Free practice questions with explanations

GAQM CDCP-001 Practice Questions

Answer a question to see the correct answer and the explanation, or click Show answer. Newest questions first.

Questions
14
Answered
0
Correct
0
Score
-
  1. 1 Question 1 Single choice Fundamentals of Availability

    A regional bank runs a core transaction platform in a single data centre with a contractual availability target of 99.99 percent per year. Over the last twelve months the facility recorded 4 hours and 20 minutes of unplanned outage, traced to a utility feed failure that the generator bridged imperfectly. The CFO asks the data centre manager whether the outage breached the target. Which statement is correct?

  2. 2 Question 2 Single choice Fire protection methods in the Data Center

    A colocation operator is refitting a server hall that holds lithium-ion battery racks and energised IT equipment. The design brief requires that the suppression system clear the hazard without residue, avoid water damage to live electronics, and keep the hall occupiable after discharge within the agent's specified concentration. The operator is comparing a water sprinkler system, a water mist system, an inert gas system and a foam system. Which approach best meets all of the stated requirements?

  3. 3 Question 3 Single choice Fundamentals of Cabling strategies for Data Centers

    A data centre is adding a new row of 40 high-density switches that will each use 48 copper uplinks terminated in a patch panel at the end of the row. The design team wants a layout that keeps the horizontal cable runs under the 90 metre channel limit, minimises congestion in the overhead pathway, and allows a technician to trace and replace a single cable without disturbing adjacent bundles. Which cable layout architecture should the team select?

  4. 4 Question 4 Single choice Fundamentals of Cooling I

    A mid-sized data centre has a CRAC unit whose evaporator coil is operating with a very low suction pressure and frosting along the coil surface, while the condenser runs hot. The facilities engineer suspects a restriction in the refrigerant circuit. Measurements show the liquid line is cool to the touch at the expansion device, and the discharge pressure is high. Which component is the most likely cause, and what is the correct corrective step?

  5. 5 Question 5 Multiple choice Fundamentals of Cooling II : Humidity in the Data Center

    A data centre in a dry climate experiences occasional electrostatic discharge events affecting server boards during winter, while summer humidity sometimes drifts high enough to cause condensation risk on chilled water coils. The operator wants to stabilise moisture levels using control methods that respond to the actual conditions rather than fixed setpoints. Which TWO actions best address both problems? (Choose two.)

  6. 6 Question 6 Order list Fundamentals of Availability

    A facilities team has just experienced an unplanned loss of utility power at a data centre. The UPS carried the load, but the generator failed to start automatically and the team must restore normal operation while protecting the critical load and documenting the event for the availability report. Arrange the steps in the correct order.

    Drag the steps into the correct order, or use the arrows.

    1. Transfer the critical load to the generator bus and monitor the UPS for stable operation
    2. Inspect the generator start circuit and record the fault for root cause analysis
    3. Start the generator manually and verify output voltage and frequency before transfer
    4. Confirm the UPS is carrying the critical load and estimate remaining battery runtime
    5. Restore utility power, retransfer the load and log the outage duration for availability reporting
  7. 7 Question 7 Drag and drop Fundamentals of Cabling strategies for Data Centers

    A data centre operations lead is reviewing cable management practices after a series of intermittent link errors and difficult troubleshooting sessions. Each finding relates to a cable management or maintenance practice that addresses it. Match each finding to the practice that resolves it.

    Drag each item onto its matching target. On a phone: tap an item, then tap a target.

    Cables routed across floor tiles that block the cold aisle airflow path
    Unlabelled copper trunks that take hours to trace during moves and changes
    Fibre patch cords bent tighter than the manufacturer's minimum bend radius near the cabinet door
    Apply a documented labelling scheme at both ends of every cable
    Route cords with radius-controlling guides and respect minimum bend radius
    Standardise on a single cable colour for every network zone
    Route cabling in overhead or underfloor pathways away from airflow openings
    Increase patch cord length to reduce strain on connectors
  8. 8 Question 8 Dropdown Fundamentals of Cooling I

    A data centre technician is recording the refrigeration cycle states of a precision cooling unit while diagnosing a rising room temperature. The unit's readings show the refrigerant changing phase at each stage of the cycle. Complete the description of the cycle by selecting the correct value for each blank.

    Choose the correct value for each blank.

    In the evaporator the refrigerant absorbs heat from the room air and undergoes . The compressor raises the pressure of the vapour, which then passes to the condenser where it releases heat and undergoes . The expansion device then reduces the pressure of the liquid before it returns to the evaporator.
  9. 9 Question 9 Dropdown Fundamentals of Cooling II : Humidity in the Data Center

    A data centre manager is configuring the humidity control points on a computer room air handler after a recent audit flagged both dry-air static risk and condensation risk. The controller shows the relevant parameter fields. Select the correct value for each blank so the control strategy holds the room within its moisture envelope.

    Choose the correct value for each blank.

    Set the humidity control to so the controller regulates moisture content, and set the humidifier to activate when the measured falls below the lower limit of the envelope.
  10. 10 Question 10 Single choice Fundamentals of Availability

    A financial services firm operates a data centre whose cooling plant has been the most frequent cause of unplanned downtime. Management wants to decide where to invest the next budget cycle. The operations team reports that a single 6 hour cooling outage would cost roughly 180,000 USD in lost trading, while a redundant CRAC unit costs 90,000 USD and would prevent most cooling-related outages. The team has also learned that the facility's lease ends in 14 months and a relocation would strand that spend. Which action is the most cost-effective first step?

  11. 11 Question 11 Single choice Fundamentals of Cabling strategies for Data Centers

    A data centre team must perform cable maintenance on a live row of fibre links that carry production traffic. A technician needs to replace one damaged patch cord without interrupting the other links in the same bundle, and the change must be auditable. Which practice should the team follow?

  12. 12 Question 12 Single choice Fundamentals of Cooling II : Humidity in the Data Center

    A data centre operator has converted a former office floor into IT space. The converted area uses a legacy air handler with an evaporative humidifier and has no integrated dew point sensor. Operators report frequent humidifier cycling and drifting humidity during low load periods. The equipment vendor states that the humidifier must run at a rate matched to the actual moisture demand, and the air handler's fan runs at fixed speed. Which issue is most likely causing the frequent cycling and what is the correct fix?

  13. 13 Question 13 Order list Fundamentals of Cooling I

    A data centre team is commissioning a new precision cooling unit after installation. The refrigerant circuit has been pressure-tested and the unit is ready for its first charge and performance verification. Arrange the commissioning steps in the correct order so that the circuit is safe, charged correctly and verified before the load is placed on it.

    Drag the steps into the correct order, or use the arrows.

    1. Charge the circuit with the specified refrigerant quantity while the unit is off
    2. Connect the unit to the building management system and enable alarm monitoring for pressure and temperature
    3. Evacuate the refrigerant circuit to the specified vacuum level and hold it to confirm there are no leaks
    4. Energise the unit and start the compressor, then check suction and discharge pressures against design values
    5. Confirm evaporator airflow and temperature split across the coil before accepting the unit
  14. 14 Question 14 Drag and drop Fundamentals of Availability

    A data centre availability review classifies each incident reported over the past year by its root cause category, so that the team can target improvements. Match each incident to the category that best describes its root cause.

    Drag each item onto its matching target. On a phone: tap an item, then tap a target.

    A technician isolated the wrong PDU branch and dropped a live rack during maintenance
    A chiller tripped after a firmware update altered its low-pressure cutout threshold
    A storm downed a utility transformer feeding the facility
    Equipment failure
    Fire suppression discharge triggered by a faulty detector
    Human error
    Cooling issue caused by an undersized airflow design
    Natural disaster

These are 14 of the 40 questions in the full CDCP-001 pack.

Get All 40 Questions

Get all 40 questions & answers

745 Satisfied customers
93.8% Pass rate feedback
84.6% Said questions matched
96% Found material helpful

Full access options for GAQM CDCP-001

Self-study

PDF Version

$40.00 $20.00
  • 40 actual exam questions
  • Compatible with all devices
  • Printable PDF format
  • No download limits
  • 90 days free updates
  • 24/7 customer support

Exam simulation

Online Practice Test

$50.00 $25.00
  • 40 actual exam questions
  • Actual exam environment
  • 90 days free updates
  • Browser-based software
  • 24/7 customer support

100% Money Back Guarantee

Your success comes first

At DumpsProvider, we give you a 100% money back guarantee on all of our exam dumps. For us, your success is the #1 priority and we are more than confident that our exam material will help you pass the CDCP-001 Exam (Certified Data Centre Professional (CDCP)) on your very first attempt.

In a rare case, if you fail your exam, we will refund your amount without asking a single question.

100%

Security & Privacy

10000+

Satisfied Customers

24/7

Committed Service

100%

Money Back Guranteed