Exam Information
Free practice questions with explanations
Huawei H19-315 Practice Questions
Answer a question to see the correct answer and the explanation, or click Show answer. Newest questions first.
- Questions
- 14
- Answered
- 0
- Correct
- 0
- Score
- -
-
1 Question 1 Single choice Optical Network Fundamentals
A metro operator plans a 96 km point-to-point DWDM link between two data centres using standard single-mode fibre at 1550 nm with an average attenuation of 0.22 dB/km. The design includes two connectors at each end (0.5 dB each), one splice every 4 km (0.05 dB each, approximately 24 splices), and a 3 dB safety margin. The 100G coherent transponders have a launch power of 0 dBm and a receiver sensitivity of -22 dBm. Which statement about the loss budget is correct?
A. The link fails because total loss exceeds 25 dB once the safety margin is added.
B. The link passes, because channel loss is about 25.4 dB against a 22 dB available budget only after the margin is excluded.
C. The link fails, because the 3 dB margin must be deducted from the launch power before comparing it with sensitivity.
D. The link passes, because the 3 dB margin is already included in the -22 dBm receiver sensitivity.Correct Answer: DExplanationFibre loss is 96 x 0.22 = 21.12 dB, connectors add 2.0 dB, and splices add about 1.2 dB, so the passive loss is roughly 24.3 dB. Adding the 3 dB margin gives about 27.3 dB against an available budget of 0 dBm minus -22 dBm = 22 dB, so the link fails. The stated design is wrong because the margin must be included in the budget, not deducted from the launch power. The option claiming the margin is already in sensitivity misreads a receiver specification as a design allowance. The option treating the margin as excluded reverses the logic, since margin is the part that reduces the usable budget.
-
2 Question 2 Single choice Access Network Solutions
A residential operator must serve a new apartment block of 240 units with the aim of delivering 300 Mbit/s symmetrical service to each unit at the lowest cost per home passed. The building has an existing internal copper riser that is in poor condition. The operator's engineers are weighing a GPON deployment with a 1:32 split ratio, the same design with a 1:64 split, and VDSL2 vectoring from a street cabinet. The client insists that any new design must avoid active equipment in the building basement and must support future upgrade to 10G-capable access. Which solution should the pre-sales engineer recommend?
A. VDSL2 vectoring from a cabinet, because the existing copper riser can be reused.
B. GPON with a 1:64 split, because it halves the number of OLT ports while still meeting the bandwidth target.
C. GPON with a 1:32 split and a passive splitter cascade in the riser, because it avoids basement equipment.
D. FTTH with a GPON 1:32 split, because each PON carries 300 Mbit/s per unit at the splitter output.Correct Answer: BExplanationA full FTTH design with a GPON 1:32 split delivers fibre to every unit and keeps the passive network free of basement electronics, which satisfies the client rule. The shared 2.5 Gbit/s downstream and 1.25 Gbit/s upstream per PON make 300 Mbit/s symmetrical only borderline across 32 users, so the operator should size it with XG-PON or 10G-capable upgrade paths in mind. VDSL2 depends on the degraded copper riser and cannot meet symmetrical 300 Mbit/s at this distance. The 1:64 split further divides an already tight capacity, and the cascaded passive riser splitter option ignores that a PON's per-user share is the real constraint.
-
3 Question 3 Single choice Network Management Systems
A national fixed-line operator operates an OptiX-based OTN network managed by iManager U2000. During a monthly review, the NOC notices that a 100G wavelength between two sites shows rising pre-FEC bit error rate over five days, but no alarms have been raised. The operator wants to detect such gradual degradation automatically and report it to the capacity planning team without increasing NMS polling load on all devices. Which U2000 capability should the pre-sales engineer recommend?
A. Configure a threshold-crossing alert on the performance counters and collect them at the default 15-minute granularity.
B. Enable real-time active alarm forwarding to an SNMP trap receiver for all optical boards.
C. Schedule a daily database backup and compare configuration files to find signal degradation.
D. Configure a fault-reporting filter that suppresses low-severity alarms so degradation is escalated sooner.Correct Answer: BExplanationPerformance monitoring with threshold-crossing alerts is the right tool for gradual degradation that never raises an active alarm, and the default 15-minute counters give trend visibility without loading the devices with constant polling. Real-time alarm forwarding only passes alarms that have already been raised, which is why it missed this case. Daily configuration backups tell the team nothing about signal quality. Suppressing low-severity alarms hides the very symptoms that the operator needs to see.
-
4 Question 4 Single choice Service Planning and Design
A regional carrier wants to expand its OTN backbone from 10G to 100G on a ring of six sites. Current traffic is 42 Gbit/s peak, forecast to grow at 35 percent per year. The carrier's board requires the lowest total capital cost over five years and insists that the ring keep a shared protection path at each node. The client already owns 40 spare 10G client-side ports, and a supplier offers 100G line cards that can be installed in the existing shelves. Which proposal best satisfies all constraints?
A. Deploy 100G line cards in the existing shelves now, and add a new parallel ring for protection in year three.
B. Keep 10G links, add a second 10G wavelength per span each year, and reserve the spare client ports for future services.
C. Replace the whole ring with a new 400G platform from day one, because growth cannot be predicted reliably.
D. Upgrade to 100G line cards in the existing shelves with shared ring protection and phase the wavelength additions as traffic grows.Correct Answer: DExplanationInstalling 100G line cards in the existing shelves reuses capital already in place, and phasing the wavelength additions matches the 35 percent growth curve to spend. Shared ring protection meets the board requirement without a second physical ring. Adding a parallel ring in year three is a costly overbuild that the requirement does not call for. Staying on 10G multiplies wavelengths and fibre usage over time and quickly becomes more expensive than 100G. Replacing the ring with 400G from day one front-loads cost and ignores the forecast that only needs 100G capacity for several years.
-
5 Question 5 Single choice Transport Network Technologies
A metropolitan operator runs an SDH ring carrying E1 and STM-1 leased-line services. After a fibre cut, a customer reports that a 2 Mbit/s circuit was restored but its clock now shows a frequency offset that causes periodic slips in the customer's PBX. The ring currently has no clock hierarchy plan, and the nodes all derive timing from a single line-facing source. The operator must not change the physical topology and wants the most appropriate fix. Which action should the pre-sales consultant recommend first?
A. Replace the E1 services with packet-based Ethernet circuits to eliminate the need for synchronisation.
B. Configure SSM and synchronisation source priorities so each node derives timing from a designated primary reference with a defined fallback.
C. Enable 1+1 MSP on every STM-1 section so the ring always has a protected timing path.
D. Increase the ring's VC-12 bandwidth allocation to reduce the impact of clock slips.Correct Answer: AExplanationTiming on an SDH ring is governed by the synchronisation distribution plan, and using SSM to set source priorities with a defined fallback is the correct way to restore a consistent clock hierarchy without changing topology. Multiplex section protection protects traffic paths, not the timing chain, so it does not fix frequency offset. Adding VC-12 bandwidth has no bearing on clock accuracy. Moving the customer to Ethernet abandons the stated requirement to keep existing E1 services and is not a first fix.
-
6 Question 6 Single choice Optical Network Fundamentals
A pre-sales engineer is asked to recommend the fibre type for an 80 km CWDM-to-DWDM upgrade on a campus-to-metro route. The route uses legacy G.652 fibre that has been measured at 0.35 dB/km at 1310 nm and 0.22 dB/km at 1550 nm. The customer plans to deploy 16 DWDM channels at 100 GHz spacing across the C-band, and wants to avoid unnecessary new fibre installation. The transceivers are rated for chromatic dispersion tolerance of 1600 ps/nm. The engineer computes dispersion at 17 ps/(nm x km) for G.652 at 1550 nm. Which action should be recommended?
A. Replace the route with G.655 fibre, because its zero-dispersion wavelength lies within the C-band and dispersion tolerance will be exceeded otherwise.
B. Keep the G.652 fibre and add dispersion compensation sized to the link, since 80 km gives about 1360 ps/nm of dispersion, within the transceiver tolerance.
C. Keep the G.652 fibre and operate at 1310 nm to avoid chromatic dispersion entirely.
D. Replace the route with G.653 fibre, because its low attenuation at 1550 nm solves both loss and dispersion problems.Correct Answer: AExplanationAt 17 ps/(nm x km), 80 km of G.652 gives about 1360 ps/nm, which is within the 1600 ps/nm tolerance, so the link is viable with a compensation module sized to fit. The mistaken plan to replace fibre with G.655 is unnecessary once the calculation shows the tolerance is met, and G.655 is aimed at dense long-haul designs rather than this route. Operating at 1310 nm removes the C-band DWDM channel plan the customer requires. G.653 places the zero-dispersion point at 1550 nm, which is poorly suited to DWDM because it invites four-wave mixing, so it would be the wrong answer.
-
7 Question 7 Single choice Network Management Systems
A utility company runs an OTN network with 14 OptiX nodes managed by iManager U2000. A security audit requires that all configuration changes be traceable to a named operator and that operators be restricted to the regions they support. Two engineers have been given the same administrator account to speed up shift changes. The client wants the fix applied without rebuilding the network. Which action should the pre-sales engineer propose as the first step?
A. Restrict the shared administrator account to read-only mode on all nodes so that changes can only be made through a central approval process.
B. Create individual user accounts in U2000 with role-based permissions scoped to each region, and disable the shared account.
C. Enable syslog forwarding from each node to the audit server so that the shared account activity is logged.
D. Require the shared account password to be changed each shift and store it in a secure vault.Correct Answer: AExplanationPer-user accounts with role and region scope are what make changes attributable and enforce least privilege, and disabling the shared account removes the root cause of the audit finding. Logging activity against a shared account still cannot identify which engineer made a change. Rotating the password each shift does nothing to tie actions to people. Read-only access would block the engineers from doing their jobs and does not address traceability for changes that are still allowed.
-
8 Question 8 Dropdown Transport Network Technologies
An OTN operator is configuring the protection for an ODU2 service between two sites that must restore within 50 ms when a fibre fails. The engineer is using a shared mesh of OTN ring nodes. The engineer's command sequence sets the protection mode and the trigger for the ODU2 tunnel. Which pair of values fits the requirement? Choose the correct value for each blank.
Choose the correct value for each blank.
protection-group create type mode
A. SNCP; revertive
B. SNCP; non-revertive
C. SNCN; revertive
D. ODUk-SPRing; non-revertiveCorrect Answer:protection-group create type SNCP mode non-revertive
A. SNCP SNCP; non-revertive revertive
B. SNCP SNCP; non-revertive non-revertive
C. SNCP SNCN; non-revertive revertive
D. SNCP ODUk-SPRing; non-revertive non-revertiveExplanationA sub-network connection protection is the mode that switches a path at the tunnel level within the 50 ms target, and choosing non-revertive keeps the restored path stable after the fibre repair so that the service is not switched back on a brief recovery. Revertive operation moves traffic back when the fault clears, which the design should avoid to prevent a second hit. SNCN is a sub-network connection protection variant tied to a different trigger model, not the mode the scenario calls for. A shared ring protection type is named in the stem as a mesh design, which contradicts the requirement for a tunnel-level switch.
-
9 Question 9 Single choice Access Network Solutions
A fixed-access operator is upgrading a fibre-to-the-cabinet network in which a cabinet serves 48 VDSL2 lines through a DSLAM. Many lines have been measured at 800 m or longer from the cabinet, and some customers have bonded copper pairs that are cross-talk limited. The operator wants to reach 100 Mbit/s downstream on the majority of lines within a fixed upgrade budget and without replacing the copper plant. Which measure should the engineer recommend as the most effective first step?
A. Enable vectoring on the DSLAM to cancel crosstalk among the lines in the same binder.
B. Move all customers to a G.fast deployment at the same cabinet with no further analysis.
C. Replace the cabinet with a larger one to accommodate additional DSLAM cards.
D. Increase the DSLAM downstream power on every line to overcome the attenuation at 800 m.Correct Answer: BExplanationThe stated problem is that the bonded and binder-grouped lines are cross-talk limited, and VDSL2 vectoring cancels the crosstalk among lines in the same binder, which is the most cost-effective route to the 100 Mbit/s target without touching the copper. Raising power on every line increases crosstalk and is capped by regulated power spectral density limits. A larger cabinet does not change line performance. G.fast needs much shorter loops than 800 m and would require extensive fibre deep, so jumping to it without analysis is the wrong first step.
-
10 Question 10 Order list Network Management Systems
A service provider wants to deploy a new iManager U2000 instance to monitor an OTN network of 30 nodes. The deployment must give the NOC fault visibility before the performance collection and alarm policy are tuned. Place the following steps in the correct order. A. 2, 4, 1, 3 B. 2, 1, 4, 3 C. 1, 2, 4, 3 D. 2, 4, 3, 1 Drag the steps into the correct order.
Drag the steps into the correct order, or use the arrows.
- Configure the alarm forwarding and performance collection policies.
- Import the node list and confirm each device is in a managed state.
- Install the U2000 server and configure the database and network interfaces.
- Add the required users and assign role-based permissions.
Correct Answer:- Install the U2000 server and configure the database and network interfaces.
- Add the required users and assign role-based permissions.
- Import the node list and confirm each device is in a managed state.
- Configure the alarm forwarding and performance collection policies.
ExplanationThe server and database must exist before any other work, so installation comes first. Users and role permissions are created next so that the nodes can be onboarded under named accounts, which the audit rule requires. Importing the node list and confirming managed state follows, because devices cannot be correctly managed without an account under which they are added. Alarm forwarding and performance policies come last, once monitoring targets are stable, which lets the NOC see faults before tuning. Configuring policies before onboarding nodes would have nothing to act on.
-
11 Question 11 Multiple choice Service Planning and Design
A carrier is designing a PTN-based backhaul for 8 mobile base stations that require synchronisation at 1588 frequency accuracy and a committed bandwidth of 1 Gbit/s per site. The budget excludes new fibre, and the operator wants the design to reduce the risk of a single failure taking several sites offline. Which two design choices best meet these requirements? (Choose two.)
A. Deploy a dual-homed ring topology with tunnel protection, so each site has two independent paths to the aggregation node.
B. Use a single PTN core node with all base stations homed to it, to simplify timing distribution.
C. Provision a traffic engineering tunnel with bandwidth reserved for each base station's committed rate and enable QoS scheduling for the synchronisation class.
D. Rely on best-effort IP forwarding through an existing enterprise network to carry the backhaul at no additional cost.
E. Deploy GPS receivers at each base station instead of a network timing reference, to meet the accuracy target.Correct Answer: C, DExplanationA dual-homed ring with tunnel protection gives each site two independent paths, which limits the blast radius of a single failure without new fibre, since it reuses the ring topology. Reserving tunnel bandwidth for each committed rate and applying QoS scheduling to the synchronisation class keeps the backhaul within 1 Gbit/s per site while protecting timing packets from congestion. A single core node creates exactly the single point of failure the operator wants to avoid. Best-effort forwarding cannot guarantee the committed rate or timing accuracy. GPS at every site adds cost and dependency and is not the network-based synchronisation the stated design calls for.
-
12 Question 12 Single choice Optical Network Fundamentals
An engineer is matching optical impairments to the design measures that address them in a 10G DWDM metro deployment. Match each item to the best measure.
1. Chromatic dispersion accumulation over the link
2. Attenuation and insertion loss at each passive node
3. Four-wave mixing between closely spaced channels
A. 1 - Dispersion compensation; 2 - Optical amplifier; 3 - Non-zero dispersion fibre
B. 1 - Optical amplifier; 2 - Dispersion compensation; 3 - Optical amplifier
C. 1 - Non-zero dispersion fibre; 2 - Dispersion compensation; 3 - Optical amplifier
D. 1 - Dispersion compensation; 2 - Non-zero dispersion fibre; 3 - Optical amplifierCorrect Answer: BExplanationAccumulated chromatic dispersion is handled by dispersion compensation sized to the link, and insertion loss at passive nodes is recovered with an optical amplifier. Four-wave mixing is mitigated by non-zero dispersion fibre, which keeps the zero-dispersion point away from the channel plan. Amplifiers do not remove dispersion or prevent four-wave mixing, which makes the options that place amplifiers at the dispersion and mixing items wrong. Non-zero dispersion fibre does not compensate for loss, so placing it against the loss item fails.
-
13 Question 13 Single choice Access Network Solutions
A PON operator is commissioning a GPON network that serves an industrial park. One of the splitter outputs supplies four ONTs at 2.5 km from the OLT, and the operator has measured one ONT as failing to register after a fibre patch was replaced. The engineer confirms the optical power at that ONT is within specification and the OLT shows the ONT as offline. The OLT is configured with serial-number-based authorisation and the ONT was pre-provisioned with a different serial in the service profile. Which action should the engineer take to restore the service with the least disruption?
A. Replace the ONT with a spare, because the optical power measurement proves the device is faulty.
B. Reduce the OLT transmit power on that PON port so the ONT can register at a lower receive level.
C. Correct the ONT serial number binding in the OLT configuration to match the physical device, then re-register the ONT.
D. Move the ONT to a different PON port on the OLT, because the port binding is preventing registration.Correct Answer: AExplanationWith optical power confirmed within specification, the failure is an authorisation mismatch, since the OLT only accepts an ONT whose serial matches the pre-provisioned entry. Correcting the serial binding restores registration with no hardware change. Replacing the ONT treats a non-fault as a hardware fault. Lowering transmit power has no bearing on registration because the power is already within budget. Moving the ONT to another port leaves the mismatched serial in place, so the ONT still fails to register.
-
14 Question 14 Single choice Transport Network Technologies
A carrier is migrating a legacy SDH network to an OTN-based core and must keep an existing STM-16 service running at all times. The migration plan proposes mapping the SDH STM-16 traffic into ODU1 containers on the OTN side and handling client-side alarms through the new platform. The engineer must choose the cutover method that avoids interruption and keeps the existing protection behaviour intact for the duration of the migration. Which method should be recommended?
A. Cut over the full STM-16 service in a single maintenance window, then add the protection afterwards.
B. Provision the ODU1 path in parallel, verify alarms and performance on the new platform, then switch the traffic with a hitless path move.
C. Remove the SDH protection before the migration to simplify the new configuration.
D. Connect the STM-16 service to the OTN platform using an unprotected client port and run both networks without verification.Correct Answer: CExplanationProvisioning the ODU1 path in parallel and verifying alarms and performance before moving traffic lets the operator confirm the new platform while the old service keeps running, and the hitless path move then avoids interruption. A single cutover without protection in place risks an outage that the requirement forbids. Removing SDH protection before the move drops the protection behaviour the requirement asks to keep. An unprotected client port with no verification fails both the protection requirement and any safe migration practice.
These are 14 of the 107 questions in the full H19-315 pack.
Get All 107 QuestionsGet all 107 questions & answers
Full access options for Huawei H19-315
Self-study
PDF Version
- 107 actual exam questions
- Compatible with all devices
- Printable PDF format
- No download limits
- 90 days free updates
- 24/7 customer support
Best value
Bundle Pack
- Discounted PDF + online access
- 107 actual exam questions
- Both PDF and online practice test
- Free 90 days updates
- No download or practice limits
- 24/7 customer support
Exam simulation
Online Practice Test
- 107 actual exam questions
- Actual exam environment
- 90 days free updates
- Browser-based software
- 24/7 customer support
100% Money Back Guarantee
Your success comes first
At DumpsProvider, we give you a 100% money back guarantee on all of our exam dumps. For us, your success is the #1 priority and we are more than confident that our exam material will help you pass the H19-315 Exam (HCSA-Presales-Transmission & Access) on your very first attempt.
In a rare case, if you fail your exam, we will refund your amount without asking a single question.