2026 Actual Huawei H19-315 Dumps, Updated Exam Questions for Guaranteed Pass

HCSA-Presales-Transmission & Access - Free Practice Questions with Explanations, Exam Dumps, and Complete Practice Pack from DumpsProvider.

Exam Information

VendorHuawei
Exam codeH19-315
Exam nameHCSA-Presales-Transmission & Access
Questions in pack107
Last updatedNovember 21, 2026
Related certificationsHuawei Certified Sales Associate

Free practice questions with explanations

Huawei H19-315 Practice Questions

Answer a question to see the correct answer and the explanation, or click Show answer. Newest questions first.

Questions
14
Answered
0
Correct
0
Score
-
  1. 1 Question 1 Single choice Optical Network Fundamentals

    A metro operator plans a 96 km point-to-point DWDM link between two data centres using standard single-mode fibre at 1550 nm with an average attenuation of 0.22 dB/km. The design includes two connectors at each end (0.5 dB each), one splice every 4 km (0.05 dB each, approximately 24 splices), and a 3 dB safety margin. The 100G coherent transponders have a launch power of 0 dBm and a receiver sensitivity of -22 dBm. Which statement about the loss budget is correct?
    A. The link fails because total loss exceeds 25 dB once the safety margin is added.
    B. The link passes, because channel loss is about 25.4 dB against a 22 dB available budget only after the margin is excluded.
    C. The link fails, because the 3 dB margin must be deducted from the launch power before comparing it with sensitivity.
    D. The link passes, because the 3 dB margin is already included in the -22 dBm receiver sensitivity.

  2. 2 Question 2 Single choice Access Network Solutions

    A residential operator must serve a new apartment block of 240 units with the aim of delivering 300 Mbit/s symmetrical service to each unit at the lowest cost per home passed. The building has an existing internal copper riser that is in poor condition. The operator's engineers are weighing a GPON deployment with a 1:32 split ratio, the same design with a 1:64 split, and VDSL2 vectoring from a street cabinet. The client insists that any new design must avoid active equipment in the building basement and must support future upgrade to 10G-capable access. Which solution should the pre-sales engineer recommend?
    A. VDSL2 vectoring from a cabinet, because the existing copper riser can be reused.
    B. GPON with a 1:64 split, because it halves the number of OLT ports while still meeting the bandwidth target.
    C. GPON with a 1:32 split and a passive splitter cascade in the riser, because it avoids basement equipment.
    D. FTTH with a GPON 1:32 split, because each PON carries 300 Mbit/s per unit at the splitter output.

  3. 3 Question 3 Single choice Network Management Systems

    A national fixed-line operator operates an OptiX-based OTN network managed by iManager U2000. During a monthly review, the NOC notices that a 100G wavelength between two sites shows rising pre-FEC bit error rate over five days, but no alarms have been raised. The operator wants to detect such gradual degradation automatically and report it to the capacity planning team without increasing NMS polling load on all devices. Which U2000 capability should the pre-sales engineer recommend?
    A. Configure a threshold-crossing alert on the performance counters and collect them at the default 15-minute granularity.
    B. Enable real-time active alarm forwarding to an SNMP trap receiver for all optical boards.
    C. Schedule a daily database backup and compare configuration files to find signal degradation.
    D. Configure a fault-reporting filter that suppresses low-severity alarms so degradation is escalated sooner.

  4. 4 Question 4 Single choice Service Planning and Design

    A regional carrier wants to expand its OTN backbone from 10G to 100G on a ring of six sites. Current traffic is 42 Gbit/s peak, forecast to grow at 35 percent per year. The carrier's board requires the lowest total capital cost over five years and insists that the ring keep a shared protection path at each node. The client already owns 40 spare 10G client-side ports, and a supplier offers 100G line cards that can be installed in the existing shelves. Which proposal best satisfies all constraints?
    A. Deploy 100G line cards in the existing shelves now, and add a new parallel ring for protection in year three.
    B. Keep 10G links, add a second 10G wavelength per span each year, and reserve the spare client ports for future services.
    C. Replace the whole ring with a new 400G platform from day one, because growth cannot be predicted reliably.
    D. Upgrade to 100G line cards in the existing shelves with shared ring protection and phase the wavelength additions as traffic grows.

  5. 5 Question 5 Single choice Transport Network Technologies

    A metropolitan operator runs an SDH ring carrying E1 and STM-1 leased-line services. After a fibre cut, a customer reports that a 2 Mbit/s circuit was restored but its clock now shows a frequency offset that causes periodic slips in the customer's PBX. The ring currently has no clock hierarchy plan, and the nodes all derive timing from a single line-facing source. The operator must not change the physical topology and wants the most appropriate fix. Which action should the pre-sales consultant recommend first?
    A. Replace the E1 services with packet-based Ethernet circuits to eliminate the need for synchronisation.
    B. Configure SSM and synchronisation source priorities so each node derives timing from a designated primary reference with a defined fallback.
    C. Enable 1+1 MSP on every STM-1 section so the ring always has a protected timing path.
    D. Increase the ring's VC-12 bandwidth allocation to reduce the impact of clock slips.

  6. 6 Question 6 Single choice Optical Network Fundamentals

    A pre-sales engineer is asked to recommend the fibre type for an 80 km CWDM-to-DWDM upgrade on a campus-to-metro route. The route uses legacy G.652 fibre that has been measured at 0.35 dB/km at 1310 nm and 0.22 dB/km at 1550 nm. The customer plans to deploy 16 DWDM channels at 100 GHz spacing across the C-band, and wants to avoid unnecessary new fibre installation. The transceivers are rated for chromatic dispersion tolerance of 1600 ps/nm. The engineer computes dispersion at 17 ps/(nm x km) for G.652 at 1550 nm. Which action should be recommended?
    A. Replace the route with G.655 fibre, because its zero-dispersion wavelength lies within the C-band and dispersion tolerance will be exceeded otherwise.
    B. Keep the G.652 fibre and add dispersion compensation sized to the link, since 80 km gives about 1360 ps/nm of dispersion, within the transceiver tolerance.
    C. Keep the G.652 fibre and operate at 1310 nm to avoid chromatic dispersion entirely.
    D. Replace the route with G.653 fibre, because its low attenuation at 1550 nm solves both loss and dispersion problems.

  7. 7 Question 7 Single choice Network Management Systems

    A utility company runs an OTN network with 14 OptiX nodes managed by iManager U2000. A security audit requires that all configuration changes be traceable to a named operator and that operators be restricted to the regions they support. Two engineers have been given the same administrator account to speed up shift changes. The client wants the fix applied without rebuilding the network. Which action should the pre-sales engineer propose as the first step?
    A. Restrict the shared administrator account to read-only mode on all nodes so that changes can only be made through a central approval process.
    B. Create individual user accounts in U2000 with role-based permissions scoped to each region, and disable the shared account.
    C. Enable syslog forwarding from each node to the audit server so that the shared account activity is logged.
    D. Require the shared account password to be changed each shift and store it in a secure vault.

  8. 8 Question 8 Dropdown Transport Network Technologies

    An OTN operator is configuring the protection for an ODU2 service between two sites that must restore within 50 ms when a fibre fails. The engineer is using a shared mesh of OTN ring nodes. The engineer's command sequence sets the protection mode and the trigger for the ODU2 tunnel. Which pair of values fits the requirement? Choose the correct value for each blank.

    Choose the correct value for each blank.

    protection-group create type mode
    A. SNCP; revertive
    B. SNCP; non-revertive
    C. SNCN; revertive
    D. ODUk-SPRing; non-revertive
  9. 9 Question 9 Single choice Access Network Solutions

    A fixed-access operator is upgrading a fibre-to-the-cabinet network in which a cabinet serves 48 VDSL2 lines through a DSLAM. Many lines have been measured at 800 m or longer from the cabinet, and some customers have bonded copper pairs that are cross-talk limited. The operator wants to reach 100 Mbit/s downstream on the majority of lines within a fixed upgrade budget and without replacing the copper plant. Which measure should the engineer recommend as the most effective first step?
    A. Enable vectoring on the DSLAM to cancel crosstalk among the lines in the same binder.
    B. Move all customers to a G.fast deployment at the same cabinet with no further analysis.
    C. Replace the cabinet with a larger one to accommodate additional DSLAM cards.
    D. Increase the DSLAM downstream power on every line to overcome the attenuation at 800 m.

  10. 10 Question 10 Order list Network Management Systems

    A service provider wants to deploy a new iManager U2000 instance to monitor an OTN network of 30 nodes. The deployment must give the NOC fault visibility before the performance collection and alarm policy are tuned. Place the following steps in the correct order. A. 2, 4, 1, 3 B. 2, 1, 4, 3 C. 1, 2, 4, 3 D. 2, 4, 3, 1 Drag the steps into the correct order.

    Drag the steps into the correct order, or use the arrows.

    1. Configure the alarm forwarding and performance collection policies.
    2. Import the node list and confirm each device is in a managed state.
    3. Install the U2000 server and configure the database and network interfaces.
    4. Add the required users and assign role-based permissions.
  11. 11 Question 11 Multiple choice Service Planning and Design

    A carrier is designing a PTN-based backhaul for 8 mobile base stations that require synchronisation at 1588 frequency accuracy and a committed bandwidth of 1 Gbit/s per site. The budget excludes new fibre, and the operator wants the design to reduce the risk of a single failure taking several sites offline. Which two design choices best meet these requirements? (Choose two.)
    A. Deploy a dual-homed ring topology with tunnel protection, so each site has two independent paths to the aggregation node.
    B. Use a single PTN core node with all base stations homed to it, to simplify timing distribution.
    C. Provision a traffic engineering tunnel with bandwidth reserved for each base station's committed rate and enable QoS scheduling for the synchronisation class.
    D. Rely on best-effort IP forwarding through an existing enterprise network to carry the backhaul at no additional cost.
    E. Deploy GPS receivers at each base station instead of a network timing reference, to meet the accuracy target.

  12. 12 Question 12 Single choice Optical Network Fundamentals

    An engineer is matching optical impairments to the design measures that address them in a 10G DWDM metro deployment. Match each item to the best measure.
    1. Chromatic dispersion accumulation over the link
    2. Attenuation and insertion loss at each passive node
    3. Four-wave mixing between closely spaced channels
    A. 1 - Dispersion compensation; 2 - Optical amplifier; 3 - Non-zero dispersion fibre
    B. 1 - Optical amplifier; 2 - Dispersion compensation; 3 - Optical amplifier
    C. 1 - Non-zero dispersion fibre; 2 - Dispersion compensation; 3 - Optical amplifier
    D. 1 - Dispersion compensation; 2 - Non-zero dispersion fibre; 3 - Optical amplifier

  13. 13 Question 13 Single choice Access Network Solutions

    A PON operator is commissioning a GPON network that serves an industrial park. One of the splitter outputs supplies four ONTs at 2.5 km from the OLT, and the operator has measured one ONT as failing to register after a fibre patch was replaced. The engineer confirms the optical power at that ONT is within specification and the OLT shows the ONT as offline. The OLT is configured with serial-number-based authorisation and the ONT was pre-provisioned with a different serial in the service profile. Which action should the engineer take to restore the service with the least disruption?
    A. Replace the ONT with a spare, because the optical power measurement proves the device is faulty.
    B. Reduce the OLT transmit power on that PON port so the ONT can register at a lower receive level.
    C. Correct the ONT serial number binding in the OLT configuration to match the physical device, then re-register the ONT.
    D. Move the ONT to a different PON port on the OLT, because the port binding is preventing registration.

  14. 14 Question 14 Single choice Transport Network Technologies

    A carrier is migrating a legacy SDH network to an OTN-based core and must keep an existing STM-16 service running at all times. The migration plan proposes mapping the SDH STM-16 traffic into ODU1 containers on the OTN side and handling client-side alarms through the new platform. The engineer must choose the cutover method that avoids interruption and keeps the existing protection behaviour intact for the duration of the migration. Which method should be recommended?
    A. Cut over the full STM-16 service in a single maintenance window, then add the protection afterwards.
    B. Provision the ODU1 path in parallel, verify alarms and performance on the new platform, then switch the traffic with a hitless path move.
    C. Remove the SDH protection before the migration to simplify the new configuration.
    D. Connect the STM-16 service to the OTN platform using an unprotected client port and run both networks without verification.

These are 14 of the 107 questions in the full H19-315 pack.

Get All 107 Questions

Get all 107 questions & answers

717 Satisfied customers
95.7% Pass rate feedback
82.8% Said questions matched
92% Found material helpful

Full access options for Huawei H19-315

Self-study

PDF Version

$40.00 $20.00
  • 107 actual exam questions
  • Compatible with all devices
  • Printable PDF format
  • No download limits
  • 90 days free updates
  • 24/7 customer support

Exam simulation

Online Practice Test

$50.00 $25.00
  • 107 actual exam questions
  • Actual exam environment
  • 90 days free updates
  • Browser-based software
  • 24/7 customer support

100% Money Back Guarantee

Your success comes first

At DumpsProvider, we give you a 100% money back guarantee on all of our exam dumps. For us, your success is the #1 priority and we are more than confident that our exam material will help you pass the H19-315 Exam (HCSA-Presales-Transmission & Access) on your very first attempt.

In a rare case, if you fail your exam, we will refund your amount without asking a single question.

100%

Security & Privacy

10000+

Satisfied Customers

24/7

Committed Service

100%

Money Back Guranteed