1 Question 1 Single choice Architecture
A regional insurer is replacing its legacy ACD with Avaya Contact Center Select (ACCS) deployed alongside Avaya IP Office. The operations director wants agents to keep taking calls during a planned outage of the ACCS server, and wants the design to avoid buying additional hardware for every site. Which statement correctly describes how ACCS delivers this benefit?
Correct Answer: BExplanationACCS is a software contact center application that sits on a Windows server and integrates with IP Office for telephony, so the phone system continues to provide basic calling when the contact center application is down. The regional insurer can therefore avoid a separate dedicated appliance per site. The appliance claim is wrong because ACCS is software, not an appliance. The idea that ACCS replaces the PBX misreads the integration model, which keeps IP Office in charge of call control. Assigning queue state to the media server is also incorrect, since the media server handles media streams rather than contact center routing logic.
-
2 Question 2 Dropdown Administration
A contact center supervisor at a bank must prepare an IVR recording update and needs the correct wording of the tasks involved. The team has been asked to record and maintain prompts for announcements and to verify the audio files used by the sample application before change control. Complete the sentence by selecting the correct value for each blank: Prompts for the ACCS application are created and maintained in the [1] component, and the audio files are verified by using the [2] option.
Choose the correct value for each blank.
Prompts for the ACCS application are created and maintained in the component, and the audio files are verified by using the option.Correct Answer:Prompts for the ACCS application are created and maintained in the Prompt Management component, and the audio files are verified by using the Test Prompt option.
ExplanationPrompt Management is the ACCS component that stores and maintains announcement recordings, so the bank's prompt changes belong there rather than in the flow designer. The verification step is done by playing the file through the test prompt function before a change is released. Orchestration Designer is the tool for building routing scripts, not for storing prompts, so it fails the requirement. Outbound Campaign Management Tool is for dialing campaigns and has no role in prompt storage. Real-Time Display only shows live statistics. The other audio options are not the defined verification action in the product.
-
3 Question 3 Drag and drop Implementation
A managed services provider is deploying ACCS for a client with a split architecture: Avaya Aura Media Servers handle media, a WebLM server manages licensing, and the ACCS server runs the contact center applications. The engineer must document which component is paired with each deployment consideration before the cutover plan is approved. Match each requirement to the component that meets it.
Drag each item onto its matching target. On a phone: tap an item, then tap a target.
Centrally distribute and track license entitlements for the ACCS deploymentProcess and stream the voice and media paths for queued contactsHost the contact center applications, routing services and agent desktop servicesACCS serverIP Office ManagerAvaya Aura Media ServerAvaya Aura System ManagerWebLM serverCorrect Answer:- Centrally distribute and track license entitlements for the ACCS deployment → WebLM server
- Process and stream the voice and media paths for queued contacts → Avaya Aura Media Server
- Host the contact center applications, routing services and agent desktop services → ACCS server
ExplanationWebLM is the license server that issues entitlements to ACCS, so license management must be designed around it. The Avaya Aura Media Servers terminate and process the media streams used for contact center treatment and queuing. The ACCS server holds the core contact center application logic, routing and desktop services. IP Office Manager is used to configure the telephony platform, not to serve licenses or process media for ACCS. System Manager manages Avaya Aura solutions but is not the mapped license server for this deployment, so both extra targets fail to match any requirement.
-
4 Question 4 Multiple choice Troubleshooting
A healthcare call center reports that after a maintenance window, the ACCS server shows agents as unlicensed and some agents cannot log in, while the rest of the system works. The license server is reachable from the ACCS server. The administrator must restore service quickly and confirm the cause is in license assignment rather than in the phone system. Which two actions are the most appropriate to take first? (Choose two.)
Correct Answer: D, EExplanationThe symptoms point to license assignment, so the first checks are the entitlement and assignment on WebLM against the ACCS server and the agent count, together with the license status and error messages recorded by ACCS. Reinstalling media servers does not touch the license entitlements, so it is an unnecessary and disruptive step. Deleting agent accounts destroys configuration and does not regenerate licenses correctly. Disconnecting IP Office would break telephony and is not how license checks are done, so it does not address the root cause.
-
5 Question 5 Single choice Business Continuity
A university runs two ACCS campus sites connected by a dedicated WAN link and must keep taking calls if one campus loses its server room. Management insists that the design must not depend on a single shared media resource, and the budget does not allow a third site. The network team proposes placing all Avaya Aura Media Servers at one campus. Which design best meets the business continuity requirement?
Correct Answer: CExplanationA campus redundancy design needs media capability at both campuses so a site failure does not eliminate the media path, which is why the media servers are distributed across the two sites. The proposal to keep media at one campus fails because losing that campus removes all media processing. Relying on the WAN link ties service to a single shared resource and does not survive the loss of the server room. A third site is ruled out by the budget and is not required for a two-site redundant design. Licensing location alone does not provide media processing.
-
6 Question 6 Order list Implementation
A retailer is deploying a new ACCS server with Avaya Aura Media Servers and IP Office for a holiday season go-live. The project manager needs the implementation tasks sequenced so that licensing, the media path and telephony integration are verified before agents are moved to the new platform. Arrange the steps in the correct order.
Drag the steps into the correct order, or use the arrows.
- Test call routing and media paths with test agents before cutover
- Configure the IP Office integration and the secure link between IP Office and ACCS
- Move production agents to the ACCS platform and monitor real-time displays
- Install the ACCS server software and the Avaya Aura Media Servers on their designated hosts
- Register the ACCS and media server entitlements with the WebLM license server and verify assignment
Correct Answer:- Install the ACCS server software and the Avaya Aura Media Servers on their designated hosts
- Register the ACCS and media server entitlements with the WebLM license server and verify assignment
- Configure the IP Office integration and the secure link between IP Office and ACCS
- Test call routing and media paths with test agents before cutover
- Move production agents to the ACCS platform and monitor real-time displays
ExplanationThe software must be installed before anything else can be configured or licensed, so installation comes first. Licensing is applied and verified before the integration and testing that depend on entitlements. The IP Office link and its security are configured before the routing tests can exercise the telephony path. Testing with test agents must happen before production agents are moved, to avoid disrupting service. Moving production agents and monitoring comes last, once the platform has proven working.
-
7 Question 7 Single choice Administration
A financial services firm runs ACCS for inbound service and wants a new outbound collections campaign that dials customers only within their local time zone and respects a do-not-call list. The supervisor has been given agent and supervisor privileges but not administrative rights over campaign settings. Which action should be performed first to configure the campaign correctly?
Correct Answer: AExplanationOutbound dialing in ACCS is configured in the Outbound Campaign Management Tool, where the campaign, its dialing rules and contact lists are defined and suppression lists are attached before activation. Building the calling logic in Orchestration Designer confuses the inbound flow designer with the outbound campaign setup. Scheduling reports does not affect campaign creation, so putting it first is wrong. Granting administrative rights is not required because the supervisor's privilege level is stated as sufficient for the task, and the prompt step is not the first prerequisite.
-
8 Question 8 Single choice Troubleshooting
An energy company's ACCS server stops receiving calls routed from IP Office after a network change. Agents see the server as online, and IP Office shows the link to ACCS as down. The change board requires that the fix does not weaken the security of the link between the two systems. Which action is the most appropriate first step?
Correct Answer: CExplanationThe symptom is a link that is down while ACCS itself is up, so the first step is to verify the configuration of the link on both systems and confirm the network change has not blocked traffic. This preserves the secured connection required by the change board. Disabling the secure link violates the stated constraint and removes a protection that should remain. Restarting agent desktops does not repair a server-to-server link, and reinstalling the application is a disproportionate step that does not address a network-level fault.
-
9 Question 9 Multiple choice Administration
A logistics company wants supervisors to build a customized real-time display for queue performance and to generate scheduled reports for management, without giving supervisors administrative access to the server. The administrator must set up privileges and configure these capabilities correctly. Which two actions meet the requirements? (Choose two.)
Correct Answer: C, EExplanationSupervisors can be given a supervisor privilege profile that allows them to work with real-time displays and reports without any server administrator rights, and the customized real-time display is created through the ACCS administration interface. Granting the operating system administrator account violates the constraint against administrative access. Editing database tables directly bypasses the supported reporting tools and is not a sound approach. Orchestration Designer is the flow design tool and is not used to build real-time displays.
-
10 Question 10 Dropdown IP Office Configurations
A telecom integrator is preparing an IP Office system to integrate with ACCS for a retail contact center. The IP Office configuration must provide the contact center with a dedicated user and a correct integration setting, and the integrator is documenting the required entries before the change window. Complete each statement by selecting the correct value for each blank: On the IP Office, the ACCS integration uses a [1] user account with the [2] configuration set as the contact center integration.
Choose the correct value for each blank.
On the IP Office, the ACCS integration uses a user account with the configuration set as the contact center integration.Correct Answer:On the IP Office, the ACCS integration uses a service user account with the Contact Center configuration set as the contact center integration.
ExplanationThe IP Office integration with ACCS relies on a dedicated service-type user account, which keeps the integration separate from personal user accounts, and the integration is documented under the contact center configuration. A guest account is a temporary-style account and does not suit a persistent integration identity. Hot desk users are tied to physical phones, which is unsuitable for a server-side link. Voicemail-only accounts provide no contact center capability. Call Center Reporting and Hunt Group Fallback are unrelated settings, and Voicemail Pro is a separate voicemail application, so neither fits the integration.
-
11 Question 11 Drag and drop Architecture
A hospital group is evaluating how ACCS delivers benefits to its operations, and its architect must explain each capability to the board before approval. The architect needs to match each benefit to the feature of the ACCS solution that provides it. Match each benefit to the feature that provides it.
Drag each item onto its matching target. On a phone: tap an item, then tap a target.
Reduce the need for a separate standalone contact center platform for each siteKeep telephony running for agents when the contact center application is offlineGive supervisors live visibility into queue activity during the shiftIntegration with IP Office for call controlDedicated outbound dialer hardwareReal-time displays for queue monitoringHardware contact center appliance with built-in PBXSingle software deployment on a Windows serverCorrect Answer:- Keep telephony running for agents when the contact center application is offline → Integration with IP Office for call control
- Give supervisors live visibility into queue activity during the shift → Real-time displays for queue monitoring
- Reduce the need for a separate standalone contact center platform for each site → Single software deployment on a Windows server
ExplanationIP Office provides call control, so telephony continues for agents even when the contact center application is unavailable. Real-time displays give supervisors live queue visibility during a shift. The software deployment on a Windows server removes the need for separate platforms. The appliance and dedicated dialer options describe hardware architectures that ACCS does not rely on, so they match no stated benefit.
-
12 Question 12 Single choice Implementation
A pharmacy chain is installing ACCS with a WebLM license server and has been told that the license server must remain available for the lifetime of the contact center. The chain's IT policy forbids placing new servers in branch offices. The architect must decide where to host WebLM so it is reachable by the ACCS server and is not a single point of failure for branch operations. Which decision is best?
Correct Answer: BExplanationWebLM is a central license server that must be reachable by the ACCS server, so hosting it centrally on a reliable server with backup and recovery satisfies both the connectivity and the availability needs without adding branch servers. Installing it on workstations in each branch conflicts with the policy and creates unnecessary license fragmentation. Hosting it on IP Office mixes licensing with telephony and is not the defined deployment. Placing it on a media server assumes availability that the design cannot guarantee, and the claim that such servers need no backups is unsound.
-
13 Question 13 Order list Business Continuity
A government agency runs ACCS with Avaya Aura Media Servers in a high availability environment and needs to prepare the media tier for a planned failover test. The network engineer must sequence the high-level configuration steps correctly so that the media servers are ready before the test begins. Arrange the steps in the correct order.
Drag the steps into the correct order, or use the arrows.
- Run a controlled failover of media processing and confirm calls continue through the standby server
- Register the media servers with the ACCS server so the contact center can use them
- Install and configure the Avaya Aura Media Servers on both nodes of the high availability pair
- Configure the high availability relationship between the media servers and verify the synchronization status
Correct Answer:- Install and configure the Avaya Aura Media Servers on both nodes of the high availability pair
- Configure the high availability relationship between the media servers and verify the synchronization status
- Register the media servers with the ACCS server so the contact center can use them
- Run a controlled failover of media processing and confirm calls continue through the standby server
ExplanationThe media servers must be installed and configured on both nodes before any high availability relationship can be built. The high availability relationship must be established and synchronized before the media servers are registered with ACCS, so the contact center sees a stable pair. Registration with ACCS must come before the failover test, because the test depends on ACCS using the pair. The controlled failover is performed last, once the redundant pair is fully working.
-
14 Question 14 Single choice Implementation
A utility company is securing the links between ACCS and IP Office after an audit identified unencrypted credentials on the integration link. The security team requires encryption and mutual trust between the two systems, and wants the configuration to be auditable. Which approach best meets these requirements?
Correct Answer: DExplanationSecuring the ACCS and IP Office link means enabling the secure link option and maintaining the trust and certificate configuration on both systems, so the connection is both encrypted and authenticated and can be audited. Network isolation alone does not encrypt the credentials, so the audit finding remains open. Rotating passwords does not encrypt the traffic and leaves the link in plain text. Disabling authentication removes the mutual trust the security team required.
-
15 Question 15 Single choice Business Continuity
A large retailer operates a campus redundancy design with two ACCS sites. During a planned test, the operations team wants to confirm that business continuity is achieved without losing already-queued contacts. The design rule states that the standby site must take over with no manual reconfiguration of agents. Which requirement must be verified before the test is considered valid?
Correct Answer: AExplanationThe campus redundancy requirement is that the standby campus can take over service, which depends on its own media capability and on being configured so agents need no manual changes. Powering off the primary for a day is an unnecessary and risky test that does not validate the takeover itself. Migrating the reporting database is not required to prove service continuity for queued contacts. Pausing outbound campaigns is a process choice and does not verify the redundancy design.
These are 15 of the 65 questions in the full 78950X pack.
Get All 65 QuestionsGet all 65 questions & answers
Full access options for Avaya 78950X
Self-study
PDF Version
- 65 actual exam questions
- Compatible with all devices
- Printable PDF format
- No download limits
- 90 days free updates
- 24/7 customer support
Best value
Bundle Pack
- Discounted PDF + online access
- 65 actual exam questions
- Both PDF and online practice test
- Free 90 days updates
- No download or practice limits
- 24/7 customer support
Exam simulation
Online Practice Test
- 65 actual exam questions
- Actual exam environment
- 90 days free updates
- Browser-based software
- 24/7 customer support
100% Money Back Guarantee
Your success comes first
At DumpsProvider, we give you a 100% money back guarantee on all of our exam dumps. For us, your success is the #1 priority and we are more than confident that our exam material will help you pass the 78950X Exam (Avaya Contact Center Select Implementation and Maintenance Exam) on your very first attempt.
In a rare case, if you fail your exam, we will refund your amount without asking a single question.