Exam Information
Free practice questions with explanations
Microsoft AZ-120 Practice Questions
Answer a question to see the correct answer and the explanation, or click Show answer. Newest questions first.
- Questions
- 16
- Answered
- 0
- Correct
- 0
- Score
- -
-
1 Question 1 Single choice Design and implement an infrastructure to support SAP workloads on Azure
A company is deploying an SAP S/4HANA production system on Azure. The SAP HANA database must run on a virtual machine that is certified by SAP for HANA and must provide the required memory. The architecture team also needs the SAP application servers to be placed in close network proximity to the database to meet a strict dialog response time target. The team wants to minimize network latency between the application tier and the database tier while keeping the deployment within a single datacenter. Which action should the architect take?
Correct Answer: BExplanationA proximity placement group keeps the grouped virtual machines on hardware that is physically close within one datacenter, which is what the latency requirement calls for. Separate availability zones increase fault isolation but add cross-zone latency, so they work against the stated goal. Accelerated Networking reduces host network overhead on each virtual machine but does not control physical placement, and it must be enabled on the database tier as well to matter. Peering a separate virtual network does not reduce the physical distance between tiers and adds a hop.
-
2 Question 2 Single choice Design and implement an infrastructure to support SAP workloads on Azure
An SAP team is building an automated deployment pipeline for a three-tier SAP NetWeaver landscape on Azure. The pipeline must use infrastructure as code and must be repeatable across development, quality assurance, and production subscriptions. The team also wants the SAP-specific software configuration, such as instance numbering and central services settings, handled by a framework designed for SAP landscapes rather than custom scripts. Which combination best meets these requirements?
Correct Answer: BExplanationBicep and ARM templates provide infrastructure as code for the virtual machine and network layer, and the SAP Deployment Automation Framework automates the SAP-specific layer on top of it, which satisfies both stated requirements. Relying on ARM templates with custom scripts fails the request for a framework designed for SAP landscapes. Azure Advisor produces recommendations and does not deploy anything. Azure Monitor action groups send notifications or invoke webhooks and are not a deployment mechanism for SAP installation.
-
3 Question 3 Single choice Design and implement high availability and disaster recovery (HADR)
A manufacturing company runs SAP S/4HANA on two Linux virtual machines configured as a high availability pair for the HANA database. The company requires that the cluster never promotes the secondary node while the primary is still running, because a split-brain would corrupt data. The cluster uses Pacemaker. The administrator must configure an Azure-based fencing mechanism that forcibly isolates the failed node through the Azure control plane rather than relying on shared disk arbitration. Which configuration should the administrator implement?
Correct Answer: BExplanationThe Azure fence agent is a STONITH device that uses the Azure management API to power off or deallocate the failed virtual machine, which is the control-plane isolation the requirement describes. SBD is a valid fencing option but it relies on shared disk arbitration, which the company explicitly excludes, and disabling STONITH removes the protection against split-brain entirely. A load balancer health probe only steers traffic and does not fence a node. Azure Site Recovery is a disaster recovery replication service and is not a cluster fencing mechanism.
-
4 Question 4 Single choice Design and implement high availability and disaster recovery (HADR)
A retail company hosts an SAP Central Services cluster for its SAP ERP system across two virtual machines. Business leadership has asked for a 99.99 percent availability target for the central services tier. The architect is deciding between placing the two virtual machines in an availability set and placing them in separate availability zones within the same region. Both options are supported for SAP central services clustering. Which deployment choice is the BEST way to meet the availability target?
Correct Answer: BExplanationAvailability zones protect against datacenter-level failures, and deploying the cluster nodes across zones gives the highest SLA tier for virtual machines in a pair, which is what the target requires. Placing both nodes in one zone and an availability set still exposes them to a single datacenter failure. Putting both in one fault domain offers no hardware isolation. Mixing a zonal and a non-zonal placement leaves the non-zonal node without a matching SLA and creates an inconsistent failover design.
-
5 Question 5 Single choice Maintain SAP workloads on Azure
A financial services firm runs an SAP BW system on Azure virtual machines. Its Azure Advisor report shows a recommendation to resize an SAP application server virtual machine because average CPU utilization is consistently below 10 percent over the past 30 days. The team also wants to reduce spend without disrupting the next quarterly batch window, which requires the current memory footprint. Before resizing, the architect must confirm that the SAP workload will not be harmed. Which action should be taken FIRST?
Correct Answer: BExplanationAdvisor's sizing recommendation is driven by CPU, and SAP BW batch workloads are often memory bound, so checking memory metrics in Azure Monitor first confirms the next quarter's requirement is met by a smaller size. Buying a reservation locks in the current size and does not resolve whether the size is correct. Downsizing immediately without validating memory risks batch failures. Disabling the recommendation hides a useful signal and skips the validation step entirely.
-
6 Question 6 Single choice Maintain SAP workloads on Azure
A healthcare organization runs an SAP HANA database on a large memory-optimized virtual machine that operates around the clock. The company has committed to running this workload for the next three years and wants the lowest possible compute cost while retaining flexibility to change the virtual machine family if needed. Other SAP application server virtual machines in the same subscription have unpredictable scaling needs. Which purchasing approach is MOST appropriate for the HANA database virtual machine?
Correct Answer: BExplanationA Savings Plan for compute commits to a spending amount per hour and applies across eligible compute regardless of size or family, which fits the stated need for flexibility on a steady three-year workload. Pay-as-you-go with shutdowns does not fit a database that runs around the clock. Spot virtual machines can be evicted at any time, which is unacceptable for a production HANA database. A reserved instance locks the exact size and cannot follow a family change, so it conflicts with the flexibility requirement.
-
7 Question 7 Single choice Migrate SAP workloads to Azure
A logistics company is migrating an SAP ERP system running on Oracle to Azure. The current on-premises database is 9 TB and the project plan targets a cutover in six weeks. The business accepts the database engine staying unchanged for this phase but wants to move to SAP HANA later. The architect must choose a migration strategy that moves the system to Azure quickly while keeping the database platform the same. Which migration approach should the architect select?
Correct Answer: BExplanationA lift and shift keeps the application and database platform unchanged and is the fastest route to Azure, which matches the six-week timeline and the decision to defer the HANA move. Migrating to HANA in the same window adds a database conversion that the business explicitly deferred and that a six-week plan cannot absorb. A rebuild with a manual export of nine terabytes is slow and error-prone for the timeline. Retiring the system is a business transformation decision outside the scope of the stated migration.
-
8 Question 8 Single choice Migrate SAP workloads to Azure
A company plans to deploy a new SAP BW/4HANA system on Azure in a region where its subscription has a regional quota for a specific memory-optimized virtual machine family. The estimated sizing requires eight vCPU-heavy virtual machines in that family, but the current regional quota allows only four. The go-live date is fixed, and the team must avoid a procurement delay. Which action is the BEST way to resolve the constraint?
Correct Answer: BExplanationCore quotas are per subscription and per region for each virtual machine family, and the supported path to increase them is a quota request, which is the correct action here. Spreading machines across subscriptions still counts against regional limits for that family and does not resolve the shortfall as intended. Running SAP application servers as containers on a smaller virtual machine changes the supported architecture and does not satisfy the sizing estimate. Reducing the sizing ignores a requirement the architect has already determined is needed.
-
9 Question 9 Multiple choice Design and implement an infrastructure to support SAP workloads on Azure
A bank is deploying SAP NetWeaver application servers on Azure. The virtual machines must achieve low network latency and high throughput between tiers and must also satisfy network security requirements that only allow SAP application traffic on specific ports. Which TWO configurations meet these requirements? (Choose two.)
Correct Answer: B, DExplanationAccelerated Networking offloads networking to the host hardware and reduces latency and jitter for supported virtual machine sizes, addressing the performance requirement. Network security group rules that permit only the required SAP ports between tiers enforce the port restriction the bank needs. Allowing all outbound traffic violates the restriction, routing internal traffic through a public load balancer adds exposure and latency, and disabling IP forwarding does not control port-level access and is not the right control for this requirement.
-
10 Question 10 Multiple choice Design and implement high availability and disaster recovery (HADR)
An energy company runs an SAP S/4HANA landscape with a HANA database pair and SAP central services on Azure. The company wants to guarantee that a failover of the central services cluster does not leave the enqueue server in an inconsistent state, and it needs the cluster to detect and recover from a failed resource without manual intervention. Which THREE actions should the architect take? (Choose three.)
Correct Answer: A, B, EExplanationFencing with STONITH ensures the failed node is isolated before resources move, which protects the enqueue state from concurrent access. Managing central services as a cluster resource with enqueue replication keeps lock state consistent through failover. The load balancer health probe on the virtual IP is what steers client traffic to the active node once the cluster moves the resource. Disabling health monitoring removes automatic recovery, and storing the profile on one node breaks failover because the secondary cannot start the instance.
-
11 Question 11 Single choice Design and implement high availability and disaster recovery (HADR)
A pharmaceutical company must have a disaster recovery solution for its SAP ERP production system, which runs on Azure virtual machines in a primary region. The company requires a recovery point objective of 15 minutes and a recovery time objective of four hours. Data residency rules require the secondary copy to remain in the same country as the primary region. The architect is designing replication for the application and database virtual machines. Which design meets these requirements?
Correct Answer: DExplanationAzure Site Recovery replicates virtual machines continuously to a secondary region and supports recovery point and recovery time targets in the range the company needs, and choosing a paired region within the same country satisfies data residency. Daily backups cannot deliver a fifteen-minute recovery point objective. A weekly manual export fails both objectives. Zone-redundant storage protects within one region and provides no regional disaster recovery.
-
12 Question 12 Single choice Design and implement an infrastructure to support SAP workloads on Azure
An SAP team is configuring the Azure Center for SAP solutions service for an existing SAP S/4HANA system running on virtual machines already deployed in the subscription. The team wants the service to discover the SAP system and surface its health and status without redeploying the infrastructure. Which prerequisite must the team satisfy before the existing system can be registered with the service?
Correct Answer: DExplanationThe Azure VM extension for SAP solutions is the component that gathers SAP system information from the virtual machines, and it must be present for discovery and monitoring to work. Converting to unmanaged disks is not a requirement and runs against current practice. Moving to a new subscription is unnecessary because the service works within the existing subscription. Removing network security groups weakens security and is not a prerequisite.
-
13 Question 13 Single choice Maintain SAP workloads on Azure
A utility company has an SAP ERP system whose database backups are managed by Azure Backup. The current policy keeps daily backups for 30 days. Auditors now require that the company retain monthly recovery points for seven years to meet records retention rules, while keeping storage costs low. The backup administrator must update the protection without losing the existing recovery points. Which change best meets the requirement?
Correct Answer: DExplanationAzure Backup supports long-term retention rules inside a backup policy that keep selected recovery points, such as monthly ones, for a longer period while keeping the short-term daily schedule cheap. Deleting the policy risks removing protected items and their recovery points. Keeping every daily point for seven years is far more costly and does not implement the monthly intent. Manual exports bypass the managed service and create operational risk for records retention.
-
14 Question 14 Single choice Migrate SAP workloads to Azure
A manufacturer must migrate an SAP BW system to Azure. The BW system's existing SAP license is tied to the physical hardware identifier of the on-premises servers. The licensing team wants to avoid buying new SAP licenses for the migration, and the architect needs to identify the licensing consideration before planning the cutover. Which action should the architect take to address the licensing requirement?
Correct Answer: DExplanationSAP licenses are often tied to hardware or installation identifiers, so the architect must confirm with SAP licensing whether the license can move to Azure virtual machines before committing to the cutover plan. Assuming automatic transfer skips a real compliance requirement. Azure reserved instances cover infrastructure cost and do not satisfy SAP software licensing obligations. Running on a trial license is non-compliant for a production system.
-
15 Question 15 Single choice Migrate SAP workloads to Azure
A government agency is migrating SAP HR to Azure. The agency's security policy requires that all SAP administrators access the environment only from managed devices and only for a limited time, with approval recorded. The architect is designing access control for the SAP virtual machines. Which Azure feature best implements the time-limited, approval-based administrative access requirement?
Correct Answer: DExplanationPrivileged Identity Management provides just-in-time elevation with eligible assignments, time-bound activation, and approval workflows, which matches the requirement for limited access with recorded approval. Permanent Owner assignments violate the time-limited requirement. A shared local account with a text-file password fails both approval tracking and security policy. Opening management ports to all sources during business hours exposes the environment and provides no approval control.
-
16 Question 16 Single choice Design and implement an infrastructure to support SAP workloads on Azure
An architect is designing the network for an SAP S/4HANA system that uses a hub-and-spoke topology. The application virtual machines are in a spoke virtual network and must reach an SAP HANA database in a separate spoke. Traffic between the two spokes must pass through a central network virtual appliance for inspection, and the spokes must not communicate directly. Which configuration achieves this requirement?
Correct Answer: DExplanationForcing traffic through a network virtual appliance requires user-defined routes that point the next hop at the appliance, and peering is the mechanism that connects the spokes to the hub while the routes steer the flow. Direct peering with network security groups does not perform deep inspection and does not stop direct spoke communication. A single subnet removes the required inspection point. Routing through on-premises adds latency and does not meet the stated topology.
These are 16 of the 324 questions in the full AZ-120 pack.
Get All 324 QuestionsGet all 324 questions & answers
Full access options for Microsoft AZ-120
Self-study
PDF Version
- 324 actual exam questions
- Compatible with all devices
- Printable PDF format
- No download limits
- 90 days free updates
- 24/7 customer support
Best value
Bundle Pack
- Discounted PDF + online access
- 324 actual exam questions
- Both PDF and online practice test
- Free 90 days updates
- No download or practice limits
- 24/7 customer support
Exam simulation
Online Practice Test
- 324 actual exam questions
- Actual exam environment
- 90 days free updates
- Browser-based software
- 24/7 customer support
100% Money Back Guarantee
Your success comes first
At DumpsProvider, we give you a 100% money back guarantee on all of our exam dumps. For us, your success is the #1 priority and we are more than confident that our exam material will help you pass the AZ-120 Exam (Planning and Administering Microsoft Azure for SAP Workloads) on your very first attempt.
In a rare case, if you fail your exam, we will refund your amount without asking a single question.