2026 Actual IASSC ICYB Dumps, Updated Exam Questions for Guaranteed Pass

IASSC Certified Lean Six Sigma Yellow Belt - Free Practice Questions with Explanations, Exam Dumps, and Complete Practice Pack from DumpsProvider.

Exam Information

VendorIASSC
Exam codeICYB
Exam nameIASSC Certified Lean Six Sigma Yellow Belt
Questions in pack120
Last updatedNovember 22, 2026
Related certificationsLean Six Sigma Yellow Belt

Free practice questions with explanations

IASSC ICYB Practice Questions

Answer a question to see the correct answer and the explanation, or click Show answer. Newest questions first.

Questions
13
Answered
0
Correct
0
Score
-
  1. 1 Question 1 Single choice 1.0 Define Phase

    A regional bank's card-processing team has tracked customer complaints for six months. Complaints about failed transactions are the most frequent, followed by statement errors and slow dispute resolution. Leadership wants a Yellow Belt to select the first project and must justify the choice with a financial argument for the charter, using only data already on hand. Which action best supports this selection?

  2. 2 Question 2 Single choice 1.0 Define Phase

    A manufacturing plant produces a machined housing. The customer specification requires a bore diameter between 24.95 mm and 25.05 mm, and the customer has said that any part outside this range causes an assembly line stop at their site. The project team is writing the Critical to Quality characteristics for the project charter. Which statement best defines the CTQ for this requirement?

  3. 3 Question 3 Single choice 2.0 Measure Phase

    A hospital laboratory uses a single technician and a single analyser to measure blood glucose. The quality team wants to know whether the measurement system is adequate before judging process capability. They have 10 control samples with known reference values, measured at different times by the same technician. Measurements show consistent scatter around each sample's true value, and the average reading is higher than the reference value across the whole range of the samples. Which conclusion is correct?

  4. 4 Question 4 Single choice 2.0 Measure Phase

    A call centre tracks average handle time for its support team. A Gage R and R study on the timing system used by supervisors shows the measurement system accounts for 38 percent of total study variation, with most of the variation coming from differences between supervisors rather than repeat timings by the same supervisor. The project sponsor asks the team to start a capability study on handle time immediately to save time. Which action should the team take FIRST?

  5. 5 Question 5 Single choice 5.0 Control Phase

    A food packaging line uses 5S to organise its changeover area. Three months after the initial sort, shadow boards are being used for the changeover tools, but operators keep returning tools to the wrong slots and dies sometimes go missing overnight. The plant manager wants a low-cost sustainable control, not new storage fixtures. Which control method best addresses the recurring misplacement?

  6. 6 Question 6 Single choice 5.0 Control Phase

    A warehouse runs a Kanban system to replenish picking bins from a central store. Each bin holds 40 units, and the replenishment lead time from the supplier is 3 days. Average daily usage is 12 units per bin, and the team wants to keep a safety stock equal to one day of usage. The kanban card for each bin is set to trigger a reorder when the bin reaches a reorder point. Which reorder point and card count set-up is correct for one bin?

  7. 7 Question 7 Multiple choice 5.0 Control Phase

    A pharmaceutical filling line has an operator who sometimes fails to attach the correct cap size to vials, causing product recall risk. Management wants mistake-proofing rather than retraining alone. Which TWO actions are valid poka-yoke approaches for this failure? (Choose two.)

  8. 8 Question 8 Order list 1.0 Define Phase

    A retail chain's Lean Six Sigma team has been asked to build a project charter for reducing returned-item processing time. The sponsor has asked that the charter be approved before any detailed data collection begins, and the team must align the scope with the financial case before finalising. Arrange the steps in the correct order.

    Drag the steps into the correct order, or use the arrows.

    1. Confirm the project scope boundaries and the named process owner with the sponsor
    2. Agree on primary and secondary metrics and the target improvement for each
    3. Submit the completed charter for sponsor approval before starting measurement work
    4. Estimate annual savings from reduced processing labour and avoided inventory holding costs
    5. Draft the problem statement with baseline processing time and the affected store count
  9. 9 Question 9 Drag and drop 1.4 Define Phase

    A logistics company is reviewing waste in its order fulfilment process. Team members have observed several distinct problems on the warehouse floor and want each one matched to the correct waste category from the seven wastes of Lean. Match each observation to its waste category.

    Drag each item onto its matching target. On a phone: tap an item, then tap a target.

    Pickers walk 400 metres per order because the bin locations were never arranged by pick frequency
    Completed orders are packed in batches of 500 and sit on the dock for two days before shipment
    Shift supervisors wait for a stock count report that is manually compiled every morning
    Packers redo labels after finding the printer was loaded with the wrong label stock
    Defects
    Waiting
    Motion
    Overproduction
    Transportation
    Inventory
  10. 10 Question 10 Dropdown 2.0 Measure Phase

    A quality analyst at a bottling plant is preparing a sample dataset in a statistics package to check whether fill volumes are normally distributed before calculating process capability. Complete the statements by selecting the correct value for each blank.

    Choose the correct value for each blank.

    The analyst should first examine a plot of the fill volumes, and if the points fall close to a straight line the data are considered with respect to a normal distribution, and then compute a using the calculated mean and standard deviation.
  11. 11 Question 11 Single choice 2.0 Measure Phase

    A medical device maker records the number of cosmetic defects found on each finished housing. Each housing is inspected for defects of any kind, and a housing can carry several. Over 50 inspected units, 120 defects were recorded across 40 units. A team member proposes reporting the process as defects per unit. Which metric is the best choice for the team to report, and what is its value?

  12. 12 Question 12 Single choice 1.0 Define Phase

    A software company is developing a Lean Six Sigma improvement for its customer support queue. Management wants to balance the voice of the customer with the voice of the business. Customer surveys report slow first response, while finance reports that support headcount cost has risen sharply. Which approach best reconciles these inputs when stating the project's goal?

  13. 13 Question 13 Single choice 1.0 Define Phase

    A manufacturer discovers that 6 percent of its finished parts require rework after final assembly. The rework adds 14 minutes of labour and a re-test, and the team expects 9,000 parts per month. The finance director wants the charter to report the cost of poor quality on an annual basis and excludes any labour cost that is already budgeted as overhead. The team has learned that rework labour costs 42 dollars per hour, and the re-test costs 3 dollars per part. Which annual figure should the team report for the rework cost of poor quality?

These are 13 of the 120 questions in the full ICYB pack.

Get All 120 Questions

Get all 120 questions & answers

710 Satisfied customers
95.6% Pass rate feedback
81.3% Said questions matched
94% Found material helpful

Full access options for IASSC ICYB

Self-study

PDF Version

$40.00 $20.00
  • 120 actual exam questions
  • Compatible with all devices
  • Printable PDF format
  • No download limits
  • 90 days free updates
  • 24/7 customer support

Exam simulation

Online Practice Test

$50.00 $25.00
  • 120 actual exam questions
  • Actual exam environment
  • 90 days free updates
  • Browser-based software
  • 24/7 customer support

100% Money Back Guarantee

Your success comes first

At DumpsProvider, we give you a 100% money back guarantee on all of our exam dumps. For us, your success is the #1 priority and we are more than confident that our exam material will help you pass the ICYB Exam (IASSC Certified Lean Six Sigma Yellow Belt) on your very first attempt.

In a rare case, if you fail your exam, we will refund your amount without asking a single question.

100%

Security & Privacy

10000+

Satisfied Customers

24/7

Committed Service

100%

Money Back Guranteed