Exam Information
Free practice questions with explanations
AutoDesk ACP-01301 Practice Questions
Answer a question to see the correct answer and the explanation, or click Show answer. Newest questions first.
- Questions
- 18
- Answered
- 0
- Correct
- 0
- Score
- -
-
1 Question 1 Single choice Collaboration and coordination
A design team on a mid-rise office project has a central model that is workshared. The structural engineer has just linked the architectural model into their own central file and reports that when they select the linked architectural walls, they cannot change the workset visibility of the linked model's worksets. The architect needs the structural team to hide the linked architectural Furniture workset without changing the architect's own worksets or breaking the link. Which action should the structural team take?
Correct Answer: BExplanationWhen a linked Revit model is worksharing-enabled, its worksets can be controlled from the host file's Worksets dialog, where linked worksets are listed and can be set to Visible or Hidden at the view level via the Worksets tab for linked models. Setting them there keeps the architect's model untouched and the link intact. Visibility/Graphics Overrides control categories, not linked workset visibility at the workset level, so that option does not hide the workset. Unloading and reloading the link is disruptive and not needed for a view-level change. Deleting the architect's workset would destroy their work and cannot be done by another team.
-
2 Question 2 Single choice Documentation
A firm is preparing a set of floor plan views for a hospital project. The documentation lead needs the level 2 plan views to show walls with a light halftone while the ceiling-level bulkhead family instances stay at full color, and this must apply to every view created from one plan view template without editing each view. Some views must show a plan region that cuts through the ceiling only for the lab wing. Which approach best meets these requirements?
Correct Answer: BExplanationView templates store category-level graphics overrides such as halftone, along with view range settings, so one template applied to multiple plan views produces consistent output. Plan regions are configured per view and are the correct tool for a localized cut-plane change in the lab wing. Per-instance halftone is not a valid approach because halftone is a category-level graphic setting, not a per-element property. Filters on the bulkhead category would not raise halftone on walls, and duplicating views is not the template-driven workflow asked for. The keyed solution lets the template govern the consistent part while plan regions handle the one exception.
-
3 Question 3 Single choice Information analysis
A quantity surveyor needs a schedule of interior partitions for a school project. The partitions are in a linked architectural model and some were modeled in phase 'New Construction' while others are in 'Existing'. The schedule must include only partitions that are new in the current phase and must show a combined parameter that concatenates the wall type mark with the fire rating. The project uses a shared parameter named FireRating defined as text, and the QS insists the schedule remain accurate if the architect later changes phases. Which configuration best meets these needs?
Correct Answer: CExplanationRevit schedules can include elements from linked models, and the schedule properties let you filter on Phase Created so the schedule responds if the phasing changes. A combined parameter that concatenates Type Mark and FireRating is created as a calculated or combined schedule field, which keeps it dynamic. Exporting to spreadsheet breaks the live link and produces stale data. Converting the link to a copy severs the relationship with the source model, so updates no longer flow. A key schedule is used to drive a schedule's values from a keyed parameter, not to filter by phase, so it does not meet the stated requirement.
-
4 Question 4 Single choice Modeling
An architect is modeling a curtain wall facade for a retail building. The design calls for a curtain wall with mullions at 1500 mm, the glazing panels in the lower two bays replaced by a solid aluminum panel, and the panel swap must remain editable without breaking the wall's profile. The glazing panels are set by the curtain wall type and the panels must be replaced in an editable manner. Which action should the designer take to achieve this with the least loss of editability?
Correct Answer: CExplanationIn Revit, individual curtain panels can be changed to a different panel family type through the instance properties, which keeps the wall hosted and editable. Deleting panels and drawing a standalone wall breaks the curtain system and its parametric relationship. Changing the curtain wall type affects every instance of that type across the project, violating the requirement for a local change. Split Face and paint apply materials to a face of an element, but they do not replace a curtain panel with a panel family, so the panel would still behave as glazing in the schedule and structure.
-
5 Question 5 Single choice Project standards and setup
A firm uses a company template that has been updated with new object styles and view templates. A project was started from an older template and the project manager needs the newly defined standards to be applied to the active project without losing any model elements, schedules, or sheets already in the project. The project is in active use by six team members, each with worksharing open. Which approach is best?
Correct Answer: AExplanationTransfer Project Standards copies object styles, view templates, and other settings from a source file into the current project without touching model elements, schedules, or sheets, which is exactly what is needed. In a workshared project it should be run from a single synchronized session with others not editing, to avoid conflicts. Copying the whole project and re-linking breaks worksharing continuity and the team's central model. Saving over the project with a template file would replace project content rather than merge standards. View templates are not loadable as families, so that option is not a valid workflow.
-
6 Question 6 Single choice Collaboration and coordination
A model reviewer receives a coordination model with 400 warnings, many of which are duplicate walls and hosted elements that are not joined. The project manager needs to remove the duplicate elements without affecting any element whose instances are used in active sheets. The model is workshared and the reviewer has a local copy. Which action should be taken FIRST?
Correct Answer: BExplanationThe Review Warnings dialog lists every warning with its affected elements, which lets you judge impact before deleting anything. Duplicate elements may be referenced in sheets or still in use, so identifying them first prevents accidental loss. Audit and Compact is a maintenance step that should follow a review, not replace it. A selective purge removes unused types, not hosted duplicates, and running it blind risks removing needed items. Exploding DWGs is destructive and not a warnings-resolution step.
-
7 Question 7 Single choice Documentation
A structural consultant has a linked Revit model in a coordination file. The consultant wants a section view that shows only the structural framing, while the architectural model is linked with Auto - By Shared Coordinates and the linked model's views are hidden in the host. The consultant needs the section to show the framing in color, the linked model's architectural walls in halftone, and nothing else from the link. Which combination of settings should be applied to the section view?
Correct Answer: AExplanationLinked model categories can be controlled in the host view through Visibility/Graphics Overrides on the Revit Links tab, where you can hide categories and set halftone on individual link categories. Choosing to show only walls and set them to halftone delivers exactly the required display. Overlay is a link type that affects nesting, not category visibility, and a view filter cannot target linked element categories as needed. Hiding all categories then re-enabling walls is effectively the same method, but the keyed choice states the required combination directly, and it does not rely on wrong settings. The Custom display option refers to model element display settings for linked files, and disabling categories in the section does not control the link as needed.
-
8 Question 8 Single choice Modeling
A design team is modeling a three-level stair for an apartment building. The lower two flights must share a stair run and landing, and the upper flight must be a separate element connected to the upper floor so it can be edited independently. The team also needs to ensure the stair remains correctly hosted to the floors when levels change. Which modeling approach best satisfies these requirements?
Correct Answer: AExplanationRevit stairs can be defined as multi-story stairs with configured top and base levels, and a landing break separates the lower from the upper flight, giving independent editability while staying correctly hosted. Stair by Component is a sketching method and does not automatically create a single connected multi-story stair. Single runs without landings cannot satisfy the separate-flight requirement for an apartment building layout. A generic model family is not a stair element and will not provide native stair behavior such as riser calculations and level-based hosting.
-
9 Question 9 Single choice Project standards and setup
A project engineer is setting up a new commercial project in Revit. The project location is in a different time zone than the firm's template, and the team needs the building's true north orientation to match the site survey, but the drawings must still be oriented to project north for sheet alignment. The site survey gives a rotation of 22 degrees from project north to true north. Which action correctly configures the orientation?
Correct Answer: AExplanationProject North and True North are configured through Manage Project Location, and the angle entered for True North defines the offset from Project North. Entering 22 degrees there with Project North at zero aligns the model to the survey while keeping sheets referencing project north. Rotating the Survey Point or Project Base Point changes coordinates, not the project north reference, and those operations do not set True North in the Project Location dialog. Setting Project North directly to 22 degrees would misdefine the orientation relative to the true north reference.
-
10 Question 10 Single choice Information analysis
A facility manager wants an area plan for a hospital floor showing departmental zones and a color fill legend. Several rooms are unbounded because they were modeled with a missing wall at one corner, and the area scheme must reflect the enclosed room boundaries only. The area scheme is already created with the Gross Building area type. Which action should be taken to correct the area plan?
Correct Answer: AExplanationRoom boundaries are calculated from enclosing walls and room separators, so placing a Room Separator closes the gap and allows the area boundary to compute correctly. Regenerating the area plan then updates the color fill legend and area values. Changing the scheme type does not fix boundary geometry, and deleting the plan would discard the existing legend configuration. Manually placing area boundaries bypasses the enclosure logic the scheme depends on, and a Filled Region is a drafting element that does not affect the computed area.
-
11 Question 11 Single choice Documentation
A documentation manager needs a set of construction details for a residential project. Each detail callout must show its reference to a keynote in the text, and the keynote text must be consistent across all sheets. The keynote legend must be updated automatically when a keynote is edited in the library. The project already has a keynote file linked to the project. Which configuration meets these requirements?
Correct Answer: DExplanationKeynotes placed from a loaded keynote file are linked to the library, so editing the keynote text in the file updates all instances, and a keynote legend view reflects those values on every sheet. Manually typed numbers and text notes break that link and must be maintained by hand. A note block family is used for sheet-level notes and does not reference a keynote library, so it cannot automatically update. The keyed answer relies on the native keynote library behavior without requiring manual edits.
-
12 Question 12 Single choice Modeling
A project uses an opening in a masonry wall to accommodate a steel lintel that spans beyond the opening width. The architect wants the opening to be a true wall opening that updates if the wall moves and the lintel must not be cut into the wall. The opening must cut through all wall layers, including the cavity insulation. Which method correctly creates the opening?
Correct Answer: AExplanationThe Wall Opening tool creates a hosted cut that updates with the wall and cuts through all layers in the wall assembly, which satisfies the cavity insulation requirement. Hosting the lintel to the wall keeps the relationship intact. Void Forms cut only host elements that are cut by void geometry in the same family context and do not make a clean hosted opening. Cut Geometry on only the masonry layer leaves insulation uncut, and editing a wall family void does not create an opening in a host project wall.
-
13 Question 13 Single choice Project standards and setup
A project team is working in a central model with many local users. The project administrator wants to restrict the number of people who can change the project browser organization schemes for sheets, while keeping everyone able to create their own views. The team has agreed that browser organization changes should be made only by the project lead. Which approach best meets this goal?
Correct Answer: AExplanationBrowser organization is a project-level setting, and in a workshared project only the user who makes the change can edit it under the team's agreed process. Governing it through a designated lead, while others create views in their own local context, aligns with the requirement. Revit does not offer password locking of browser organization in Project Information. Removing file permissions on a central file breaks worksharing for everyone. Deleting schemes would remove standards and force inconsistency across the team.
-
14 Question 14 Multiple choice Collaboration and coordination
A coordination team is linking a surveyed point cloud and a DWG site plan into a Revit project. The team needs the link to remain accurate if the surveyor updates the point cloud, the DWG geometry must not become editable Revit elements, and the team wants to know the consequences of their choices before proceeding. (Choose two.)
Correct Answer: A, EExplanationLinking CAD files preserves the source relationship so updates can be reloaded, and it avoids the editable geometry issues that come with imports. Linked point clouds also remain as reference data and are reloaded when the source changes, without becoming Revit model elements. Importing CAD does not keep the source in sync, so it cannot meet the update requirement. Exploding DWG geometry converts it into Revit elements, which is exactly what the team wants to avoid. Insert Point Cloud embeds the scan rather than linking it, so updates from the surveyor would not flow automatically.
-
15 Question 15 Multiple choice Modeling
A design team is preparing a commercial building model where the roof assembly has a sloped insulation layer and a membrane applied over the top. The roof edge must form a parapet, and the team needs the roof to be editable at the edges without breaking the layer structure. The team is considering several approaches. Which TWO statements describe correct Revit behavior for this scenario? (Choose two.)
Correct Answer: B, CExplanationRoof types store layered construction, and slope can be defined through the type and sketch behaviour, so a sloped insulation layer belongs in the type definition. Edges are edited by modifying the roof sketch, while the layer structure stays intact because it is defined in the type. Wall sweeps and reveals apply to walls, not roofs, so they cannot create a parapet on a roof edge. Roof types can hold multiple layers with different materials, so modeling the membrane as a separate floor is unnecessary and incorrect. Slope arrows control slope on individual elements, but the sloped layer definition is handled in the type, so saying slope cannot be controlled through the type is wrong.
-
16 Question 16 Multiple choice Documentation
A documentation lead is setting up views for an office fit-out. The architects want a plan view in which the lighting category is shown only in one tenant area, the furniture category is hidden for the whole view, and the view must be consistent with the firm's graphic standard across twenty other plan views. Which THREE approaches correctly support these requirements? (Choose three.)
Correct Answer: B, C, DExplanationA view template that hides furniture can be applied across plan views, which keeps the graphics standard consistent. A view filter with a rule set on location can show lighting only within the tenant area as a view-level rule. Plan regions allow a cut-plane change scoped to a region and can be used to display specific content within an area. Element-level overrides on each lighting instance are time-consuming and do not scale or stay consistent with the standard. Temporary view modes are temporary and are not saved into the view template, so they cannot provide the permanent standard the team requires.
-
17 Question 17 Multiple choice Information analysis
A project manager is building an element schedule for an airport terminal project and needs to report door counts grouped by fire rating while excluding doors in an unused design option. The team also needs the schedule to reflect elements from a linked architectural file, including those that are in a specific phase. Which TWO of the following correctly describe how these requirements are met in a Revit schedule? (Choose two.)
Correct Answer: B, CExplanationRevit schedules can pull elements from linked models using the Linked Model setting in the schedule's properties, so linked architectural doors can be scheduled. Design option elements can be filtered in the schedule so that the unused option is excluded from the count. Schedules can reference linked models without binding the link, which is why the binding statement is wrong. Grouping by a parameter is a standard sorting and grouping function, so a key schedule is not required. Phase filtering is a property available on element schedules, so saying it is limited to sheet schedules is incorrect.
-
18 Question 18 Multiple choice Project standards and setup
A firm's BIM manager is configuring a new project template for a healthcare client. The template must set a default save reminder interval, control where the project's shared parameter file is stored so all users find it, and standardize the location of the Revit keyboard shortcut file across the office. Which TWO actions correctly accomplish these tasks? (Choose two.)
Correct Answer: B, CExplanationThe save reminder interval is a user-level setting controlled in the Options dialog, which is why the firm must configure it on each machine or through deployment. The shared parameter file location is set in the File Locations tab of the Options dialog, which points all users to a common network file. Shared parameters are not stored inside the project file, so that option is wrong. Keyboard shortcut file configuration is not a project file location tied to File Locations in the same way as shared parameters, and the Project Information dialog does not control save reminders.
These are 18 of the 145 questions in the full ACP-01301 pack.
Get All 145 QuestionsGet all 145 questions & answers
Full access options for AutoDesk ACP-01301
Self-study
PDF Version
- 145 actual exam questions
- Compatible with all devices
- Printable PDF format
- No download limits
- 90 days free updates
- 24/7 customer support
Best value
Bundle Pack
- Discounted PDF + online access
- 145 actual exam questions
- Both PDF and online practice test
- Free 90 days updates
- No download or practice limits
- 24/7 customer support
Exam simulation
Online Practice Test
- 145 actual exam questions
- Actual exam environment
- 90 days free updates
- Browser-based software
- 24/7 customer support
100% Money Back Guarantee
Your success comes first
At DumpsProvider, we give you a 100% money back guarantee on all of our exam dumps. For us, your success is the #1 priority and we are more than confident that our exam material will help you pass the ACP-01301 Exam (Autodesk Certified Professional - Revit for Architectural Design) on your very first attempt.
In a rare case, if you fail your exam, we will refund your amount without asking a single question.