Exam Information
Free practice questions with explanations
Scaled Agile SAFe-SASM Practice Questions
Answer a question to see the correct answer and the explanation, or click Show answer. Newest questions first.
- Questions
- 15
- Answered
- 0
- Correct
- 0
- Score
- -
-
1 Question 1 Single choice Applying SAFe Principles
A regional bank is moving a payments platform to SAFe. The ART has planned a Program Increment around a large new fraud-detection capability. Mid-PI, a regulator announces a reporting change that could alter the data model. Leadership asks the Release Train Engineer whether the team should freeze the design now to avoid rework. The program's budget is tight, and the team has already spent two sprints on exploratory spikes. Which response best applies SAFe principles?
Correct Answer: AExplanationSAFe's principle of assuming variability and preserving options argues for delaying irreversible design decisions until the most responsible moment, while keeping viable alternatives available. Keeping two candidate data models open lets the ART learn from the regulatory details without committing prematurely. Freezing the model early locks in a design that may be invalid, which is exactly the cost the principle warns against. Halting all work ignores the economic view and the value flow already in motion. Letting each team choose locally optimises subsystems at the expense of the whole system, which violates the system-thinking principle.
-
2 Question 2 Single choice Applying SAFe Principles
A product group has released a feature to a limited cohort of customers as a fast learning experiment. Telemetry shows low adoption in one segment, but the Product Management team wants to know whether to continue investing in the feature. The organisation measures success by economic outcomes rather than by output volume, and it must decide within the current PI whether to fund the next increment. Which action should the Scrum Master help the team take FIRST?
Correct Answer: BExplanationSAFe's economic view asks that investment decisions be based on the economic value of options, with cost of delay as a key input. Quantifying the cost of delay and expected value gives Product Management a defensible basis to continue or stop funding. Counting story points measures output, not economic outcome, which the stated scenario explicitly rules out as the success measure. Expanding the experiment to all customers risks broad exposure before the learning is understood. Reporting hours against the original budget is a cost-tracking view that does not evaluate whether the next increment is worth funding.
-
3 Question 3 Multiple choice Building High-Performing Teams
A Scrum Master coaches a newly formed Agile team whose members come from three previously siloed functions. Recent retrospectives show members deferring to the senior engineer, avoiding disagreement, and rarely raising impediments until they become crises. The team lead wants to build psychological safety and a shared commitment to the team's goals before the next PI. Which TWO actions are the most effective ways to build a collaborative, trusting environment? (Choose two.)
Correct Answer: A, CExplanationPsychological safety grows when norms explicitly invite dissent and treat impediments as improvement input, which is what the working agreement achieves. Structured retrospectives where people share mistakes and learning normalise candour and build trust. Making the senior engineer the sole decision owner reinforces the deference the team already shows and suppresses collaboration. Sprint-by-sprint rotation erodes expertise without building shared commitment. Public individual velocity tracking creates competition and fear, which works against the trust the lead is trying to build.
-
4 Question 4 Single choice Exploring Agile and Scrum Anti-Patterns
A Product Owner for a large ART consistently accepts new requests from several stakeholders and adds them to the team backlog during each sprint. Team members have started to complain that sprint goals change almost weekly, and the team has missed its last two commitments. The Product Owner argues that every request is important and that refusing them would hurt the business. The Scrum Master has been asked to identify the anti-pattern and recommend the most appropriate next step. Which response best addresses the root cause?
Correct Answer: DExplanationThe scenario describes the anti-pattern of a Product Owner who allows constant mid-sprint interruption, which undermines the sprint goal and the team's predictability. Coaching the Product Owner to consolidate requests into a prioritised backlog and protect the sprint goal addresses the cause rather than the symptom. Overtime hides the problem and cannot be sustained. A longer sprint does not fix a backlog that keeps being disrupted. Adding a project manager layers another intermediary onto the same flow problem and separates the Product Owner from prioritisation authority.
-
5 Question 5 Single choice Exploring the Scrum Master Role
A Scrum Master in a SAFe enterprise is asked to support a team that has been delivering well but is increasingly blocked by dependencies on another ART that uses a different planning cadence. The team's manager wants the Scrum Master to prioritise coordination with that other ART over internal team coaching. The Scrum Master knows the Release Train Engineer is already running a dependency review but is not yet aware of the specific blocking items. Which action should the Scrum Master take FIRST?
Correct Answer: CExplanationThe Scrum Master's role in SAFe is to facilitate team-level flow and to surface impediments to the appropriate coordinating role, here the Release Train Engineer who already runs the dependency review. Compiling the concrete blocking items from the team's board gives that process the specifics it needs. Stopping team coaching abandons a core responsibility. Negotiating commitments directly with another ART's Product Management overrides the coordination channels SAFe establishes. Rewriting another ART's cadence is outside the Scrum Master's authority and ignores the existing dependency mechanism.
-
6 Question 6 Drag and drop Facilitating Program Execution
An ART is preparing for its next PI Planning event. The Release Train Engineer must make sure the right inputs and artefacts are ready so that teams can plan effectively. Match each preparation activity to the artefact or outcome it primarily produces.
Drag each item onto its matching target. On a phone: tap an item, then tap a target.
Confirming which external dependencies must be resolved during the PIRanking the features and capabilities that the ART intends to deliver in the coming PIAgreeing on the business and technical objectives each team will commit toTeam iteration backlogProgram Increment objectivesPrioritised feature list in the program backlogProgram risk registerDependency map shared with participating teamsCorrect Answer:- Ranking the features and capabilities that the ART intends to deliver in the coming PI → Prioritised feature list in the program backlog
- Confirming which external dependencies must be resolved during the PI → Dependency map shared with participating teams
- Agreeing on the business and technical objectives each team will commit to → Program Increment objectives
ExplanationPre-planning preparation in SAFe centres on a prioritised program backlog of features that the ART will consider for the PI. Dependency identification produces a dependency map that teams review during planning. The objectives that teams commit to at the end of planning are captured as PI objectives. Team iteration backlogs are created by teams during planning and iteration planning, so they are not a pre-planning preparation artefact. The program risk register is maintained across the PI and is not the primary product of the listed preparation activities.
-
7 Question 7 Single choice Facilitating Program Execution
An ART completed its first PI, but the teams reported that many features were only partially finished at the end of the timebox, and the business could not release value. The Release Train Engineer wants to change the way the ART plans the next PI so that each increment delivers a working system with value that can be released on demand. Which change best meets this goal?
Correct Answer: CExplanationSAFe asks that each PI deliver a working, integrated system, and that features be sized and planned so they can be built, integrated, and validated within the increment. This makes value releasable on demand. Splitting into many small stories raises a completion count without guaranteeing integrated working value. Moving integration to a later phase reintroduces the delayed-value and integration risk the ART is trying to remove. Committing to more features dilutes focus and increases the likelihood of more partially finished work.
-
8 Question 8 Dropdown Improving Flow with Kanban and XP
A team building a Kanban board for its ART wants to visualise flow and limit work in progress so it can measure and improve delivery. The team has noticed that stories often sit in the review column for several days, and the board currently has no explicit limits. Complete the statements the Scrum Master uses to explain the board setup to the team.
Choose the correct value for each blank.
The team should add a work-in-progress limit to the column so that no more than a set number of items wait there at once, and should track to measure how long items take to move from start to finish.Correct Answer:The team should add a work-in-progress limit to the Review column so that no more than a set number of items wait there at once, and should track cycle time to measure how long items take to move from start to finish.
ExplanationA work-in-progress limit placed on the review column directly constrains the queue where items have been waiting, making bottlenecks visible and forcing the team to swarm on completion. Cycle time measures elapsed time from the start of work to completion, which is the flow metric that reveals whether the review delay is improving. Placing the limit on the backlog or on Done does not address the review queue, and sprint velocity and story points are output or estimation measures rather than flow metrics.
-
9 Question 9 Order list Improving Flow with Kanban and XP
A team wants to improve how it builds quality into its work, using practices drawn from XP. Its code frequently breaks after integration, and defects are found days after they are introduced. The Scrum Master proposes a sequence of changes. Arrange the steps in the correct order they should be performed.
Drag the steps into the correct order, or use the arrows.
- Refactor the code to remove duplication while keeping all tests green
- Write an automated test that captures the defect before changing the code
- Make the smallest code change that makes the new test pass
- Run the full automated test suite on every integration to catch regressions quickly
Correct Answer:- Write an automated test that captures the defect before changing the code
- Make the smallest code change that makes the new test pass
- Run the full automated test suite on every integration to catch regressions quickly
- Refactor the code to remove duplication while keeping all tests green
ExplanationThe described practice is test-driven development: the team first writes a failing automated test that captures the defect, then makes the smallest change that passes it, then refactors while tests stay green. Running the full automated suite on each integration is the continuous integration step that surfaces regressions quickly. Running the suite before the failing test exists would not isolate the defect, and refactoring before the test passes would make it unclear whether behaviour was preserved.
-
10 Question 10 Single choice Improving Flow with Kanban and XP
An ART's system team and architects are concerned that teams are building components with interfaces that do not match what the operations group needs for deployment. Deployment failures have increased, and the teams say they are waiting on architectural decisions that arrive late. The Release Train Engineer wants to improve collaboration so that alignment is maintained without creating a bottleneck. Which approach is most appropriate?
Correct Answer: AExplanationIncluding architects, the system team, and operations in planning and synchronisation events brings interface and deployment needs into the flow early, without making central review a bottleneck. Reviewing every story individually recreates the late-decision delays the teams are complaining about. Handing operations requirements as a fixed specification at the end of the PI comes too late to influence the work already built. Removing the system team discards the coordinating capability that the ART depends on to keep components integrated.
-
11 Question 11 Single choice Improving Program Performance
An ART completed its PI, and the inspect and adapt event identified several problems, including frequent integration failures and unclear ownership of the shared test environment. Leadership wants the problems solved quickly, and several participants propose different fixes. The Scrum Master must recommend how to move from identifying the problems to fixing them in a structured way. Which action is the best next step?
Correct Answer: AExplanationIn SAFe, the inspect and adapt process is followed by problem-solving workshops that drive root-cause analysis and the creation of improvement actions, which are tracked as improvement backlog items. Assigning problems to whoever reported them skips the analysis and may fix symptoms. Having the Release Train Engineer decide each fix bypasses the collaborative problem solving that SAFe uses. Adding another PI Planning event is disruptive and mismatches the cadence, since improvement work is not a replacement for regular planning.
-
12 Question 12 Drag and drop Building High-Performing Teams
A Scrum Master is helping an ART grow the capabilities of its teams and sustain continuous improvement. Several practices are proposed, and each should be matched to the outcome it is intended to produce. Match each practice to its primary outcome.
Drag each item onto its matching target. On a phone: tap an item, then tap a target.
Pairing a senior engineer with a newer member on a shared story over several sprintsCapturing improvement ideas from retrospectives as prioritised items for the teamRecording skill gaps identified by team members and planning targeted learning for themTeam skill development planRelease planImprovement backlogProgram Increment objectivesTransfer of practical expertise within the teamCorrect Answer:- Recording skill gaps identified by team members and planning targeted learning for them → Team skill development plan
- Capturing improvement ideas from retrospectives as prioritised items for the team → Improvement backlog
- Pairing a senior engineer with a newer member on a shared story over several sprints → Transfer of practical expertise within the team
ExplanationSkill gaps and learning goals are captured in a team skill development plan that guides growth. Improvement ideas from retrospectives belong in the improvement backlog so they are prioritised and acted on. Pairing a senior and a newer member transfers expertise directly. Program Increment objectives and the release plan are planning artefacts for delivering value and do not primarily serve team capability growth or the improvement backlog.
-
13 Question 13 Multiple choice Improving Program Performance
An ART's inspect and adapt workshop reveals that release readiness is delayed because the teams do not have a shared definition of done for system-level integration, and each team has interpreted the criteria differently. Leadership asks the Scrum Master to recommend actions that will improve program performance over the next PI without adding a heavy approval layer. Which TWO actions best address the root cause and support sustained improvement? (Choose two.)
Correct Answer: C, DExplanationA shared, agreed definition of done for integration addresses the root cause, which is inconsistent interpretation across teams, and tracking it as an improvement item keeps it visible. Adding measurable indicators to inspect and adapt lets the ART see whether the criteria are being met and act on the trend. A central approval board adds the heavy approval layer leadership asked to avoid. Reducing integration tests weakens quality rather than clarifying criteria. Keeping separate definitions of done perpetuates the inconsistency that caused the release delay.
-
14 Question 14 Single choice Applying SAFe Principles
A retail company is planning a new digital checkout capability. The Product Management team wants to fix the schedule and budget up front and to commit to a single detailed solution before development starts, citing governance requirements. The ART's architects believe the best solution is still unclear, and the company faces a six-month window in which the market opportunity is valid. The Scrum Master is asked to advise on the approach. Which recommendation best balances governance with the need to learn quickly?
Correct Answer: BExplanationSAFe favours building incrementally with fast learning cycles and basing milestones on working systems, which lets the organisation learn while keeping governance through funding gates linked to demonstrated results. Fixing a single detailed solution up front ignores the unresolved architecture and the six-month window. Delaying development until full documentation wastes the market window and conflicts with the goal of early learning. Splitting the budget equally across all options spreads investment without discovering which option actually delivers economic value.
-
15 Question 15 Dropdown Exploring the Scrum Master Role
A Scrum Master is explaining the basic structure of SAFe to a new team member, who is confused about how the team relates to larger levels of the framework. The Scrum Master wants to show how the team connects to the program and portfolio levels, and wants the explanation to be accurate. Complete the statements the Scrum Master uses.
Choose the correct value for each blank.
A team belongs to an Agile Release Train, which is the long-lived team-of-teams that delivers value through a cadence, and the Agile Release Train is coordinated at the program level by the .Correct Answer:A team belongs to an Agile Release Train, which is the long-lived team-of-teams that delivers value through a Program Increment cadence, and the Agile Release Train is coordinated at the program level by the Release Train Engineer.
ExplanationAn Agile Release Train is the long-lived team of Agile teams that delivers value on a shared Program Increment cadence, which spans several iterations. The Release Train Engineer is the role that facilitates and coordinates the ART, including PI Planning and program-level flow. A Product Owner works at the team or product level, a Scrum Master coaches an individual team, and a Solution Architect guides technical decisions rather than coordinating the train.
These are 15 of the 60 questions in the full SAFe-SASM pack.
Get All 60 QuestionsGet all 60 questions & answers
Full access options for Scaled Agile SAFe-SASM
Self-study
PDF Version
- 60 actual exam questions
- Compatible with all devices
- Printable PDF format
- No download limits
- 90 days free updates
- 24/7 customer support
Best value
Bundle Pack
- Discounted PDF + online access
- 60 actual exam questions
- Both PDF and online practice test
- Free 90 days updates
- No download or practice limits
- 24/7 customer support
Exam simulation
Online Practice Test
- 60 actual exam questions
- Actual exam environment
- 90 days free updates
- Browser-based software
- 24/7 customer support
100% Money Back Guarantee
Your success comes first
At DumpsProvider, we give you a 100% money back guarantee on all of our exam dumps. For us, your success is the #1 priority and we are more than confident that our exam material will help you pass the SAFe-SASM Exam (SAFe Advanced Scrum Master) on your very first attempt.
In a rare case, if you fail your exam, we will refund your amount without asking a single question.