1 Question 1 Single choice Laboratory Testing Procedures
A QC technician is preparing test specimens from a batch of dense castable refractory to determine cold crushing strength (CCS) per the applicable test method. The specimens were cast in cube molds, cured for 24 hours at ambient temperature, and then demolded. The lab supervisor asks that the specimens be dried and tested immediately after demolding to save time on the reporting deadline for a customer qualification package. The specification requires CCS results to be reported on specimens that have been cured and dried according to the manufacturer's curing schedule, and the lab has a dryer that can hold the specimens at 110 C.
Which action is the BEST response to the supervisor's request?Correct Answer: CExplanationCold crushing strength is a property measured on specimens that have completed the prescribed curing and drying cycle; free water and incompletely set bond phases inflate or distort the result, so the test must follow the specified schedule. Testing immediately after demolding gives a non-representative value, which is why the answer keeps the specimens in the curing and drying sequence before crushing. Drying at 300 C is not the specified drying condition and can alter the microstructure of the sample. Reporting first and retesting later creates an invalid record in the qualification package and defeats the purpose of the requirement.
-
2 Question 2 Single choice Installation
A contractor is gunning a 230 mm thick monolithic lining on a cyclone wall. The gunite equipment uses a dry-mix hopper feeding a nozzle, with water added at the nozzle through a separate line. During the shift, the crew notices that the mix is slumping off the wall during build-up on the upwind side of the cyclone, while the downwind side shows rapid stiffening and occasional flash set at the nozzle tip. The ambient temperature has risen sharply after noon, and the water supply line is fed from an elevated tank that sits in direct sun.
Which corrective action BEST addresses the observed behavior?Correct Answer: AExplanationRising ambient and water temperature accelerates hydration and can cause flash set, while the inconsistent slump and stiffening point to water and set-time control rather than pressure or accelerator dosing. Managing the water temperature at its source and adjusting water quantity and set control per the manufacturer's recommendations addresses the root variable. Increasing air pressure does not fix a mix that is already setting too fast and can increase rebound and dusting. Reducing water on its own may stiffen the mix further and worsen placement, and water purity is not the cause of the observed behavior. Extra accelerator increases the risk of flash set in hot conditions.
-
3 Question 3 Multiple choice Inspection
An inspector is reviewing a completed refractory lining in an aluminum remelt furnace hearth. The repair records show that a 0.9 m section of hot face was removed and re-cast after a crack was detected. The contractor asserts the repair is acceptable because the new section sounded solid under hammer test. The specification requires repairs to be verified against bonding and integrity criteria before acceptance and to be traceable to the installation records. The inspector must confirm the repair with methods beyond the hammer test.
Which TWO actions should the inspector require to verify the repair? (Choose two.)Correct Answer: A, EExplanationTraceability to the installation records and nondestructive verification against adjacent lining are the two checks that establish a repair is acceptable without destructive removal. Sonic or similar tests show whether the new cast is bonded and free of voids where the hammer test alone may be inconclusive, and material records confirm the correct product was used. Hammer testing by itself cannot prove bonding, so accepting on sound alone is inadequate. Full removal is disproportionate and unnecessary when a nondestructive method is available. Curing verification matters, but it is a post-installation control rather than the direct test of the repair's bond and material identity that the question asks for.
-
4 Question 4 Single choice Post-Installation
A new castable hearth for an aluminum holding furnace is being prepared for first heat. The following post-installation tasks must each be matched to the control it addresses:
1. Keeping the exposed surface moist for the initial set period
2. Applying a membrane curing compound to the exposed surface
3. Ramping the lining at the manufacturer's controlled heating rate
4. Placing thermocouples at the lining hot face and inside the cold face
Match each task to its purpose:
A) 1 - Water mist or covering; 2 - Membrane curing; 3 - Heatup schedule; 4 - Temperature monitoring
B) 1 - Heatup schedule; 2 - Water mist or covering; 3 - Membrane curing; 4 - Temperature monitoring
C) 1 - Membrane curing; 2 - Water mist or covering; 3 - Temperature monitoring; 4 - Heatup schedule
D) 1 - Water mist or covering; 2 - Temperature monitoring; 3 - Membrane curing; 4 - Heatup scheduleCorrect Answer: AExplanationWater mist or covering keeps the surface hydrated during the early set, which is the purpose of the initial sealing step. Membrane curing compound is applied to seal the exposed surface once the water-based set is underway and must be applied within its time limit. The controlled heatup schedule governs the ramp rate that protects the lining from steam spalling, and thermocouples placed at the hot face and cold face let the crew verify the lining is following that ramp. Option B swaps the purpose of the heatup schedule with the mist, which would leave the surface to dry out prematurely. Option C places monitoring after the ramp and assigns membrane curing to the first step, reversing the sequence. Option D misassigns the monitoring and the heatup controls.
-
5 Question 5 Dropdown Applicator and Material Qualification
A qualification mockup for a gunned monolithic lining is being built for a rotary kiln inlet. The specification requires that the mockup represent the production installation, including the wall geometry, anchor layout, and the substrate surface prepared the same way as the kiln shell. The mockup is built on a flat steel plate in the shop, and the installer proposes to use the shop mockup results to qualify the field installation without prepping any substrate surface. The mockup must also be built with the applicator and equipment that will be used in the field, and the ambient conditions recorded must match the field conditions the specification defines. Choose the correct value for each blank.
Choose the correct value for each blank.
Which combination of mockup and surface requirements is correct? Complete the statement: The mockup be built on a flat plate with no anchors, and the substrate surface be prepared to match the production surface condition.Correct Answer:Which combination of mockup and surface requirements is correct? Complete the statement: The mockup must not be built on a flat plate with no anchors, and the substrate surface must be prepared to match the production surface condition.
ExplanationA qualification mockup has to reproduce the production geometry, anchor layout, and substrate preparation, so a flat plate without anchors is not representative and the mockup must not be built that way. The substrate surface condition is part of what qualifies the installation, so it must match the production surface preparation. The shop results cannot be accepted as qualification for the field if the substrate was not prepared the same way. Option A and D both wrongly allow the mockup to skip the substrate requirement, and option C permits the non-representative plate construction, which the specification rules out.
-
6 Question 6 Single choice Installation
A refractory contractor is installing a cast monolithic lining with an integral steel anchor pattern in a shell that was grit-blasted two days before casting. The supplier data sheet states that the castable must be installed within a specified time after water addition, and the contractor has been mixing batches in a central mixer and transporting them in open buggies to the work face. The day is cool and humid, and the crew has been waiting for the scaffold to be moved, so the wait between mixing and placement has stretched to nearly the full working time. The site engineer notices that the first batches placed have begun to lose workability and are being re-tempered with extra water.
What is the MOST appropriate corrective measure?Correct Answer: CExplanationOnce castable has passed its working time, it has begun to set, and adding water to re-temper it reduces strength and changes the properly designed water ratio, so that material must be discarded. Limiting each mix to what can be placed within the working time, given the mixing-to-placement delay, stops the problem at source. Re-tempering with extra water is the tempting shortcut but it undermines the specified water addition and creates a weaker lining. A smaller mixer does not fix the transport and waiting delay that is driving the loss of workability. Reducing sampling would remove the evidence needed to qualify the pour and does nothing to address the material condition.
-
7 Question 7 Order list Laboratory Testing Procedures
A laboratory must determine the apparent porosity and bulk density of a set of fired refractory brick specimens for acceptance against a supplier certificate. The specimens have already been fired, cooled, and dimensioned to the required size. Place the following steps in the correct order for the density test: A) 2, 4, 3, 1, 5, 6 B) 4, 2, 3, 1, 5, 6 C) 2, 4, 1, 3, 5, 6 D) 4, 2, 1, 3, 6, 5 Drag the steps into the correct order.
Drag the steps into the correct order, or use the arrows.
- Dry the specimens to constant weight and record the dry weight.
- Calculate apparent porosity and bulk density from the recorded weights.
- Compare results to the acceptance criteria and document the outcome.
- Evacuate and saturate the specimens with water under vacuum.
- Immerse the saturated specimens and record the suspended weight.
- Weigh the saturated specimens in air after surface moisture is removed.
Correct Answer:- Dry the specimens to constant weight and record the dry weight.
- Evacuate and saturate the specimens with water under vacuum.
- Weigh the saturated specimens in air after surface moisture is removed.
- Immerse the saturated specimens and record the suspended weight.
- Calculate apparent porosity and bulk density from the recorded weights.
- Compare results to the acceptance criteria and document the outcome.
ExplanationThe dry weight must be established first by drying to constant weight, before any saturation begins, so the dry mass is the baseline. The specimens are then vacuum-saturated with water, which fills the open pores fully and reproducibly. Weighing in air after surface moisture is removed gives the saturated mass, and the suspended weight is taken after that, so the in-air step precedes the immersion step in the sequence. Calculating the porosity and density comes next, followed by comparing against the acceptance criteria and documenting the result. Option B begins with vacuum saturation before drying, which would make the baseline weight wrong. Option C places the suspended weight before the in-air saturated weight, which is the wrong order for the measurements. Option D reverses calculation and comparison, so the result is never checked against the criteria before recording.
-
8 Question 8 Single choice Applicator and Material Qualification
A contractor is qualifying a castable refractory for a 1,300 C reheat furnace roof. The manufacturer's data sheet gives a recommended water addition of 5.5 to 6.0 percent by weight, but the crew has been adding water by volume using a bucket, and the test panels show inconsistent flow values between batches. The project specification requires the qualification panels to represent production installation. Which action is the BEST first step to establish the optimal water content?
A. Increase the water addition to 7 percent to guarantee full flowability before casting the panels.
B. Weigh the water addition for each batch and run flow tests at several water contents within the manufacturer's range to select the optimum.
C. Accept the variation and cast the mockup panels using the average water volume recorded across the batches.
D. Replace the mixer with a high-shear unit and keep the existing water volume so the material homogenises more evenly.Correct Answer: DExplanationWater content for castables is controlled by weight against the manufacturer's range, and the optimum is found by testing flow at several water levels rather than assuming a single value. Measuring water by volume introduces error that will persist regardless of mixing. Adding water beyond the recommended range exceeds the limit that causes segregation, strength loss and porosity increase, so the 7 percent choice fails the manufacturer's constraint. Averaging volumes locks in the error, and a new mixer does not correct a water-dosing problem.
-
9 Question 9 Single choice Applicator and Material Qualification
A refractory installer must qualify a gunned monolithic lining for a rotary kiln hood. The specification requires the qualification mockup to be built under the same environmental and surface conditions as the working lining. The site is in a coastal area where the ambient relative humidity is 85 percent and the steel shell has been left exposed to rain overnight. The foreman proposes casting the mockup on a clean dry panel in the shop at 22 C to save time. What should the qualification mockup most appropriately include?
A. A shop-built panel on a dry steel plate to prove the material's laboratory properties.
B. A mockup on a surface prepared to the same cleanliness and dryness as the shell, cured under site humidity and temperature.
C. A panel prepared with an additional bonding agent to offset the moisture on the shell.
D. A panel built at a higher temperature to accelerate the gun cure before testing.Correct Answer: DExplanationA qualification mockup has to reproduce the conditions the lining will actually experience, including substrate preparation and curing environment, otherwise its results do not predict field bond and cure behaviour. The shop panel omits the moisture and temperature influences that matter here. Adding bonding agent changes the system being qualified and is not an approved fix for a wet substrate. Accelerating cure at higher temperature also departs from the installed conditions and invalidates the qualification.
-
10 Question 10 Single choice Inspection
A hammer test is performed on a newly installed castable hot face in a ladle preheater. Sound, consistent ringing is recorded across most of the area, but a 1.2 m patch near a tuyere returns a dull, short response. The inspector is asked to decide whether the patch should be cored, sonically tested further or rejected. The project specification requires acceptance based on tested density and bond integrity, and the lining has already been dried out. Which step is the MOST appropriate next action?
A. Reject the entire patch immediately because a dull hammer response always indicates delamination.
B. Accept the patch because hammer response is only a qualitative indicator and cannot reveal defects.
C. Use a sonic test over the patch to map the response, then take core samples at the locations that indicate a weak zone.
D. Remove the lining and reinstall the patch without further testing to eliminate any doubt.Correct Answer: BExplanationHammer testing is a screening method, and a dull response indicates a possible void or delamination that needs confirmation rather than automatic rejection. Sonic mapping defines the extent of the anomaly across the area, and cores then verify the actual condition against acceptance criteria, which is how the specification requires decisions to be made. Accepting the patch ignores a valid screening result, and reinstalling without testing removes the evidence needed for the record.
-
11 Question 11 Single choice Inspection
An inspector is reviewing traceability records for a magnesia-carbon brick shipment used in a basic oxygen furnace trunnion area. The mill certificates list lot numbers, but the brick cartons on site show a different lot prefix, and the installation log records only the carton count. The project's quality plan requires full material verification before any brick is laid. Which action BEST satisfies the verification requirement?
A. Install the bricks because the carton count matches the delivery note.
B. Reconcile each carton lot prefix against the certificates and quarantine any cartons that cannot be matched before installation.
C. Record the mismatch as a note in the installation log and continue laying the bricks.
D. Request a new mill certificate from the supplier after the lining has been completed.Correct Answer: DExplanationMaterial verification and traceability require that each installed lot can be tied back to a certificate before it is used, so unmatched cartons must be segregated until resolved. A matching carton count does not prove the lot identity. Recording the mismatch while continuing installation makes the lining untraceable, and obtaining certificates after completion is too late to prevent non-conforming material from being placed.
These are 11 of the 85 questions in the full API-936 pack.
Get All 85 QuestionsGet all 85 questions & answers
Full access options for API API-936
Self-study
PDF Version
- 85 actual exam questions
- Compatible with all devices
- Printable PDF format
- No download limits
- 90 days free updates
- 24/7 customer support
Best value
Bundle Pack
- Discounted PDF + online access
- 85 actual exam questions
- Both PDF and online practice test
- Free 90 days updates
- No download or practice limits
- 24/7 customer support
Exam simulation
Online Practice Test
- 85 actual exam questions
- Actual exam environment
- 90 days free updates
- Browser-based software
- 24/7 customer support
100% Money Back Guarantee
Your success comes first
At DumpsProvider, we give you a 100% money back guarantee on all of our exam dumps. For us, your success is the #1 priority and we are more than confident that our exam material will help you pass the API-936 Exam (Refractory Personnel) on your very first attempt.
In a rare case, if you fail your exam, we will refund your amount without asking a single question.