2026 Actual GAQM CDCS-001 Dumps, Updated Exam Questions for Guaranteed Pass

Certified Data Centre Specialist - Free Practice Questions with Explanations, Exam Dumps, and Complete Practice Pack from DumpsProvider.

Exam Information

VendorGAQM
Exam codeCDCS-001
Exam nameCertified Data Centre Specialist
Questions in pack40
Last updatedNovember 22, 2026
Related certificationsCertified Data Centre

Free practice questions with explanations

GAQM CDCS-001 Practice Questions

Answer a question to see the correct answer and the explanation, or click Show answer. Newest questions first.

Questions
15
Answered
0
Correct
0
Score
-
  1. 1 Question 1 Single choice Fundamentals of Power

    A data centre in a region with frequent short voltage sags runs a 480 V three-phase feed to a row of UPS-backed racks. Facilities measured the real power drawn by the IT load at 360 kW while the apparent power at the switchboard is 450 kVA. The operations manager wants to size the new PDU transformer and asks what the power factor is so the cabling and breaker ratings can be checked. Which statement best describes the situation and the correct next step?

  2. 2 Question 2 Multiple choice Generator Management

    A colocation site has a diesel standby generator that failed to pick up load during a utility outage because its battery-powered starting system was flat. Engineers found that the battery charger had been tripped for months and that the fuel polishing filters were overdue for replacement. The site must restore dependable automatic start-up and reduce the chance of fuel-related stalls during the next outage, with no budget for a new generator. Which two actions best meet these requirements? (Choose two.)

  3. 3 Question 3 Order list Fundamentals of Security

    A managed data centre has received a request from a regulated client to add a dedicated caged suite with badge-controlled entry and a logged visitor process, and the client's auditor has requested evidence that access rights were verified before go-live. Facilities has the card reader hardware on site and the client's authorised personnel list in hand. Arrange the steps in the correct order.

    Drag the steps into the correct order, or use the arrows.

    1. Configure the access control system to grant the suite doors only to the enrolled badge holders.
    2. Verify the client's approved personnel list against identity documents at a supervised enrolment.
    3. Test a denied-access scenario and a valid entry to confirm the controls work and are logged.
    4. Assign each authorised person a badge with access limited to the caged suite.
    5. Record the physical asset inventory of the racks and equipment inside the suite.
  4. 4 Question 4 Drag and drop Cooling Layouts for Data Center

    A co-location operator is planning a retrofit of a 300 kW hall where racks are arranged in hot and cold aisles but hot exhaust is recirculating over the top of the rack rows, and the operator cannot add floor space or change the chilled water plant. Each requirement below should be matched to the cooling measure that best satisfies it. Match each requirement to the measure that meets it.

    Drag each item onto its matching target. On a phone: tap an item, then tap a target.

    Deliver cold air to the intake of each cabinet at a consistent temperature without relocating the chilled water plant
    Stop hot exhaust air from looping back over the top of the rack rows into the cold aisle
    Prevent unused rack spaces from letting hot air pass through the cabinet to the cold aisle
    Upgrade the chilled water supply to a lower set point throughout the building
    Position perforated floor tiles in front of rack intakes
    Relocate the computer room air handlers to the ceiling plenum
    Install hot aisle containment with a roof panel
    Fit blanking panels in empty rack units
  5. 5 Question 5 Dropdown Fundamentals of Power

    A facility manager is reviewing a power distribution plan for a new cage with eight 16 A single-phase outlets on a 230 V supply. The circuit must remain within the 80 percent continuous loading rule and the breaker must be sized accordingly. Complete the sizing statement by selecting the correct value for each blank.

    Choose the correct value for each blank.

    A 16 A outlet on a 230 V circuit can supply a continuous maximum of A, so the branch breaker should be rated at A, and the cage design must not exceed kW of continuous load on that branch.
  6. 6 Question 6 Single choice Generator Management

    A data centre's emergency generator is rated for a standby duty and has been tested monthly at no load. During a recent three-hour utility outage the engine began to show black smoke and rising exhaust temperatures after being loaded to 40 percent for the first time in a year. The operator must restore reliable performance for the next outage without replacing the engine. Which maintenance action is the most appropriate first step?

  7. 7 Question 7 Multiple choice Fundamentals of Security

    A colocation provider is reviewing the physical security of a suite containing a financial client's high-value servers. An internal audit found that staff hold doors open for colleagues, that badge readers log entry but do not require a second factor, and that the perimeter fence has a gap near a loading bay that is monitored only by a camera with no recording. The client's contract requires strong authentication at the suite door and detection of unauthorised presence in the loading bay. Which two actions best satisfy these requirements? (Choose two.)

  8. 8 Question 8 Single choice Cooling Layouts for Data Center

    A hosting company's room houses 40 racks with a combined heat load of 180 kW and uses an air-cooled self-contained unit with an integrated condenser in the room. Engineers note that the condenser discharge air is recirculating back into the intake of the unit because the unit sits against a wall with only 300 mm of clearance. The company wants to restore rated capacity without relocating the room or adding a new unit. Which correction is the most appropriate?

  9. 9 Question 9 Order list Fundamentals of Power

    A facility has a 400 kVA UPS feeding a critical bus and a data centre team needs to verify that a power failure is handled without dropping load. The team has the batteries, the bypass switch and the load bank available for testing during a maintenance window. Arrange the steps in the correct order.

    Drag the steps into the correct order, or use the arrows.

    1. Record the battery runtime and compare it with the design requirement before closing the maintenance window.
    2. Confirm battery charge and runtime readings before any test is started.
    3. Transfer the critical load to the static bypass and confirm the UPS output is still stable.
    4. Restore the input supply and check that the rectifier returns to float charge and the UPS is back on normal mode.
    5. Simulate a utility failure by opening the input feed and observe battery discharge on the load.
  10. 10 Question 10 Drag and drop Generator Management

    A facility operator has a standby generator set and an automatic transfer switch serving a critical distribution board. During a planned audit the team must confirm that each component of the generator and switchgear works as intended. Match each requirement below to the component or measure that satisfies it. Match each requirement to the item that meets it.

    Drag each item onto its matching target. On a phone: tap an item, then tap a target.

    Ensure that the generator output is regulated to a stable voltage under changing load
    Ensure that the transfer to generator supply occurs only after the utility has failed and the generator is ready
    Protect the generator frame and enclosure so that a fault current has a low-impedance path to earth
    Fuel day tank level indicator
    Equipment grounding conductor bonded to the frame
    Automatic voltage regulator
    Battery float charger output monitor
    Automatic transfer switch sensing and transfer logic
  11. 11 Question 11 Dropdown Cooling Layouts for Data Center

    A data centre engineer is documenting a raised-floor airflow design for a 12-rack hot-aisle and cold-aisle row. The cold aisle must receive air at the intake temperature the rack vendor specifies, and the floor tile plan must avoid unbalanced pressure. Complete the design note by selecting the correct value for each blank.

    Choose the correct value for each blank.

    Cold aisle supply air should be delivered through floor tiles placed in front of each rack intake, the cold aisle should be kept at a positive pressure relative to the hot aisle by ensuring the perforated tile total open area does not exceed of the plenum supply capacity, and the hot aisle exhaust should be returned to the cooling units through return path.
  12. 12 Question 12 Single choice Fundamentals of Security

    A managed services provider runs a secure room for a government client that stores classified backup media. The client requires that no single staff member can both approve and execute a media release, and that every access event be reviewed by someone outside the operating team. The provider wants the least costly change that satisfies both conditions using its existing access control system. Which measure is the best choice?

  13. 13 Question 13 Multiple choice Generator Management

    A colocation site is preparing a generator room for an inspection after a complaint about exhaust and noise near residential neighbours. The inspection has highlighted that the generator exhaust silencer has corroded and that the battery cabinet lacks ventilation, while the generator maintenance log shows monthly load bank tests were not recorded for the past year. The operator must restore compliance and maintain availability through the next season. Which two actions best meet these requirements? (Choose two.)

  14. 14 Question 14 Single choice Fundamentals of Power

    A data centre is designing a 415 V three-phase distribution board that will feed a mix of single-phase servers and three-phase cooling units. The electrical engineer needs to balance the single-phase loads across the three phases so that the neutral current stays within the design limit and the transformer is not overloaded. Which action best achieves this?

  15. 15 Question 15 Single choice Fundamentals of Security

    A colocation provider hosts a mid-sized bank's trading racks in a room where tailgating incidents have been recorded at the main door. The bank's compliance team requires that every entry be attributable to a named individual and that the entry record survive a badge-cloning attack. The facility already has a card reader at the door. Budget is limited and the building owner will not allow new doors to be installed. Which measure best meets the requirement at the lowest additional cost?

These are 15 of the 40 questions in the full CDCS-001 pack.

Get All 40 Questions

Get all 40 questions & answers

707 Satisfied customers
95.3% Pass rate feedback
84.2% Said questions matched
97% Found material helpful

Full access options for GAQM CDCS-001

Self-study

PDF Version

$40.00 $20.00
  • 40 actual exam questions
  • Compatible with all devices
  • Printable PDF format
  • No download limits
  • 90 days free updates
  • 24/7 customer support

Exam simulation

Online Practice Test

$50.00 $25.00
  • 40 actual exam questions
  • Actual exam environment
  • 90 days free updates
  • Browser-based software
  • 24/7 customer support

100% Money Back Guarantee

Your success comes first

At DumpsProvider, we give you a 100% money back guarantee on all of our exam dumps. For us, your success is the #1 priority and we are more than confident that our exam material will help you pass the CDCS-001 Exam (Certified Data Centre Specialist) on your very first attempt.

In a rare case, if you fail your exam, we will refund your amount without asking a single question.

100%

Security & Privacy

10000+

Satisfied Customers

24/7

Committed Service

100%

Money Back Guranteed