1 Question 1 Single choice Pricing and Licensing
A university is buying a Huawei campus network for six buildings. The procurement office has a fixed annual budget, and the IT director states that the switches will be upgraded to more ports within three years when new labs open. Enrolment is expected to fluctuate by up to 15 percent each year, and the finance team wants to avoid paying for unused capacity while still being able to add access ports without a new contract. The vendor proposal includes a perpetual licence bundle with a fixed port count, a subscription model billed per active port per year, and a capacity expansion licence pool that is drawn down as ports are activated. Which licensing approach best meets the university's requirements?
Correct Answer: CExplanationA pooled capacity expansion licence sized to the forecast peak lets the university activate ports as enrolment moves, so it pays for capacity as it is consumed without a new contract for each expansion, matching the stated need to add ports freely. A perpetual licence for the maximum build locks in cost for capacity that may sit unused for years, and buying perpetual licences per lab introduces delays and new procurement cycles. A per-active-port subscription does track usage, but it makes the university pay a recurring fee on every active port indefinitely, which the finance team did not ask for and which the budget constraint makes less predictable than a pooled, pre-sized entitlement.
-
2 Question 2 Order list Proof of Concept (PoC) Planning
A hospital group wants to validate a Huawei wireless and access network for its three campuses before signing a contract. Clinical staff roam between wards, and the hospital's security office requires that no patient-related production traffic enter the test environment. The PoC must be completed in six weeks, and the vendor must prove that roaming handover meets the agreed limit under load. Arrange the steps in the order they must be performed.
Drag the steps into the correct order, or use the arrows.
- Agree measurable success criteria, including the roaming handover target and the load profile
- Present the measured results against the success criteria and agree the go or no-go decision with the customer
- Obtain written sign-off from the security office on the isolated test scope and data handling rules
- Build the test topology in an isolated lab using synthetic clients and representative ward traffic
- Run the roaming and load test cases and record handover measurements against the agreed criteria
Correct Answer:- Obtain written sign-off from the security office on the isolated test scope and data handling rules
- Agree measurable success criteria, including the roaming handover target and the load profile
- Build the test topology in an isolated lab using synthetic clients and representative ward traffic
- Run the roaming and load test cases and record handover measurements against the agreed criteria
- Present the measured results against the success criteria and agree the go or no-go decision with the customer
ExplanationThe security sign-off must come before any lab build, because the isolated scope and data rules define what can be deployed and tested. Success criteria must be fixed before testing so that the roaming result can be judged against an agreed target rather than against results chosen after the fact. Only then is the topology built with synthetic traffic, after which the test cases run and the measurements are compared with the criteria. Presenting results and agreeing the decision closes the PoC. Building the lab first would risk testing against a scope the security office has not approved.
-
3 Question 3 Drag and drop Competitive Analysis
A manufacturer is comparing Huawei and a rival vendor for a factory network that must keep machine control traffic deterministic and must remain operable by an in-house team with limited vendor-specific training. The sales engineer needs to position each differentiator against the customer's stated concern. Match each requirement to the capability that addresses it.
Drag each item onto its matching target. On a phone: tap an item, then tap a target.
Unified policy for wired and wireless users moving between production cellsGuaranteed low-jitter delivery for machine control traffic on the factory floorReduced operational burden for an in-house team with limited trainingThird-party controller integration for legacy device supportDeterministic QoS scheduling for industrial traffic classesSingle campus management platform applying one policy across access typesLowest up-front hardware price per port across all switch tiersIntent-based automation with a simplified operations workflowCorrect Answer:- Guaranteed low-jitter delivery for machine control traffic on the factory floor → Deterministic QoS scheduling for industrial traffic classes
- Unified policy for wired and wireless users moving between production cells → Single campus management platform applying one policy across access types
- Reduced operational burden for an in-house team with limited training → Intent-based automation with a simplified operations workflow
ExplanationDeterministic QoS scheduling addresses jitter-sensitive machine control, while a single campus management platform gives one policy model for wired and wireless users, which is the differentiator the customer needs for roaming production staff. Intent-based automation reduces the day-to-day workload that a small team with limited training would otherwise carry. The hardware price target matches no stated concern, since the customer prioritised determinism and operability over capex. Third-party controller integration is the feature the rival pitched for lower capex, and it does not answer the determinism or operability requirement.
-
4 Question 4 Dropdown Technical Presentations and Demonstrations
A presales engineer must demonstrate a Huawei enterprise switch configuration to a network operations lead who will later audit the change. The demonstration must show that a newly created VLAN is added to a trunk link toward an access switch, and the presenter must avoid allowing all VLANs across the trunk, which the customer's security policy prohibits. Complete the configuration by selecting the correct value for each blank.
Choose the correct value for each blank.
interface GigabitEthernet0/0/1
port link-type trunk
port trunk allow-pass vlan 100Correct Answer:system-view interface GigabitEthernet0/0/1
port link-type trunk port link-type trunk
100 port trunk allow-pass vlan 100ExplanationEntering system-view is required before any interface configuration, and the trunk link type must be set before VLANs are permitted on it. Allowing only VLAN 100 with port trunk allow-pass vlan satisfies the policy against carrying all VLANs, which is why the range and all options fail. Display interface only shows status and cannot change configuration, and quit leaves the view without applying anything. Choosing port link-type access would make the port carry a single VLAN and would not produce a trunk, so the demonstration would show the wrong topology to the auditor.
-
5 Question 5 Single choice Customer Requirement Analysis
A regional logistics company plans to replace its aging branch WAN, which connects 45 sites with MPLS circuits. Its CIO wants to cut WAN cost by at least 30 percent, but the operations director insists that the warehouse sites keep sub-20 ms latency to the central ERP and that no site loses connectivity during a single carrier outage. Only 12 of the 45 sites have a second broadband line available today. The presales consultant must decide what to gather first before proposing a SD-WAN design. Which action should the consultant take FIRST?
Correct Answer: BExplanationThe latency target, the single-carrier resilience requirement and the limited availability of second links are all constraints that must be quantified before any topology is chosen. Measuring per-site application traffic and confirming which sites can take a second access line gives the evidence needed to size the overlay and decide where a backup path is feasible. Proposing a full mesh ignores the fact that only 12 sites have a second line and that mesh design adds cost. A 5G-only backup link does not satisfy the requirement that every site survive a carrier outage with latency intact. Drafting pricing before the requirements are validated locks in assumptions the consultant has not yet checked.
-
6 Question 6 Multiple choice Competitive Analysis
A bank is evaluating a Huawei campus network against a competitor's offering. The competitor's proposal claims lower capex because it uses third-party controllers and a per-port licence model. The bank's security team requires centralised policy enforcement across wired and wireless users, automated threat response, and a single operations platform with no multi-vendor integration risk. The presales engineer must position Huawei's answer credibly. Which TWO points should the engineer emphasise? (Choose two.)
Correct Answer: B, EExplanationA credible positioning compares total cost of ownership, showing that multi-vendor controllers add integration and operations effort that undermines the apparent capex saving, and it presents a unified platform that applies consistent policy across wired and wireless access. Claiming that campus networks cannot be centrally managed is factually wrong and undermines the vendor's credibility. Offering free lifetime licences is an unsupported commercial promise that the stem does not justify. Promising to adapt to every third-party product contradicts the bank's stated desire to avoid multi-vendor integration risk.
-
7 Question 7 Order list Proof of Concept (PoC) Planning
A government agency wants to validate a Huawei private cloud platform before committing to a three-year contract. The agency's security office requires that no production data leave the test environment, the proof must show the agreed availability and performance targets under simulated failure, and the steering committee must sign off on success criteria before any hardware is racked. Arrange the steps in the correct order.
Drag the steps into the correct order, or use the arrows.
- Build the test environment with anonymised or synthetic datasets only
- Present results against the success criteria and agree the go or no-go decision
- Obtain steering committee sign-off on measurable success criteria and test scenarios
- Run the agreed failure-injection and performance test cases and record results
- Deploy the trial hardware and confirm the environment matches the design
Correct Answer:- Obtain steering committee sign-off on measurable success criteria and test scenarios
- Build the test environment with anonymised or synthetic datasets only
- Run the agreed failure-injection and performance test cases and record results
- Deploy the trial hardware and confirm the environment matches the design
- Present results against the success criteria and agree the go or no-go decision
ExplanationThe success criteria must be signed off before anything else, because they define what the PoC is measuring and prevent goalpost shifting after results arrive. Only once criteria are agreed does it make sense to deploy the trial hardware and confirm it matches the design. Building the environment with synthetic data satisfies the rule against exporting production data. Test execution then follows, and the final step is presenting results against the agreed criteria to reach a decision.
-
8 Question 8 Drag and drop Huawei Enterprise Product Portfolio
A manufacturing group is assembling a proposal covering its plant network, its hybrid cloud and its unified communications needs. The solution architect must match each requirement to the Huawei product family that best addresses it. Match each requirement to the service that meets it.
Drag each item onto its matching target. On a phone: tap an item, then tap a target.
On-premises elastic compute and storage for MES workloads with pay-as-you-grow scalingDeterministic low-latency switching between plant floor controllers and the cloud gatewayVoice, video and instant messaging for engineers across five sitesHybrid cloud infrastructureMobile handset device managementIndustrial and campus switching portfolioUnified collaboration platformConsumer smartphone bundleCorrect Answer:- Deterministic low-latency switching between plant floor controllers and the cloud gateway → Industrial and campus switching portfolio
- On-premises elastic compute and storage for MES workloads with pay-as-you-grow scaling → Hybrid cloud infrastructure
- Voice, video and instant messaging for engineers across five sites → Unified collaboration platform
ExplanationIndustrial switching portfolio products are the appropriate layer for deterministic, low-latency plant connectivity. Hybrid cloud infrastructure provides the elastic on-premises compute and storage that a manufacturing execution system needs while remaining manageable alongside public cloud resources. The unified collaboration platform covers voice, video and messaging across sites. The consumer smartphone bundle is a retail device product outside enterprise plant networking, and handset device management addresses endpoint fleets rather than the stated workloads, so neither fits any requirement.
-
9 Question 9 Dropdown Pricing and Licensing
A healthcare provider is preparing a quote for a Huawei campus deployment across three hospitals. The finance director wants licences to scale with the number of access points actually activated, not with the physical hardware purchased, and wants to see the controller licence in the quote. Complete the quotation note by selecting the correct value for each blank.
Choose the correct value for each blank.
Wireless controller and AP licences are sold as licences, so the quote must include an AP licence count matching the APs planned for activation, and the controller licence is attached to the of the solution.Correct Answer:Wireless controller and AP licences are sold as per-AP capacity licences, so the quote must include an AP licence count matching the activated APs planned for activation, and the controller licence is attached to the central controller of the solution.
ExplanationWireless licensing is driven by the number of access points that are activated on the controller, so quoting per-AP capacity licences lets the finance director pay only for APs in use. The licence count must therefore match activated APs rather than installed hardware, which can exceed what is switched on. The controller licence is attached to the central controller that manages the network, not to individual sites or access switches. The per-port and per-user options describe licensing models that do not apply to this wireless scenario.
-
10 Question 10 Single choice HCSA-Presales-Service Fundamentals
A retail chain is moving from a break-fix IT support contract to a managed service model covering its 200 stores. The chain's operations head wants guaranteed response times that differ by store criticality, and the chain's procurement team requires that service-level penalties be measurable from the monitoring platform. The presales consultant must structure the proposal so the SLA is enforceable. Which approach best meets these requirements?
Correct Answer: AExplanationA measurable, enforceable SLA needs targets that vary with business criticality and penalties that can be verified from objective data, which is exactly what tiered targets tied to monitoring metrics provide. A blanket 99.99 percent promise with complaint-driven refunds is not measurable and cannot be verified. Best-effort investigation carries no commitment that could be enforced. A uniform four-hour response ignores the requirement that response varies by store criticality.
-
11 Question 11 Single choice Solution Design and Proposal Development
A logistics firm asks for a Huawei data centre network proposal. Its workloads include an Oracle database cluster that needs lossless, low-latency east-west traffic, and a file-serving tier with bursty traffic. The firm's budget excludes replacing its existing 10 GE access layer this year, and its auditors require that the design remain compliant with a zero-trust segmentation policy between tenants. The architect must choose the most appropriate design direction for the proposal. Which direction is BEST?
Correct Answer: BExplanationA spine-leaf fabric delivers predictable east-west latency for the database cluster, lossless transport can be configured for the RDMA-style traffic it carries, and policy-based segmentation addresses the zero-trust requirement between tenants. Keeping the existing access layer respects the budget constraint. VLAN-only isolation does not meet zero-trust segmentation expectations. Replacing everything with 100 GE breaks the budget and keeping a flat Layer 2 domain fails the segmentation requirement. A large Layer 2 domain with segmentation deferred violates the auditors' compliance condition.
-
12 Question 12 Multiple choice Technical Presentations and Demonstrations
A presales engineer is preparing a live demonstration of a Huawei network management platform for a utility company's CTO and network operations lead. The CTO has said that the audience will judge the product by whether it reduces mean time to repair and whether it can be trusted in a regulated environment. The demo environment is shared with other sales engineers and cannot hold real customer data. Which TWO demonstration practices are MOST appropriate? (Choose two.)
Correct Answer: C, DExplanationDemonstrating an end-to-end fault workflow tied to measurable repair-time improvement speaks directly to what the CTO will judge, and using a rehearsed synthetic scenario respects the shared environment's restriction on real data. Connecting to the live production network exposes the utility to risk and conflicts with the constraints of the demo environment. Long feature walkthroughs dilute the message the audience cares about. Skipping compliance discussion ignores the regulated environment the CTO raised explicitly.
These are 12 of the 60 questions in the full H19-316 pack.
Get All 60 QuestionsGet all 60 questions & answers
Full access options for Huawei H19-316
Self-study
PDF Version
- 60 actual exam questions
- Compatible with all devices
- Printable PDF format
- No download limits
- 90 days free updates
- 24/7 customer support
Best value
Bundle Pack
- Discounted PDF + online access
- 60 actual exam questions
- Both PDF and online practice test
- Free 90 days updates
- No download or practice limits
- 24/7 customer support
Exam simulation
Online Practice Test
- 60 actual exam questions
- Actual exam environment
- 90 days free updates
- Browser-based software
- 24/7 customer support
100% Money Back Guarantee
Your success comes first
At DumpsProvider, we give you a 100% money back guarantee on all of our exam dumps. For us, your success is the #1 priority and we are more than confident that our exam material will help you pass the H19-316 Exam (Huawei Certified Pre-sales Associate- ECC-ENU) on your very first attempt.
In a rare case, if you fail your exam, we will refund your amount without asking a single question.