and is far too costly.
-
9 Question 9 Single choice Huawei Enterprise Access Network Solution Overview
A logistics company operates warehouses where tenants are billed for network usage, and the operator needs to charge each tenant based on actual bandwidth consumed on an access port while preventing one tenant from degrading others. The operator is selecting between two QoS approaches on the optical access side. Which approach should the solution architect recommend?
Correct Answer: AExplanationPer-port traffic profiles with committed and peak rates let the operator enforce each tenant's contracted bandwidth at the access edge, which both protects other tenants and supports accurate metering for billing. Relying on the upstream network to shape traffic later leaves the access port unprotected in the meantime. Disabling scheduling gives equal shares that ignore contracts and can waste capacity. Ignoring upstream limits contradicts the stated need for billing on actual consumption in both directions.
-
10 Question 10 Single choice Huawei FTTH Solution Introduction
An ISP's FTTH deployment uses a passive optical splitter with an optical budget that is nearly exhausted at the longest drop. Field measurements show that ONUs at the far end of the network are intermittently failing to reach the required receive power, while near ones work correctly. The ISP has a limited budget for changes and must restore reliability without redesigning the whole network. Which action is the best first step?
Correct Answer: AExplanationBecause the problem appears only at the far end and the budget is nearly exhausted, the first sensible step is to measure the actual link loss on the longest drop and locate excess loss from poor splices or connectors, which is inexpensive and targeted. Replacing all ONUs is costly and ignores the location-specific pattern. Adding a splitter stage increases loss and worsens the budget. Raising OLT transmit power is not a substitute for fixing the excess loss and may exceed limits for near users.
-
11 Question 11 Single choice Huawei FTTM Solution Major Scenarios
A city housing authority is upgrading several older multi-dwelling buildings. Each building has a riser with copper telephone pairs that are in poor condition. The authority needs broadband reaching every unit within six months and has limited funds, so it cannot pay for full in-building rewiring. Management also requires that the solution can be extended later to fibre-to-the-home without replacing the building-level equipment. Which deployment decision best fits these constraints?
Correct Answer: BExplanationA building-level optical unit fed by fibre, with distribution over the existing risers, meets the six-month deadline and low budget while leaving a path to later FTTH without replacing that building-level equipment. Full rewiring before deployment breaks the timeline and the budget. A wireless bridge to each apartment is unlikely to reach every unit reliably and adds recurring cost. Upgrading only the exchange leaves the poor copper risers in place, so tenants do not get the service the authority needs.
-
12 Question 12 Multiple choice Huawei FTTO Solution Sale Scenarios
A bank is upgrading the access network for a branch office spread over two floors. Teller stations need low-latency connectivity and power for thin-client terminals, and security cameras need power over the same cabling. The bank wants a design that is serviceable, uses the existing telecom rooms and supports future expansion of the endpoint count. Which TWO design decisions best meet these requirements? (Choose two.)
Correct Answer: B, DExplanationFloor-level optical terminals with copper runs inside the standard distance deliver the low-latency connection and allow power over the same copper, while spare ports give room to grow without new fibre. Running fibre to every desk with local adapters adds cost and loses the power-over-cabling benefit the bank wants. Long copper runs beyond the standard distance break the cabling limit, and moving cameras to wireless ignores the requirement to power them over the same cabling.
These are 12 of the 60 questions in the full H19-413_V1.0 pack.
Get All 60 QuestionsGet all 60 questions & answers
Full access options for Huawei H19-413_V1.0
Self-study
PDF Version
- 60 actual exam questions
- Compatible with all devices
- Printable PDF format
- No download limits
- 90 days free updates
- 24/7 customer support
Best value
Bundle Pack
- Discounted PDF + online access
- 60 actual exam questions
- Both PDF and online practice test
- Free 90 days updates
- No download or practice limits
- 24/7 customer support
Exam simulation
Online Practice Test
- 60 actual exam questions
- Actual exam environment
- 90 days free updates
- Browser-based software
- 24/7 customer support
100% Money Back Guarantee
Your success comes first
At DumpsProvider, we give you a 100% money back guarantee on all of our exam dumps. For us, your success is the #1 priority and we are more than confident that our exam material will help you pass the H19-413_V1.0 Exam (HCSA-Presales-Access V1.0) on your very first attempt.
In a rare case, if you fail your exam, we will refund your amount without asking a single question.