Exam Information
Free practice questions with explanations
VMware 3V0-22.21 Practice Questions
Answer a question to see the correct answer and the explanation, or click Show answer. Newest questions first.
- Questions
- 15
- Answered
- 0
- Correct
- 0
- Score
- -
-
1 Question 1 Single choice Administrative and Operational Tasks
A company runs a vSphere 7.x environment with a single vCenter Server and an embedded-style file-based backup target on an NFS share. The operations team must restore vCenter Server to a previous state after an accidental deletion of a folder hierarchy. Regulations require that the restore be performed with the least possible downtime for the management plane, and the team must keep the same vCenter Server identity and IP address. A new appliance was deployed for the restore and the backup file is available. Which action should the administrator take to meet these requirements?
Correct Answer: CExplanationThe vCenter Server appliance installer provides a restore workflow that deploys a new appliance from a file-based backup, which preserves the original vCenter identity and IP address. Restoring the backup into a freshly deployed appliance is the supported approach and avoids manual database file copies. Deploying a new appliance and reassigning the IP first creates an identity conflict and misses the restore step, while restoring ESXi configuration backups addresses hosts, not the vCenter inventory. Copying database files by hand is unsupported and would not restore the vCenter configuration reliably.
-
2 Question 2 Multiple choice Installing, Configuring, and Setup
A financial firm is deploying a new vSphere 7.x cluster and must ensure that administrators authenticate with their corporate Active Directory accounts through vCenter Single Sign-On. Security policy forbids using local SSO accounts for daily administration, and the directory is reached over LDAPS. Which TWO actions are required to meet these requirements? (Choose two.)
Correct Answer: C, DExplanationActive Directory over LDAP or LDAPS is attached to vCenter Single Sign-On as an identity source, which requires directory connection details and a bind account. For LDAPS, the directory certificate chain must be trusted by vCenter, otherwise the secure connection fails validation. Granting a role on the root object is an authorization step, not an identity source configuration. The vSphere Authentication Proxy is used for Active Directory integration of ESXi hosts, not for vCenter SSO. Creating a local SSO account conflicts with the stated policy.
-
3 Question 3 Dropdown Architectures and Technologies
A team is documenting a vSphere 7.x design and must record the correct vSphere Lifecycle Manager cluster image configuration command used when reviewing a cluster's desired state. Select the correct value for each blank.
Choose the correct value for each blank.
Get-Cluster -Name Prod-01 | Get-DesiredImage; Set-Cluster -Cluster Prod-01 -VMwareImage -Confirm:$false; Get-VMHost -Location Prod-01 | Test-Compliance -ImageCorrect Answer:Get-Cluster -Name Prod-01 | Get-DesiredImage; Set-Cluster -Cluster Prod-01 -VMwareImage ESXi-Standard-Image -Confirm:$false; Get-VMHost -Location Prod-01 | Test-Compliance -Image cluster-desired
ExplanationCluster image management in vSphere 7.x uses a desired image concept, and the PowerCLI cmdlets operate on that image. The correct image selection is the one that reflects the configured desired state rather than an arbitrary template name. Test-Compliance compares hosts against the cluster-desired image. The other names are not valid image identifiers in the vSphere Lifecycle Manager model, and the vum-baseline and patch-baseline options belong to the deprecated baseline model rather than images.
-
4 Question 4 Order list Administrative and Operational Tasks
A cluster in a vSphere 7.x environment has been configured with a host profile, and a reference host must be used to capture the desired configuration. The team must update the profile after a legitimate change on the reference host and then remediate the other hosts in the cluster without disrupting running workloads. Arrange the steps in the correct order.
Drag the steps into the correct order, or use the arrows.
- Check each cluster host for compliance against the updated host profile.
- Place each non-compliant host into maintenance mode before remediation.
- Remediate the hosts using the host profile and exit maintenance mode afterward.
- Update the host profile from the reference host so it captures the new configuration.
Correct Answer:- Update the host profile from the reference host so it captures the new configuration.
- Check each cluster host for compliance against the updated host profile.
- Place each non-compliant host into maintenance mode before remediation.
- Remediate the hosts using the host profile and exit maintenance mode afterward.
ExplanationA host profile is updated from a reference host to capture the new configuration before it is applied anywhere. Compliance is then checked against the updated profile so the drift is identified across the cluster. Maintenance mode is required before remediation because applying host profile settings can require host-level changes that affect running workloads. Remediation occurs only after the host is in maintenance mode, and exiting maintenance mode restores normal operation.
-
5 Question 5 Single choice Administrative and Operational Tasks
A vSphere 7.x environment has a distributed switch used by production workloads in two clusters. A network engineer must migrate some VMs from a standard switch on a host to the distributed switch, keeping their port group VLAN tags unchanged and avoiding loss of connectivity. The VMs use vmnic uplinks that are also needed for management traffic on the host, and the host must retain at least one active management uplink during the change. Which approach meets these constraints?
Correct Answer: AExplanationMigrating a host from a standard switch to a distributed switch is done through the distributed switch wizards, which allow uplinks and VMkernel adapters to be moved incrementally. Moving one uplink at a time while keeping a management uplink active preserves management connectivity throughout. Moving every uplink in one step cuts off management traffic, and deleting port groups first disconnects VMs. Network I/O Control is a distributed switch feature and does not migrate VMs between switch types.
-
6 Question 6 Drag and drop Performance-tuning, Optimization, and Upgrades
A cluster hosts latency-sensitive VMs for a trading application, and the operations team must tune the configuration to reduce scheduling delay while keeping other VMs on the cluster unaffected. Match each requirement to the vSphere feature that meets it.
Drag each item onto its matching target. On a phone: tap an item, then tap a target.
Reduce scheduling jitter for a single VM handling market dataEnsure a VM is never migrated to a host with an incompatible CPU feature setPrevent one VM from consuming excessive CPU during contentionFault Tolerance secondary VMLatency sensitivity setting on the VMPer-VM Enhanced vMotion CompatibilityCluster-level Distributed Power ManagementCPU limit on the VMCorrect Answer:- Reduce scheduling jitter for a single VM handling market data → Latency sensitivity setting on the VM
- Ensure a VM is never migrated to a host with an incompatible CPU feature set → Per-VM Enhanced vMotion Compatibility
- Prevent one VM from consuming excessive CPU during contention → CPU limit on the VM
ExplanationThe latency sensitivity setting on a VM adjusts how the hypervisor schedules that VM to reduce jitter without changing the whole cluster. Per-VM Enhanced vMotion Compatibility restricts the CPU feature baseline that a particular VM can run against, supporting migration safety for that VM alone. A CPU limit caps how much CPU a VM can consume, which is the right control for preventing excessive consumption. Distributed Power Management and Fault Tolerance do not address those stated requirements.
-
7 Question 7 Single choice Administrative and Operational Tasks
An operations team manages a vSphere 7.x environment with a vCenter Server that must forward logs to a central syslog server for audit. The auditors require that the vCenter Server audit trail is retained and that the team can verify log collection after configuration. The team also wants to keep log transport encrypted. Which configuration best satisfies these requirements?
Correct Answer: BExplanationvCenter Server can forward its logs to a remote syslog destination, and encrypted transport is achieved by using TLS for the forwarding target. Verification is done by reviewing the appliance logs and confirming the events arrive at the syslog server. Leaving vCenter logs local fails the audit requirement, and remote console log export is not a continuous forwarding solution. File-based backups capture configuration and database state rather than an ongoing audit trail of log events.
-
8 Question 8 Single choice Installing, Configuring, and Setup
A company is standing up a new vSphere 7.x cluster that will host a mix of production databases and general workloads. The cluster must tolerate the failure of one host without restarting VMs, and it must keep vSphere HA admission control enabled so that failover capacity is always guaranteed. The team is deciding how to reserve capacity. Which configuration meets these requirements?
Correct Answer: DExplanationWith admission control enabled and the cluster resource percentage policy, the reserved percentage is set to match the capacity of one host, which guarantees failover capacity for a single host failure. Disabling admission control removes the guarantee the team requires, and DRS does not restore HA capacity without reservation. Tolerating zero host failures provides no protection, and allowing VMs to power on without available slots defeats admission control's purpose.
-
9 Question 9 Multiple choice Troubleshooting and Repairing
A vSphere 7.x cluster with HA enabled reports that certain VMs cannot be powered on after a host failure, and the cluster shows a warning that failover capacity is insufficient. The administrator must identify the root causes and apply corrective actions without disabling admission control. Which TWO actions should the administrator take? (Choose two.)
Correct Answer: C, DExplanationVM reservations consume the capacity that admission control must keep free for failover, so reservations that are too large cause insufficient failover capacity. Corrective actions are to lower those reservations or add capacity such as another host. Disabling HA removes the protection the cluster is meant to provide, and changing DRS automation does not create failover capacity. The vCenter heartbeat interval has no bearing on admission control capacity calculations.
-
10 Question 10 Dropdown Troubleshooting and Repairing
A support engineer is checking a vSphere 7.x ESXi host that is intermittently disconnected from vCenter Server. The engineer wants to confirm the host's management network configuration and test the vCenter connection from the host shell. Select the correct value for each blank.
Choose the correct value for each blank.
esxcli network ip interface list; vmkping -ICorrect Answer:esxcli network ip interface list; vmkping -I vmk0 vcenter.example.local
Explanationvmk0 is the default management VMkernel interface on ESXi, so pinging through it verifies the path the host uses to reach vCenter. The vCenter Server name is the correct destination for the connectivity test. vmnic0 is a physical uplink rather than a VMkernel interface, and vSwitch0 is a virtual switch. Testing against the host's own name or a subnet range does not verify the vCenter path.
-
11 Question 11 Single choice Performance-tuning, Optimization, and Upgrades
A vSphere 7.x environment has an application that runs on several VMs with fluctuating demand. The administrator sets up resource pools so that the production pool receives twice the shares of the development pool during contention. Users report that some production VMs are starved during peak load even though the pool shares are configured as intended. The pool hierarchy has a CPU limit set on the development pool and a reservation on the production pool that is larger than the sum of its VMs' reservations. Which action most directly resolves the starvation while keeping the intended priority?
Correct Answer: AExplanationA resource pool reservation larger than the reservations of the VMs inside it holds capacity the pool cannot use, which starves other consumers and can cause the apparent starvation of production VMs. Removing the excess reservation returns that capacity to the scheduler while keeping the shares-based priority intact. Increasing shares changes the intended ratio without fixing the hierarchy problem, and disabling the development limit does not address the production pool reservation. Moving VMs to the root pool discards the hierarchy design.
-
12 Question 12 Single choice Troubleshooting and Repairing
A vSAN cluster in a vSphere 7.x environment reports that one of its datastores is nearly full and that VM objects are reported as degraded. The cluster is configured with a default storage policy requiring RAID-1 mirroring with a failure-tolerance setting of one. The administrator needs to restore compliance quickly and must not violate the requirement to keep data protection on all VMs. Which action should be taken first?
Correct Answer: AExplanationThe first step is to use the vSAN health service and object compliance views to determine which objects are degraded and why, since capacity pressure and degraded state can have different causes. Lowering failures to tolerate removes data protection and violates the stated requirement. Deleting snapshots without investigation can remove data needed for recovery. Disabling vSAN destroys the datastore and is not a remediation step.
-
13 Question 13 Order list Installing, Configuring, and Setup
A company is deploying a new vSAN cluster in a vSphere 7.x environment. The hosts have been installed with ESXi and added to a vCenter Server, but the cluster has not yet been configured for vSAN. The team must enable vSAN safely with the correct network and storage configuration and verify the datastore is ready for workloads. Arrange the steps in the correct order.
Drag the steps into the correct order, or use the arrows.
- Verify the vSAN cluster health and that the vSAN datastore is available before deploying VMs.
- Confirm that all hosts can communicate over the vSAN network before enabling the service.
- Create a VMkernel adapter with the vSAN service enabled on each host's storage network.
- Enable vSAN on the cluster and select the automatic or manual disk claiming mode.
Correct Answer:- Create a VMkernel adapter with the vSAN service enabled on each host's storage network.
- Enable vSAN on the cluster and select the automatic or manual disk claiming mode.
- Verify the vSAN cluster health and that the vSAN datastore is available before deploying VMs.
- Confirm that all hosts can communicate over the vSAN network before enabling the service.
ExplanationvSAN requires VMkernel adapters with the vSAN service configured on each host before the cluster can form. Connectivity between hosts on the vSAN network should be confirmed before enabling the feature to avoid partition issues. Enabling vSAN on the cluster is done after the network is ready, and disk claiming is selected during that process. The health check and datastore verification come last, before workloads are deployed.
-
14 Question 14 Drag and drop Troubleshooting and Repairing
A vSphere 7.x administrator is diagnosing a set of storage and network problems in an environment with iSCSI-attached datastores and a standard switch. Match each symptom to the most likely area to investigate first.
Drag each item onto its matching target. On a phone: tap an item, then tap a target.
Datastores disconnect intermittently and show path failures to the iSCSI targetVMs on one port group lose connectivity only after a VLAN change on the physical switchA host shows a mismatch between physical NIC speed and the switch portvCenter Server inventory tag assignmentsPhysical uplink link speed and duplex settingsiSCSI VMkernel port binding and path stateHost profile storage policyVLAN ID configuration on the port groupCorrect Answer:- Datastores disconnect intermittently and show path failures to the iSCSI target → iSCSI VMkernel port binding and path state
- VMs on one port group lose connectivity only after a VLAN change on the physical switch → VLAN ID configuration on the port group
- A host shows a mismatch between physical NIC speed and the switch port → Physical uplink link speed and duplex settings
ExplanationIntermittent iSCSI path failures are investigated through VMkernel port binding and the state of the paths to the target. A VLAN change affecting only one port group points to the port group VLAN ID configuration, which must match the physical switch. Speed and duplex mismatches are diagnosed at the physical uplink settings. Inventory tags and host profile storage policies do not cause these connectivity symptoms.
-
15 Question 15 Single choice Performance-tuning, Optimization, and Upgrades
A company runs a vSphere 7.x cluster with mixed CPU generations. Enhanced vMotion Compatibility is enabled at the cluster level at a baseline that is older than the newest hosts. A specific VM running a legacy database needs to use a CPU feature only available on the newest hosts, but the cluster EVC baseline must not be raised because older hosts remain in service for other workloads. The team must allow this one VM to run on the newer feature set while preserving migration compatibility for it. Which action meets these constraints?
Correct Answer: BExplanationPer-VM EVC lets an individual VM use a CPU baseline different from the cluster baseline, which lets this VM expose the newer feature set while the cluster baseline remains for other workloads. Raising the cluster baseline would exclude older hosts from the cluster's compatibility, which the scenario forbids. Disabling EVC removes migration compatibility for the VM. Manually editing CPU masks is unsupported and error-prone compared with the per-VM EVC setting.
These are 15 of the 17 questions in the full 3V0-22.21 pack.
Get All 17 QuestionsGet all 17 questions & answers
Full access options for VMware 3V0-22.21
Self-study
PDF Version
- 17 actual exam questions
- Compatible with all devices
- Printable PDF format
- No download limits
- 90 days free updates
- 24/7 customer support
Best value
Bundle Pack
- Discounted PDF + online access
- 17 actual exam questions
- Both PDF and online practice test
- Free 90 days updates
- No download or practice limits
- 24/7 customer support
Exam simulation
Online Practice Test
- 17 actual exam questions
- Actual exam environment
- 90 days free updates
- Browser-based software
- 24/7 customer support
100% Money Back Guarantee
Your success comes first
At DumpsProvider, we give you a 100% money back guarantee on all of our exam dumps. For us, your success is the #1 priority and we are more than confident that our exam material will help you pass the 3V0-22.21 Exam (Advanced Deploy VMware vSphere 7.x) on your very first attempt.
In a rare case, if you fail your exam, we will refund your amount without asking a single question.