1 Question 1 Single choice Logistics Overview and Strategy
A regional consumer electronics distributor is reviewing its logistics strategy. Its top two customers demand delivery within 24 hours, while a third group of wholesale accounts accepts 5-day delivery in exchange for a 12 percent lower price. Management wants to keep customer service levels high without raising total logistics cost by more than 3 percent. The company has limited warehouse capacity and cannot add a new distribution center this fiscal year. Which strategy BEST aligns logistics service with customer requirements under these constraints?
Correct Answer: BExplanationCustomer segmentation lets the distributor match service levels to what each group actually values, so the 24-hour accounts receive premium handling while wholesale accounts are served economically. A uniform service level either overspends on the wholesale group or underserves the key accounts. Choosing the cheapest mode everywhere ignores the 24-hour commitment, and cutting safety stock across the board without service analysis risks stockouts for the customers who need fast delivery most.
-
2 Question 2 Single choice Logistics Network Design
A manufacturer serving North America currently ships all finished goods from one plant in Ohio. Demand has grown rapidly in the western states, and average delivery lead time there has risen to 9 days. Leadership wants to cut western lead time to under 4 days while keeping total network fixed costs below a set ceiling. Market forecasts are uncertain, and the company prefers a reversible decision. Which network design option is MOST appropriate?
Correct Answer: AExplanationLeasing a public warehouse gives a quick, flexible footprint closer to western demand, and it can be exited if forecasts change, which fits the preference for reversibility and the cost ceiling. A new plant is a large, irreversible capital commitment under uncertain forecasts. Moving to rail usually lengthens transit times, which works against the 4-day target. Relying on expedited air freight would keep costs far above the ceiling for routine western volume.
-
3 Question 3 Single choice Sustainability and Reverse Logistics
A consumer goods company accepts product returns from retailers. Returned units are currently sent to a single liquidator at a recovery value of 8 percent of original cost. Analysis shows roughly 45 percent of returns are unopened or lightly used and could be resold after inspection and repackaging. The company wants to improve recovery value and reduce landfill diversion, and its returns center has space for a small inspection cell. Which reverse logistics action should be taken FIRST?
Correct Answer: DExplanationGrading returns at the point of receipt is the step that separates the resaleable 45 percent from damaged or defective goods, and it enables the recovery channel that raises value and diverts waste from landfill. Without grading, the other routing decisions cannot be made accurately. On-site destruction increases waste and loses recoverable value. Renegotiating the liquidator fee does not address the unused recovery potential, and tighter return windows reduce customer service without improving recovery.
-
4 Question 4 Single choice Capacity Planning and Demand Management
A seasonal lawn equipment distributor sees demand peak sharply in March through May. Its sales forecast for the peak quarter has a mean absolute percentage error of 28 percent. The warehouse operates at 95 percent of capacity during peak and frequently loses sales because of stockouts, while being under 60 percent utilized in the off-season. Management wants to smooth capacity usage without a large increase in fixed cost. Which action BEST addresses the capacity imbalance?
Correct Answer: AExplanationBuilding inventory during the slack off-season and drawing it down at peak uses existing capacity more evenly, which is the core of level-load capacity planning when demand is seasonal. A permanent expansion or full peak-sized staffing adds fixed cost that sits idle for most of the year. Raising prices to suppress orders conflicts with the goal of reducing lost sales, and does not address the capacity imbalance itself.
-
5 Question 5 Single choice Order Management
A business-to-business supplier uses a standard order cycle: order entry, credit check, allocation, picking, packing, shipping, and invoicing. Recently, a growing share of orders are being shipped with partial quantities because allocation runs before the credit check is complete. Customers on credit hold receive goods while the accounts receivable team later disputes payment. The company needs to stop shipments to credit-blocked customers without delaying orders from clean accounts. Where should the control be placed in the order cycle?
Correct Answer: AExplanationPlacing the credit hold before allocation prevents inventory from being committed and picked for orders that cannot legally ship, while clean accounts continue through the cycle unchanged. Checking credit after shipping lets goods leave against blocked accounts, which is the exact problem described. Monthly invoicing checks are far too late, and running the check during packing still allows picking and allocation of blocked orders, wasting effort and tying up stock.
-
6 Question 6 Single choice Inventory Management
A distributor of industrial fasteners holds safety stock for 1,200 SKUs using a single service-level target of 98 percent. Carrying cost is 22 percent of inventory value per year, and total inventory investment has grown to exceed the board's limit. Inventory turns on many slow-moving items are below 1.5. Demand variability and lead times differ widely across the SKU base. Which change would MOST effectively reduce inventory investment while protecting service on fast-moving items?
Correct Answer: BExplanationABC-style classification combined with variability analysis lets the distributor hold high service levels where demand is fast and critical, and accept lower service on slow, low-value items, reducing investment where it earns little return. A flat 90 percent target still under-serves key items and over-stocks others. Eliminating safety stock would collapse fast-moving service, and larger order quantities raise average inventory on slow items rather than lowering it.
-
7 Question 7 Single choice Warehouse Management
A third-party logistics provider operates a warehouse with a pick-to-light system for case picking of 3,000 active SKUs. Pick accuracy has dropped to 97.2 percent, and the operations manager suspects that the slotting plan is causing picker travel and mis-picks. Fast-moving SKUs are currently spread across all aisles, and several look-alike items sit in adjacent locations. The client requires 99.8 percent accuracy within 60 days with no new automation. Which action is the MOST appropriate first step?
Correct Answer: DExplanationSlotting based on velocity and separating look-alike items addresses both the travel burden and the root cause of mis-picks, and it needs no new capital, which matches the stated constraint. Replacing the system requires new hardware and time the 60-day window does not allow. More pickers increase error exposure rather than reducing it, and switching to full-pallet shipping would not suit the client's case-level requirement.
-
8 Question 8 Single choice Transportation
A food distributor must deliver temperature-sensitive products to 40 retail stores. The fleet dispatcher uses a manual routing spreadsheet, and drivers frequently arrive outside the stores' receiving windows. Management wants to reduce transportation cost per case and improve on-time window compliance. Constraints include a maximum driver duty time under hours-of-service rules, and reefer units that must stay within a defined temperature band. Which approach BEST meets all of these requirements?
Correct Answer: BExplanationA transportation management system that models time windows, driver hours, and equipment constraints can produce routes that satisfy receiving windows while staying within duty-time limits and temperature requirements. A single daily run ignores the windows, and dropping reefer equipment would breach the temperature rule for perishable goods. Letting drivers set their own times removes the coordination needed to hit receiving windows and offers no cost optimization.
-
9 Question 9 Single choice Global Logistics
A U.S. apparel company imports finished garments from a supplier in Vietnam and sells them in Canada and the European Union. It wants to manage duty cost on imports into both markets while maintaining a simple declaration process. Some styles qualify for preferential tariff treatment under free trade agreements, but the company has not yet collected origin documentation for them. Shipments arrive at several ports and customs clearance has been delayed. Which action should be taken FIRST to reduce duty cost on qualifying goods?
Correct Answer: AExplanationPreferential duty claims depend on documented origin, so the supplier's origin certifications must be collected and verified before entry can claim the lower rates. Declaring at the highest general rate overpays on qualifying goods, and splitting shipments to dodge duty is an improper scheme that invites penalties. A free trade zone defers or reduces certain duties in specific situations but does not waive duty on all imports.
-
10 Question 10 Multiple choice Transportation
A building materials supplier operates a private fleet of 18 trucks and is considering outsourcing part of its linehaul network to a carrier. Management wants to keep service reliability high on its five highest-volume lanes, and it wants the carrier contract to reward cost control without creating incentives to cut service quality. Which TWO contract and performance design choices BEST meet these requirements? (Choose two.)
Correct Answer: A, EExplanationLinking compensation to on-time performance and defining a lane-level scorecard with corrective thresholds aligns the carrier's incentives with service reliability while still rewarding efficient operations. A fixed rate with no service measures and a per-shipment bonus regardless of timeliness both reward volume over quality. Awarding to the lowest bidder and deferring measurement removes the oversight needed to protect the five critical lanes.
-
11 Question 11 Order list Inventory Management
A regional wholesaler has found that some SKUs are repeatedly stocking out because replenishment is triggered too late, while others accumulate excess stock. The inventory analyst must introduce a corrected reorder policy for the affected SKUs with demand variability data available. Arrange the steps in the correct order.
Drag the steps into the correct order, or use the arrows.
- Calculate safety stock and reorder point using the chosen service level and variability data
- Set the target service level for each SKU class based on its value and criticality
- Update the inventory system parameters and monitor stockouts and carrying cost for the next cycle
- Measure average demand and demand variability for each affected SKU over a recent review period
- Determine the lead time distribution from supplier performance records for each SKU's source
Correct Answer:- Measure average demand and demand variability for each affected SKU over a recent review period
- Determine the lead time distribution from supplier performance records for each SKU's source
- Calculate safety stock and reorder point using the chosen service level and variability data
- Set the target service level for each SKU class based on its value and criticality
- Update the inventory system parameters and monitor stockouts and carrying cost for the next cycle
ExplanationThe service level must be defined first because it drives the safety stock calculation. Demand and lead time data must be gathered before any reorder point can be computed, and the policy is only usable once the parameters are loaded into the system. Monitoring closes the loop so that the next review can adjust the parameters if stockouts or carrying cost drift.
-
12 Question 12 Drag and drop Logistics Network Design
A consumer products company is evaluating how to structure its distribution network after a merger that doubled its SKU count and added several regional brands. Management wants fast response to regional demand, low inventory duplication, and centralized control of purchasing. Match each requirement to the network element that best meets it.
Drag each item onto its matching target. On a phone: tap an item, then tap a target.
Fast replenishment to customers in dense regional marketsPooled safety stock for slow-moving SKUs across the networkSingle point of control for supplier purchasing and contract termsA centralized procurement function that negotiates and manages supplier agreementsDirect factory shipments to every retail store with no intermediate storageA central distribution center holding the consolidated low-velocity inventoryRegional cross-dock or distribution centers located near demand clustersSeparate independent warehouse operations for each brand with no shared inventoryCorrect Answer:- Fast replenishment to customers in dense regional markets → Regional cross-dock or distribution centers located near demand clusters
- Pooled safety stock for slow-moving SKUs across the network → A central distribution center holding the consolidated low-velocity inventory
- Single point of control for supplier purchasing and contract terms → A centralized procurement function that negotiates and manages supplier agreements
ExplanationRegional facilities close to demand clusters shorten replenishment times, while a central facility pools slow-moving stock and reduces duplicated safety inventory across regions. Centralized procurement gives the single point of control over supplier terms. Direct factory-to-store shipping removes the buffer needed for responsiveness, and separate brand warehouses duplicate inventory and fragment control, so neither supports the stated goals.
-
13 Question 13 Dropdown Transportation
A logistics analyst is configuring a carrier routing guide for a company that wants lowest-cost tendering on a lane while keeping a backup carrier for failed tenders. The guide is set up to tender to carriers in rank order and move to the next carrier only if the current one declines or fails to confirm. Complete the routing guide logic by selecting the correct value for each blank.
Choose the correct value for each blank.
Tender to the primary carrier at rate; if declined, tender to the next carrier in the order until a carrier accepts the load.Correct Answer:Tender to the primary carrier at contract rate; if declined, tender to the next carrier in the priority order until a carrier accepts the load.
ExplanationA routing guide applies contracted rates first and works through carriers in their defined priority sequence until one accepts the tender. Spot rates are a fallback for lanes without contract coverage rather than the primary tender. Alphabetical, random, or reverse ordering would break the cost-ranked intent the analyst built the guide to enforce.
-
14 Question 14 Single choice Sustainability and Reverse Logistics
A packaging company must reduce the carbon footprint of its outbound shipments to a national retailer. Its current shipments run at 62 percent cube utilization, and it has the option to switch from ground truckload to intermodal rail on the longest lanes. Rail adds two days of transit, and the retailer's replenishment program cannot accept delivery later than the scheduled window. The company also wants a measure it can report consistently. Which action BEST reduces emissions while meeting the constraints?
Correct Answer: CExplanationRaising cube utilization and consolidating loads cuts emissions per unit shipped without breaking the delivery window, and a consistent emissions-per-shipment method gives credible reporting. Shifting everything to rail breaches the window for lanes that cannot absorb two extra days. Air freight sharply increases emissions, and delaying shipments to a weekly cycle violates the retailer's replenishment schedule.
-
15 Question 15 Single choice Global Logistics
A medical device manufacturer ships devices from a plant in Germany to a distributor in Brazil. Customs clearance has been delayed repeatedly because the commercial invoice does not match the harmonized tariff classification on the import declaration. The company needs to resolve the issue before the next shipment, which is perishable in its sterile packaging window. Which action should be taken FIRST?
Correct Answer: AExplanationMismatched classification is the root cause of the delays, so the classification must be confirmed and the invoice and declaration aligned before any further shipment moves. Changing the product description to avoid review misstates the goods and creates compliance exposure. Paying duty in cash does not cure the classification mismatch, and switching to air freight only gets the same non-compliant paperwork to the port faster.
-
16 Question 16 Single choice Order Management
A distributor receives orders through an electronic data interchange feed and a web portal. Duplicate orders are being created when customers resubmit after a portal timeout, and the warehouse is shipping twice for the same purchase order. The fix must work across both channels, preserve the audit trail, and avoid rejecting legitimate repeat orders for the same product. Which control BEST resolves the problem?
Correct Answer: BExplanationEnforcing a uniqueness check on the customer purchase order number across both channels blocks duplicates at intake, keeps the audit trail intact, and still allows legitimate repeat orders because each carries its own purchase order number. Disabling the portal loses a channel customers rely on, and nightly manual deletion comes after shipments have already gone out. A one-order-per-day limit blocks legitimate business and does not address the cause.
-
17 Question 17 Single choice Warehouse Management
A cold storage facility stores frozen goods at minus 20 degrees Celsius and is evaluating a new warehouse management system module to manage lot expiration. Regulators require full traceability of lot movements for product recall readiness, and the site cannot take downtime during peak season. The IT team proposes a cutover over a single weekend. Which implementation approach BEST meets the traceability requirement while protecting operations?
Correct Answer: CExplanationA parallel run with reconciliation of lot records confirms that traceability is intact before the old process is retired, which protects both recall readiness and operations. A peak-season cutover risks disruption at the worst time. Paper-only records during transition create gaps in traceability that regulators would question, and disabling lot tracking breaks the regulatory requirement outright.
These are 17 of the 150 questions in the full CLTD pack.
Get All 150 QuestionsGet all 150 questions & answers
Full access options for APICS CLTD
Self-study
PDF Version
- 150 actual exam questions
- Compatible with all devices
- Printable PDF format
- No download limits
- 90 days free updates
- 24/7 customer support
Best value
Bundle Pack
- Discounted PDF + online access
- 150 actual exam questions
- Both PDF and online practice test
- Free 90 days updates
- No download or practice limits
- 24/7 customer support
Exam simulation
Online Practice Test
- 150 actual exam questions
- Actual exam environment
- 90 days free updates
- Browser-based software
- 24/7 customer support
100% Money Back Guarantee
Your success comes first
At DumpsProvider, we give you a 100% money back guarantee on all of our exam dumps. For us, your success is the #1 priority and we are more than confident that our exam material will help you pass the CLTD Exam (Certified in Logistics, Transportation and Distribution) on your very first attempt.
In a rare case, if you fail your exam, we will refund your amount without asking a single question.