1 Question 1 Single choice 1.0 Define Phase
A regional insurance claims department wants to start a Lean Six Sigma project to reduce claim processing time. Leadership has asked that the project charter be approved within two weeks. The sponsor has provided a rough estimate of annual savings but no baseline data exists yet. The Black Belt must establish the problem statement and goal while avoiding premature solution commitments. Which element of the project charter should the Black Belt define FIRST so that the scope and success criteria can be measured later?
Correct Answer: DExplanationA charter's problem and goal statements must be anchored to a primary metric with an operational definition and a measurable target, because every later phase depends on that metric to establish baseline and verify improvement. Financial estimates without baseline data are unreliable and typically follow once the metric is quantified. Naming improvements first pushes the team toward solutions before the problem is understood, which the Define phase is meant to prevent. Control audit staffing is a downstream governance decision that does not drive scope or success criteria at chartering.
-
2 Question 2 Single choice 2.0 Measure Phase
A pharmacy packaging line records each tablet bottle as conforming or nonconforming after capping. Over four weeks, 4,800 bottles were inspected and 96 were rejected for incorrect fill level or loose caps. Before calculating the process sigma level, the team lead wants a yield measure that reflects the probability that a bottle passes all inspection points with no rework. The packaging line also has a bottle-level inspection that is performed in two stages, and an upstream filling step that is measured separately. Which metric should the team use to represent the overall first-pass performance of the packaging line?
Correct Answer: AExplanationThe question asks for the probability that a bottle passes all inspection points on the first attempt without rework, which is first time yield measured at the unit level across the full packaging line. Defects per unit counts defects but does not express the proportion of units that pass cleanly. Rolled throughput yield multiplies step yields across the process and is appropriate when the steps are measured separately; here the stem asks for the whole line as seen at bottle level, so the unit-level measure is the defensible one. DPMO normalises by opportunities per unit, which the stem does not define, and it is not the first-pass measure requested.
-
3 Question 3 Single choice 2.0 Measure Phase
A bearing manufacturer uses a go/no-go gauge to check bore diameter. Three inspectors each measure the same 10 parts twice, and the study shows large disagreement between inspectors on borderline parts, but the average measurement of each part is consistent across repeated trials by the same inspector. The quality engineer is preparing a Gage R and R study for a regulatory submission and must decide which error component to address first. Which source of variation should the engineer investigate before anything else?
Correct Answer: AExplanationThe stem explicitly states that each inspector is consistent with their own repeated readings, so repeatability is not the dominant problem. The disagreement between inspectors on the same parts is reproducibility, the operator-to-operator component of measurement variation. That is where the engineer should focus first, typically through standardised procedures, training, and clearer go/no-go criteria. Linearity and stability are not described by the study results, which report no bias across a range or drift over time.
-
4 Question 4 Single choice 3.0 Analyze Phase
A food packaging plant is comparing fill weights from two shifts. The Black Belt samples 25 cartons per shift and runs a two-sample t-test, obtaining a p-value of 0.031 at alpha 0.05. The difference in mean fill weight is 0.4 grams, well within the customer tolerance band, and the operations manager asks whether the shifts should be adjusted. The team also notes that the two shifts' variances look different on the boxplot. Before concluding anything from the t-test, which action should the Black Belt take FIRST?
Correct Answer: AExplanationA statistically significant result does not establish practical significance, and the 0.4 gram difference sits inside the customer tolerance, so the operational question depends on that judgment. The two-sample t-test with pooled variance assumes equal variances, and the boxplot suggests otherwise, so the team should check variance equality, typically with a Levene or F-type test, and use an unequal-variance form if needed. Switching to a one-sample test answers a different question. Raising alpha to inflate significance is an invalid practice, and acting on the p-value alone ignores the stated tolerance context.
-
5 Question 5 Single choice 3.0 Analyze Phase
A hospital laboratory wants to compare the proportion of blood samples rejected for hemolysis across three collection sites. Rejections are recorded as pass or fail per sample, and each site processes several hundred samples per month. The quality analyst plans to use a chi-squared test of independence on a contingency table. Before running the test, the analyst checks the expected cell counts. Which condition must be satisfied for the chi-squared approximation to be valid, and what should the analyst do if it is not?
Correct Answer: BExplanationThe chi-squared approximation relies on expected cell counts, commonly required to be at least 5 in most cells, and the standard remedies are to merge sparse categories or use an exact test such as Fisher's exact. Observed counts above 30 is not the criterion, and ANOVA is for continuous responses, not pass/fail proportions. Identical sample sizes are not required for a contingency table, and weighting by volume would distort the independence test. A rejection-rate threshold has no bearing on validity, and Mann-Whitney applies to continuous or ordinal data.
-
6 Question 6 Single choice 4.0 Improve Phase
A chemical plant models yield as a function of reactor temperature using simple linear regression on 30 batches. The fitted line has an R-squared of 0.82, but the residual-versus-fitted plot shows a clear curved pattern, with residuals positive at low and high temperatures and negative in the middle. The process engineer wants to report a model for the Improve phase recommendation. Which action is the most appropriate next step?
Correct Answer: DExplanationA curved residual pattern indicates the linear form is misspecified, and R-squared alone cannot detect that, so the engineer should fit a model with a quadratic term and check whether the residuals now scatter randomly. Reporting the linear model ignores the systematic residual pattern. Removing batches to clean the plot is data manipulation without a justified cause. Logarithmic transformation of the response changes the scale and does not model the temperature curvature, and reporting an untransformed slope from a transformed model is internally inconsistent.
-
7 Question 7 Single choice 4.0 Improve Phase
A contract manufacturer is building a multiple regression model to predict cycle time from machine speed, operator experience, and ambient humidity. The model is intended to set a planning standard for new orders, so the planning team needs an interval estimate for a single future order rather than for the average order. The current analysis reports a confidence interval for mean cycle time at a chosen set of conditions. Which interval should the team report, and why?
Correct Answer: AExplanationA prediction interval for an individual future response includes both the uncertainty in the estimated mean and the random scatter of individual observations, so it is wider than a confidence interval for the mean and is the right tool for a single order. A confidence interval for coefficients describes parameter estimates, not an individual forecast. A tolerance interval is a different construct that targets a proportion of the population, and the stem does not ask for that. The claim that individual orders vary less than the mean is mathematically wrong, since the mean is far less variable than single observations.
-
8 Question 8 Single choice 5.0 Control Phase
A machining cell produces shafts in subgroups of 5, sampled every hour. The team uses an Xbar-R chart and has noticed that an operator frequently checks the chart only after the process has already drifted. The quality engineer proposes replacing the chart with a method that detects small sustained shifts in the process mean more quickly, because the shifts are typically under one standard deviation. The subgroup size must remain 5 and the team wants to keep the same sampling frequency. Which chart should the engineer select?
Correct Answer: AExplanationEWMA charts apply exponentially decreasing weights to past subgroup means and are designed to detect small, persistent shifts in the mean faster than Shewhart-type charts such as Xbar-R, which are better suited to large shifts. Xbar-S changes the dispersion estimator but does not improve sensitivity to small shifts. A P chart is for attribute data, while the shafts are measured variables. An I-MR chart does not match the subgroup structure the team wants to keep, and its sensitivity to small shifts is not the reason it would be chosen here.
-
9 Question 9 Multiple choice 1.0 Define Phase
A telecommunications company's billing team has a 6-week project to reduce invoice disputes. The sponsor wants the project to be defined so that benefits can be tracked after closure. The team has a draft charter that lists a goal to reduce disputes by 40 percent, a primary metric of disputes per 1,000 invoices, and a note that a new billing engine is needed. Which TWO additions or changes to the charter best support proper project definition and later benefits capture? (Choose two.)
Correct Answer: D, EExplanationA charter needs a documented baseline with its data source and a named financial owner who validates benefits, since benefits capture depends on agreed numbers and accountability. Clear scope boundaries prevent scope creep and make the measured results attributable to the defined process. Removing the goal leaves the project without a success criterion. Prescribing the billing engine as the solution conflicts with the Define phase's problem focus. Excluding finance from benefit calculation undermines the validity of the claimed savings.
-
10 Question 10 Multiple choice 2.0 Measure Phase
A cold storage warehouse wants to understand why pallets are delayed between receiving and putaway. The team has collected data on delay times, shift, dock door, and product family. The Black Belt must choose analysis tools for the Measure phase that help define the process and reveal likely causes before any hypothesis testing. Which TWO tools are most appropriate for this purpose in the Measure phase? (Choose two.)
Correct Answer: C, DExplanationA Cause and Effect diagram organises potential causes before data are tested, and a process map or SIPOC defines the process boundaries, inputs, and outputs that the Measure phase requires. Kruskal-Wallis and Friedman are inferential tests normally run in the Analyze phase after causes are prioritised. A Control Plan belongs to the Control phase and addresses sustaining the improvement, not defining the current process.
-
11 Question 11 Order list 3.0 Analyze Phase
A bakery wants to determine whether three oven settings produce different average moisture content in finished loaves. Samples are drawn from each setting over several days, and the Black Belt must select and apply the correct sequence of analyses. Arrange the steps in the correct order.
Drag the steps into the correct order, or use the arrows.
- If assumptions fail, apply Kruskal-Wallis or Mood's median as a nonparametric alternative
- Check each group for normality and verify equal variances across the three settings
- Collect random samples from each oven setting across several production days
- Run a one-way ANOVA and interpret the F statistic and p-value
- State the null and alternative hypotheses about equal mean moisture content
Correct Answer:- Check each group for normality and verify equal variances across the three settings
- Collect random samples from each oven setting across several production days
- State the null and alternative hypotheses about equal mean moisture content
- Run a one-way ANOVA and interpret the F statistic and p-value
- If assumptions fail, apply Kruskal-Wallis or Mood's median as a nonparametric alternative
ExplanationThe analysis begins with an appropriate sampling design, then the hypotheses are stated before any test is selected. Assumption checks for normality and equal variance decide whether one-way ANOVA is valid, and only then is the ANOVA run and interpreted. The nonparametric alternative is used when the assumptions fail, so it follows the assumption check rather than preceding it. Sampling must precede every test, and hypotheses must be defined before the statistic is interpreted.
-
12 Question 12 Drag and drop 4.0 Improve Phase
A food company is developing a regression model to predict the time a batch of dough needs to rise based on room temperature, yeast concentration, and humidity. The team needs to choose the right regression output for each analytic need during the Improve phase. Match each requirement to the regression output that addresses it.
Drag each item onto its matching target. On a phone: tap an item, then tap a target.
Quantify how strongly yeast concentration and rise time move together in the dataCheck whether the model's errors are independent and have constant varianceDetermine whether a response transformation is needed to stabilise varianceEstimate the range for the rise time of one new batch at chosen conditionsHypothesis test of equal variances across shiftsCorrelation coefficient between the two variablesResidual plots against fitted values and run orderControl chart with subgroup size of fiveBox-Cox transformation analysisPrediction interval for an individual responseCorrect Answer:- Quantify how strongly yeast concentration and rise time move together in the data → Correlation coefficient between the two variables
- Check whether the model's errors are independent and have constant variance → Residual plots against fitted values and run order
- Estimate the range for the rise time of one new batch at chosen conditions → Prediction interval for an individual response
- Determine whether a response transformation is needed to stabilise variance → Box-Cox transformation analysis
ExplanationThe correlation coefficient captures the strength and direction of the linear association between two variables. Residual plots against fitted values and run order reveal dependence and heteroscedasticity in the model errors. A prediction interval covers an individual future batch rather than the average. Box-Cox analysis identifies a power transformation to stabilise variance. The two extra targets concern variance testing and control charting, which are not outputs of the regression analysis.
-
13 Question 13 Dropdown 5.0 Control Phase
A plastics molder uses a P chart to monitor the proportion of defective housings in each daily sample of 200 units. The team is setting up the monitoring documentation and must choose the correct chart types and sample conditions. Select the correct value for each blank in the description of the control setup.
Choose the correct value for each blank.
The team will use a chart because the sample size is constant and the response is a proportion of defective units. If the sample size varies, the team should use a chart instead, and the control limits will then vary by subgroup.Correct Answer:The team will use a P chart because the sample size is constant and the response is a proportion of defective units. If the sample size varies, the team should use a U chart instead, and the control limits will then vary by subgroup.
ExplanationA P chart tracks the proportion of nonconforming units and is appropriate for a fixed sample size of 200 per day. When sample sizes vary, the proportion-based P chart still applies with variable limits, but the stem asks for the alternative count-based chart for defects per unit, which is the U chart. NP charts require a constant sample size and count nonconforming units, so they do not fit a proportion with varying samples. Xbar-R and I-MR are variables charts and cannot monitor attribute defect counts.
-
14 Question 14 Single choice 1.0 Define Phase
A hospital lab is launching a Lean Six Sigma project to cut specimen labeling errors. The Black Belt must describe the Voice of the Customer for the project charter. Three groups are involved: the nursing staff who receive results, the lab technicians who label specimens, and the hospital finance office that funds equipment. The nurses complain about delayed results, the technicians report that label printers jam frequently, and finance wants a payback case before purchasing scanners. Which statement best reflects the Voice of the Business in this charter?
Correct Answer: DExplanationThe Voice of the Business expresses the organisation's financial and strategic requirements, and finance's demand for a documented payback case before capital expenditure is exactly that. Nurses' turnaround requirement is the Voice of the Customer, since they are consumers of the service. Technicians' complaint about printer jams reflects the Voice of the Employee, reporting working conditions. The zero-error target is an imposed standard rather than a stated business need from the stakeholder group described.
These are 14 of the 200 questions in the full ICGB pack.
Get All 200 QuestionsGet all 200 questions & answers
Full access options for IASSC ICGB
Self-study
PDF Version
- 200 actual exam questions
- Compatible with all devices
- Printable PDF format
- No download limits
- 90 days free updates
- 24/7 customer support
Best value
Bundle Pack
- Discounted PDF + online access
- 200 actual exam questions
- Both PDF and online practice test
- Free 90 days updates
- No download or practice limits
- 24/7 customer support
Exam simulation
Online Practice Test
- 200 actual exam questions
- Actual exam environment
- 90 days free updates
- Browser-based software
- 24/7 customer support
100% Money Back Guarantee