1 Question 1 Single choice Data Center Facility Overview
A regional bank is building a new Tier III-equivalent data center to host its core banking workloads. The customer requires concurrent maintainability so that any power or cooling path can be taken offline for planned maintenance without shutting down IT loads. The site has a limited budget and the customer rejects any design that doubles the entire power infrastructure at every level. The sales consultant must recommend a power architecture for the UPS and distribution layer. Which recommendation best meets the availability target while respecting the budget constraint?
Correct Answer: BExplanationDistributed redundancy provides concurrent maintainability by letting one path be serviced while the other carries the load, and it avoids the full duplication cost of 2N. A 2N design is correct for availability but breaks the customer's explicit rejection of full doubling. An N+1 design with a single shared path does not allow maintenance of that path without load transfer risk, and a single UPS with a generator provides no redundancy at the UPS layer at all.
-
2 Question 2 Single choice Power and Cooling Planning
A telecom operator plans to deploy a high-density AI training cluster in an existing data hall. Each rack will draw about 35 kW, while the hall was designed for 6 kW per rack with air cooling. The operator wants to avoid a full building refit within 90 days and must keep the existing chilled-water loop unchanged. The sales engineer proposes a cooling solution for the hot aisle of the high-density racks. Which proposal is the most appropriate for this constraint?
Correct Answer: BExplanationRear-door heat exchangers remove heat at the rack, handle high density, and reuse the existing chilled-water loop, so they fit the 90-day and no-loop-change constraints. Extra floor tiles and ceiling fans cannot move enough air to cool 35 kW racks, and replacing the chiller violates the stated refit limit and the requirement to keep the loop unchanged.
-
3 Question 3 Single choice Environmental Monitoring and Operations
A government client operates a data center where the facility manager reports intermittent overheating alarms in one cold aisle, but the existing monitoring only tracks average room temperature. The client requires root-cause evidence within a week and has a policy that no new sensors may be mounted inside active server cabinets without a change approval that takes three weeks. The sales team is asked to propose the most effective monitoring enhancement. Which action should be recommended first?
Correct Answer: DExplanationSensors at the cold-aisle inlet, mounted on existing containment panels, measure the supply conditions that actually cause the alarms without touching active cabinets, so they fit the one-week deadline and the change policy. Mounting inside cabinets requires a three-week approval, lowering the setpoint masks the cause, and replacing the BMS delays evidence collection far beyond the timeline.
-
4 Question 4 Single choice Physical Security and Access Control
A financial services firm is designing access control for a colocation-style data hall that hosts several tenants. Auditors require that every entry into the caged area be logged with the identity of the individual and that no single staff member can both approve and execute an access request. The site already has a card reader system at the building entrance. Budget allows one additional control layer only at the cage door. The sales consultant must recommend the control that best satisfies both requirements. Which option should be proposed?
Correct Answer: BExplanationCombining a badge and biometric reader at the cage door gives individual identity for each entry, and a two-person approval workflow enforces segregation of duties as the auditors require. A shared keypad code breaks individual identification, a key cabinet does not attribute entry to a person reliably, and a camera without a reader does not restrict access or enforce approval.
-
5 Question 5 Multiple choice Fire Protection and Safety
A healthcare provider is commissioning a data center room that houses critical imaging servers. The room has a suspended ceiling and a raised floor. The provider requires fire suppression that will not damage electronics, must not require the room to be evacuated for every small event, and must comply with its insurer's requirement for early detection. The budget is limited and the sales engineer must select the components to propose. (Choose two.)
Correct Answer: B, CExplanationVery early smoke detection sampling the floor and return air meets the insurer's early-detection requirement, and a clean agent system with pre-action detection and discharge delay protects electronics without water damage and allows evacuation time. Wet pipe sprinklers would damage servers, corridor heat detectors do not detect in the room, and CO2 without pre-discharge alarm is unsafe for occupants and is not acceptable under the stated requirements.
-
6 Question 6 Multiple choice Network Infrastructure Cabling
A logistics company is refreshing the structured cabling for a new data center hall that will host 400G spine switches and high-density top-of-rack switches. The design target is a 20-year cable plant lifetime with support for future speed upgrades, and the cabling contractor has proposed low-cost cable types to reduce capital cost. The sales engineer must advise on the media choices that meet the forward-compatibility requirement. (Choose two.)
Correct Answer: A, BExplanationSingle-mode fibre with MPO trunks and a defined polarity scheme supports parallel optics and speed migration for spine-to-leaf links over the 20-year life. Category 5e cannot carry server links at high speeds reliably, OM1 is obsolete for 400G reach, and reusing 10G twinax on new 400G links does not meet the forward-compatibility target.
-
7 Question 7 Single choice Data Center Power Efficiency
A cloud service provider is marketing its new facility to enterprise customers and must present an energy efficiency metric. The customer's procurement team asks for a figure that shows how efficiently the facility delivers power to IT equipment across a full year, rather than a single snapshot. The provider has metered total facility energy and IT equipment energy at the utility feed and at the UPS output. The sales team must select the correct metric to present. Which metric should be proposed?
Correct Answer: BExplanationAnnualised PUE, total facility energy divided by IT equipment energy over a full year, is the standard metric for whole-year efficiency and matches the metered data the provider already has. Peak IT power describes capacity, not efficiency, cooling tonnage describes plant size, and battery runtime describes resilience rather than energy efficiency.
-
8 Question 8 Drag and drop Data Center Facility Operations
A manufacturing company is reviewing its data center operations contract and must map each operational requirement to the most suitable facility service or practice to propose. The requirements include detecting impending UPS battery failure before an outage, verifying that the standby generator will carry the load during a utility loss, and documenting the facility's capacity and power headroom for planning. Match each requirement to the service or practice that meets it.
Drag each item onto its matching target. On a phone: tap an item, then tap a target.
Document available power and cooling headroom for planningDetect impending UPS battery failure before an outage occursVerify the standby generator will carry the critical load during a utility lossScheduled battery impedance and capacity testingAnnual repainting of the generator enclosurePeriodic full-load generator test with automatic transferQuarterly visual inspection of cabinet door sealsCapacity management report from DCIM power and cooling dataCorrect Answer:- Detect impending UPS battery failure before an outage occurs → Scheduled battery impedance and capacity testing
- Verify the standby generator will carry the critical load during a utility loss → Periodic full-load generator test with automatic transfer
- Document available power and cooling headroom for planning → Capacity management report from DCIM power and cooling data
ExplanationImpedance and capacity testing reveals battery degradation early, while a full-load generator test with automatic transfer proves the standby source actually carries the load. A DCIM-based capacity report captures headroom for planning. Cabinet seal inspections and enclosure repainting do not address the three stated requirements.
-
9 Question 9 Drag and drop Hardware Lifecycle and Sustainability
A retail chain is decommissioning an older data center and must recommend how each category of retired equipment should be handled to meet its sustainability and data protection policies. The categories include server drives that held customer payment records, legacy UPS lead-acid batteries, and obsolete network switches that are still functional. Match each category to the disposal approach to propose.
Drag each item onto its matching target. On a phone: tap an item, then tap a target.
Functional but obsolete network switchesServer drives holding customer payment recordsLegacy UPS lead-acid batteriesLicensed hazardous waste recycling with a take-back agreementCertified data sanitisation or physical destruction with a destruction certificateStorage on site indefinitely pending a future projectCertified resale or donation after configuration wipeLandfill disposal in general waste binsCorrect Answer:- Server drives holding customer payment records → Certified data sanitisation or physical destruction with a destruction certificate
- Legacy UPS lead-acid batteries → Licensed hazardous waste recycling with a take-back agreement
- Functional but obsolete network switches → Certified resale or donation after configuration wipe
ExplanationDrives with payment data require certified sanitisation or destruction to satisfy data protection obligations, and lead-acid batteries are hazardous and need licensed recycling. Functional switches can be resold or donated after a configuration wipe to extend their life. Landfill and indefinite storage fail the sustainability and data protection requirements.
-
10 Question 10 Order list Facility Planning and Deployment
A utility company is opening a new data hall and must deliver it on a fixed schedule before a regulatory reporting deadline. The sales project lead must sequence the key facility activities so that the hall is safely energised and accepted. Arrange the steps in the correct order.
Drag the steps into the correct order, or use the arrows.
- Perform the level 5 commissioning of the environmental controls and monitoring
- Install the cooling units and confirm the chilled-water loop pressure test
- Complete the integrated systems test with the UPS and generator under load
- Hand over the hall with the operations and maintenance documentation
- Commission the power distribution and verify earthing and bonding
Correct Answer:- Complete the integrated systems test with the UPS and generator under load
- Commission the power distribution and verify earthing and bonding
- Install the cooling units and confirm the chilled-water loop pressure test
- Perform the level 5 commissioning of the environmental controls and monitoring
- Hand over the hall with the operations and maintenance documentation
ExplanationPower distribution must be commissioned and earthed before the cooling and environmental systems are tested, since those rely on powered equipment. The integrated systems test under load can only follow once all subsystems are in place, and the environmental level 5 commissioning confirms the controls under operating conditions before handover. Handover comes last, once the documentation reflects the tested state.
-
11 Question 11 Order list Facility Change and Incident Response
A hosting provider experiences a sudden rise in cold-aisle temperature in one row during a hot afternoon. The facility team must respond to protect the IT load while preserving evidence for the root-cause review. Arrange the steps in the order they must be performed.
Drag the steps into the correct order, or use the arrows.
- Reduce the workload or migrate virtual machines away from the hottest racks
- Confirm the alarm against the inlet sensors on the affected row
- Restore normal setpoints and schedule a root-cause analysis
- Check cooling unit status and filter condition on the affected cooling path
- Record the temperature readings and actions taken in the incident log
Correct Answer:- Confirm the alarm against the inlet sensors on the affected row
- Reduce the workload or migrate virtual machines away from the hottest racks
- Check cooling unit status and filter condition on the affected cooling path
- Record the temperature readings and actions taken in the incident log
- Restore normal setpoints and schedule a root-cause analysis
ExplanationThe team must first confirm the alarm is real before acting, then reduce heat load to protect equipment, then inspect the cooling path to find the fault. Logging actions as they happen preserves evidence, and only after the situation is stable can setpoints be restored and a root-cause analysis scheduled.
-
12 Question 12 Dropdown Power Distribution and Monitoring
A data center operator must configure a power monitoring interface so that the facility team receives early warning when a PDU branch circuit approaches its safe load limit. The company policy is that alarms should trigger at 80 percent of rated capacity, and the monitoring must be applied to each branch circuit. Complete the configuration statement by selecting the correct value for each blank.
Choose the correct value for each blank.
set alarm-threshold percent-of-rated-capacity scope branch-circuit-levelCorrect Answer:set alarm-threshold 80 percent-of-rated-capacity scope per-pdu branch-circuit-level
ExplanationThe 80 percent value follows the stated policy, which sets the alarm before the circuit reaches its rated limit. Applying the threshold per PDU matches the requirement that monitoring cover each branch circuit within each power distribution unit. A 95 or 100 percent threshold alarms too late for safe operation, and a per-room or per-building scope would hide individual branch overloads.
-
13 Question 13 Dropdown Data Center Cooling Management
A colocation operator is adjusting the air handling settings for a hall with mixed-density racks to reduce energy use without creating hot spots. The sales engineer must document the recommended control strategy in the operator's change record. Complete the statement by selecting the correct value for each blank.
Choose the correct value for each blank.
Set the cooling control mode to using supply air sensors across the cold aisleCorrect Answer:Set the cooling control mode to demand-based using supply air inlet sensors across the cold aisle
ExplanationDemand-based control adjusts airflow to actual load, saving energy, and inlet sensors measure the conditions the IT equipment actually receives, which is the correct point to control for mixed-density racks. Fixed speed wastes energy at low load, manual-only control cannot respond to changing demand, and return or exhaust sensors reflect hot air rather than the supplied inlet condition.
-
14 Question 14 Single choice Data Center Standards and Compliance
A pharmaceutical company is building a validated data center and its quality team requires that facility design documents follow a recognised international standard for availability classification, so that the design can be audited against a published set of criteria. The company wants the classification to describe the redundancy and maintainability of the site's infrastructure. The sales consultant must advise which reference to cite in the proposal. Which should be recommended?
Correct Answer: BExplanationThe Uptime Institute Tier Standard for Topology is the recognised reference for classifying site infrastructure redundancy and maintainability, which matches the audit requirement. ISO 9001 governs quality management rather than facility availability, ISO 14001 covers environmental management, and ISO 27001 addresses information security management, so none classifies the infrastructure's availability.
-
15 Question 15 Multiple choice Facility Risk and Resilience
A stock exchange member firm is reviewing the resilience of its data center after a near-miss in which a single feeder failure caused a partial outage. The board requires that the facility can survive a utility feed loss and a single cooling path failure without service interruption, and it has asked the sales team to recommend the measures that address these two risks. The budget excludes building a second data center. (Choose two.)
Correct Answer: A, EExplanationA dual utility feed from separate substations addresses utility loss, and N+1 cooling on independent chilled-water circuits addresses a single cooling path failure without a second site. A second generator on the same fuel line shares a single point of failure, a larger battery bank on one distribution board does not remove that single point, and raising setpoints increases risk rather than reducing it.
These are 15 of the 60 questions in the full H19-105_V2.0 pack.
Get All 60 QuestionsGet all 60 questions & answers
Full access options for Huawei H19-105_V2.0
Self-study
PDF Version
- 60 actual exam questions
- Compatible with all devices
- Printable PDF format
- No download limits
- 90 days free updates
- 24/7 customer support
Best value
Bundle Pack
- Discounted PDF + online access
- 60 actual exam questions
- Both PDF and online practice test
- Free 90 days updates
- No download or practice limits
- 24/7 customer support
Exam simulation
Online Practice Test
- 60 actual exam questions
- Actual exam environment
- 90 days free updates
- Browser-based software
- 24/7 customer support
100% Money Back Guarantee
Your success comes first
At DumpsProvider, we give you a 100% money back guarantee on all of our exam dumps. For us, your success is the #1 priority and we are more than confident that our exam material will help you pass the H19-105_V2.0 Exam (HCSA-Sales-Data Center Facility) on your very first attempt.
In a rare case, if you fail your exam, we will refund your amount without asking a single question.