Get All Certified Data Centre Specialist Exam Questions with Validated Answers
| Vendor: | GAQM |
|---|---|
| Exam Code: | CDCS-001 |
| Exam Name: | Certified Data Centre Specialist |
| Exam Questions: | 40 |
| Last Updated: | February 21, 2026 |
| Related Certifications: | Certified Data Centre |
| Exam Tags: | Intermediate Level |
Looking for a hassle-free way to pass the GAQM Certified Data Centre Specialist exam? DumpsProvider provides the most reliable Dumps Questions and Answers, designed by GAQM certified experts to help you succeed in record time. Available in both PDF and Online Practice Test formats, our study materials cover every major exam topic, making it possible for you to pass potentially within just one day!
DumpsProvider is a leading provider of high-quality exam dumps, trusted by professionals worldwide. Our GAQM CDCS-001 exam questions give you the knowledge and confidence needed to succeed on the first attempt.
Train with our GAQM CDCS-001 exam practice tests, which simulate the actual exam environment. This real-test experience helps you get familiar with the format and timing of the exam, ensuring you're 100% prepared for exam day.
Your success is our commitment! That's why DumpsProvider offers a 100% money-back guarantee. If you don’t pass the GAQM CDCS-001 exam, we’ll refund your payment within 24 hours no questions asked.
Don’t waste time with unreliable exam prep resources. Get started with DumpsProvider’s GAQM CDCS-001 exam dumps today and achieve your certification effortlessly!
True or False: Human error is a major cause of data center downtime
Human error is a major cause of data center downtime. Human mistakes are one of the top causes of data center outages, accounting for around one-third of all downtime incidents. Common causes of human error in data centers include misconfiguration, inadequate maintenance, and improper security practices. To reduce the risk of human error, it is important to ensure that data center staff receive proper training, have adequate access control measures in place, and are familiar with best practices for data center operations.
Which type of power can be a source available to the data center that takes over the function of supplying when utility power is unavailable?
Standby power, also known as backup power, is a type of power that can be a source available to the data center that takes over the function of supplying when utility power is unavailable. Standby power systems are designed to provide power to critical loads in the event of a power outage, and can include generators, uninterruptible power supplies (UPS), and batteries. Standby power systems can be used to provide power to the data center for a short period of time, such as a few hours or days, until utility power is restored.
Passive, Active and Alternate are not specific type of power sources used in data center. They are terms used in different context and have different meaning.
Which one of the following is a disadvantage of Water Cooled System?
Water cooled systems introduce an additional source of liquid, which can be a potential source of contamination and damage to the IT equipment. Additionally, water cooled systems require more maintenance than air cooled systems and are more expensive to install due to the additional cost of the cooling tower, piping, and pumps.
Which one of the following measures the real power drawn by the load equipment?
Watts measures the real power drawn by the load equipment and is determined by multiplying the volts and amps of the load
Which mounted system can use any of the five heat removal methodologies?