Free practice questions with explanations

API API-936 Practice Questions

Answer a question to see the correct answer and the explanation, or click Show answer. Newest questions first.

Questions
11
Answered
0
Correct
0
Score
-
  1. 1 Question 1 Single choice Laboratory Testing Procedures

    A QC technician is preparing test specimens from a batch of dense castable refractory to determine cold crushing strength (CCS) per the applicable test method. The specimens were cast in cube molds, cured for 24 hours at ambient temperature, and then demolded. The lab supervisor asks that the specimens be dried and tested immediately after demolding to save time on the reporting deadline for a customer qualification package. The specification requires CCS results to be reported on specimens that have been cured and dried according to the manufacturer's curing schedule, and the lab has a dryer that can hold the specimens at 110 C.
    Which action is the BEST response to the supervisor's request?

  2. 2 Question 2 Single choice Installation

    A contractor is gunning a 230 mm thick monolithic lining on a cyclone wall. The gunite equipment uses a dry-mix hopper feeding a nozzle, with water added at the nozzle through a separate line. During the shift, the crew notices that the mix is slumping off the wall during build-up on the upwind side of the cyclone, while the downwind side shows rapid stiffening and occasional flash set at the nozzle tip. The ambient temperature has risen sharply after noon, and the water supply line is fed from an elevated tank that sits in direct sun.
    Which corrective action BEST addresses the observed behavior?

  3. 3 Question 3 Multiple choice Inspection

    An inspector is reviewing a completed refractory lining in an aluminum remelt furnace hearth. The repair records show that a 0.9 m section of hot face was removed and re-cast after a crack was detected. The contractor asserts the repair is acceptable because the new section sounded solid under hammer test. The specification requires repairs to be verified against bonding and integrity criteria before acceptance and to be traceable to the installation records. The inspector must confirm the repair with methods beyond the hammer test.
    Which TWO actions should the inspector require to verify the repair? (Choose two.)

  4. 4 Question 4 Single choice Post-Installation

    A new castable hearth for an aluminum holding furnace is being prepared for first heat. The following post-installation tasks must each be matched to the control it addresses:
    1. Keeping the exposed surface moist for the initial set period
    2. Applying a membrane curing compound to the exposed surface
    3. Ramping the lining at the manufacturer's controlled heating rate
    4. Placing thermocouples at the lining hot face and inside the cold face
    Match each task to its purpose:
    A) 1 - Water mist or covering; 2 - Membrane curing; 3 - Heatup schedule; 4 - Temperature monitoring
    B) 1 - Heatup schedule; 2 - Water mist or covering; 3 - Membrane curing; 4 - Temperature monitoring
    C) 1 - Membrane curing; 2 - Water mist or covering; 3 - Temperature monitoring; 4 - Heatup schedule
    D) 1 - Water mist or covering; 2 - Temperature monitoring; 3 - Membrane curing; 4 - Heatup schedule

  5. 5 Question 5 Dropdown Applicator and Material Qualification

    A qualification mockup for a gunned monolithic lining is being built for a rotary kiln inlet. The specification requires that the mockup represent the production installation, including the wall geometry, anchor layout, and the substrate surface prepared the same way as the kiln shell. The mockup is built on a flat steel plate in the shop, and the installer proposes to use the shop mockup results to qualify the field installation without prepping any substrate surface. The mockup must also be built with the applicator and equipment that will be used in the field, and the ambient conditions recorded must match the field conditions the specification defines. Choose the correct value for each blank.

    Choose the correct value for each blank.

    Which combination of mockup and surface requirements is correct? Complete the statement: The mockup be built on a flat plate with no anchors, and the substrate surface be prepared to match the production surface condition.
  6. 6 Question 6 Single choice Installation

    A refractory contractor is installing a cast monolithic lining with an integral steel anchor pattern in a shell that was grit-blasted two days before casting. The supplier data sheet states that the castable must be installed within a specified time after water addition, and the contractor has been mixing batches in a central mixer and transporting them in open buggies to the work face. The day is cool and humid, and the crew has been waiting for the scaffold to be moved, so the wait between mixing and placement has stretched to nearly the full working time. The site engineer notices that the first batches placed have begun to lose workability and are being re-tempered with extra water.
    What is the MOST appropriate corrective measure?

  7. 7 Question 7 Order list Laboratory Testing Procedures

    A laboratory must determine the apparent porosity and bulk density of a set of fired refractory brick specimens for acceptance against a supplier certificate. The specimens have already been fired, cooled, and dimensioned to the required size. Place the following steps in the correct order for the density test: A) 2, 4, 3, 1, 5, 6 B) 4, 2, 3, 1, 5, 6 C) 2, 4, 1, 3, 5, 6 D) 4, 2, 1, 3, 6, 5 Drag the steps into the correct order.

    Drag the steps into the correct order, or use the arrows.

    1. Dry the specimens to constant weight and record the dry weight.
    2. Calculate apparent porosity and bulk density from the recorded weights.
    3. Compare results to the acceptance criteria and document the outcome.
    4. Evacuate and saturate the specimens with water under vacuum.
    5. Immerse the saturated specimens and record the suspended weight.
    6. Weigh the saturated specimens in air after surface moisture is removed.
  8. 8 Question 8 Single choice Applicator and Material Qualification

    A contractor is qualifying a castable refractory for a 1,300 C reheat furnace roof. The manufacturer's data sheet gives a recommended water addition of 5.5 to 6.0 percent by weight, but the crew has been adding water by volume using a bucket, and the test panels show inconsistent flow values between batches. The project specification requires the qualification panels to represent production installation. Which action is the BEST first step to establish the optimal water content?
    A. Increase the water addition to 7 percent to guarantee full flowability before casting the panels.
    B. Weigh the water addition for each batch and run flow tests at several water contents within the manufacturer's range to select the optimum.
    C. Accept the variation and cast the mockup panels using the average water volume recorded across the batches.
    D. Replace the mixer with a high-shear unit and keep the existing water volume so the material homogenises more evenly.

  9. 9 Question 9 Single choice Applicator and Material Qualification

    A refractory installer must qualify a gunned monolithic lining for a rotary kiln hood. The specification requires the qualification mockup to be built under the same environmental and surface conditions as the working lining. The site is in a coastal area where the ambient relative humidity is 85 percent and the steel shell has been left exposed to rain overnight. The foreman proposes casting the mockup on a clean dry panel in the shop at 22 C to save time. What should the qualification mockup most appropriately include?
    A. A shop-built panel on a dry steel plate to prove the material's laboratory properties.
    B. A mockup on a surface prepared to the same cleanliness and dryness as the shell, cured under site humidity and temperature.
    C. A panel prepared with an additional bonding agent to offset the moisture on the shell.
    D. A panel built at a higher temperature to accelerate the gun cure before testing.

  10. 10 Question 10 Single choice Inspection

    A hammer test is performed on a newly installed castable hot face in a ladle preheater. Sound, consistent ringing is recorded across most of the area, but a 1.2 m patch near a tuyere returns a dull, short response. The inspector is asked to decide whether the patch should be cored, sonically tested further or rejected. The project specification requires acceptance based on tested density and bond integrity, and the lining has already been dried out. Which step is the MOST appropriate next action?
    A. Reject the entire patch immediately because a dull hammer response always indicates delamination.
    B. Accept the patch because hammer response is only a qualitative indicator and cannot reveal defects.
    C. Use a sonic test over the patch to map the response, then take core samples at the locations that indicate a weak zone.
    D. Remove the lining and reinstall the patch without further testing to eliminate any doubt.

  11. 11 Question 11 Single choice Inspection

    An inspector is reviewing traceability records for a magnesia-carbon brick shipment used in a basic oxygen furnace trunnion area. The mill certificates list lot numbers, but the brick cartons on site show a different lot prefix, and the installation log records only the carton count. The project's quality plan requires full material verification before any brick is laid. Which action BEST satisfies the verification requirement?
    A. Install the bricks because the carton count matches the delivery note.
    B. Reconcile each carton lot prefix against the certificates and quarantine any cartons that cannot be matched before installation.
    C. Record the mismatch as a note in the installation log and continue laying the bricks.
    D. Request a new mill certificate from the supplier after the lining has been completed.

These are 11 of the 85 questions in the full API-936 pack.

Get All 85 Questions

Get all 85 questions & answers

717 Satisfied customers
94.2% Pass rate feedback
84.4% Said questions matched
97% Found material helpful

Full access options for API API-936

Self-study

PDF Version

$40.00 $20.00
  • 85 actual exam questions
  • Compatible with all devices
  • Printable PDF format
  • No download limits
  • 90 days free updates
  • 24/7 customer support

Exam simulation

Online Practice Test

$50.00 $25.00
  • 85 actual exam questions
  • Actual exam environment
  • 90 days free updates
  • Browser-based software
  • 24/7 customer support

100% Money Back Guarantee

Your success comes first

At DumpsProvider, we give you a 100% money back guarantee on all of our exam dumps. For us, your success is the #1 priority and we are more than confident that our exam material will help you pass the API-936 Exam (Refractory Personnel) on your very first attempt.

In a rare case, if you fail your exam, we will refund your amount without asking a single question.

100%

Security & Privacy

10000+

Satisfied Customers

24/7

Committed Service

100%

Money Back Guranteed