1 Question 1 Single choice Building Plan Review
A plan reviewer is evaluating a proposed three-story office building that will also contain a ground-floor restaurant seating 180 occupants. The architect lists the entire structure as a single Business occupancy to minimize the number of required fire-resistance-rated separations. The restaurant kitchen exhaust and cooking appliances are shown on the mechanical sheets, and the restaurant floor area is about 4,500 square feet. The jurisdiction adopts the model code and does not allow reliance on the architect's occupancy argument without supporting analysis. Which action should the plan reviewer take FIRST?
Correct Answer: CExplanationOccupancy classification must be verified before construction type, separations, and suppression can be judged. A restaurant with 180 occupants is an assembly use in its own right, and the model code's accessory-use allowances are not met simply because a tenant space is small. Requiring the architect to classify the restaurant separately, with the separation and sprinkler consequences, addresses the root issue first. Approving the Business classification on a percentage argument ignores that the accessory-use rules turn on the nature of the use and the occupant load, not only the floor area. A fire flow test is a site-level step and does not resolve classification. Sprinkler spacing under NFPA 13 is a later design check and cannot be reviewed until the occupancy and protection requirements have been set.
-
2 Question 2 Single choice Site Plan Review
A developer proposes a 40-unit residential complex on a site with a single cul-de-sac entrance. The dead-end fire apparatus access road will exceed 300 feet from the nearest public road to the farthest building entry. The site plan shows a 20-foot-wide drive, and the local amendments require a turnaround for dead-end roads over 150 feet. The developer asks that the turnaround be omitted because the trash truck already turns around in the cul-de-sac. The fire marshal's office has no approved alternative means of protection on file for this site. What should the plan reviewer require?
Correct Answer: CExplanationThe dead-end length exceeds the local threshold, so an apparatus turnaround is required unless an approved alternative is documented. Refy-ing to a garbage truck's turning path does not demonstrate that fire apparatus with its own geometry can turn around. Widening the drive does not remove the turnaround requirement. Sprinklers may be accepted as an alternative only through an approved, documented modification process, and the reviewer cannot unilaterally drop the access requirement on the basis of the building protection alone. The correct response is to require a compliant turnaround or a formally approved alternative.
-
3 Question 3 Single choice Fire Protection and Life Safety Systems Review
A plan reviewer is checking a submitted sprinkler layout for a light-hazard office floor. The design sheet shows standard upright sprinklers with a 15-foot spacing between heads along the branch lines, and the ceiling is a 9-foot suspended acoustical grid with recessed lighting. The reviewer's checklist includes spacing, obstruction, and the relationship between the sprinkler deflector and the ceiling plane. The submitted calculations are based on an inflow rate for the entire floor area. Which deficiency must the reviewer document as the primary concern?
Correct Answer: BExplanationHydraulic calculations must be based on the most hydraulically remote design area required by the applicable sprinkler standard, not the full floor area, so the demand shown cannot be verified. The 15-foot spacing is within the permitted range for light hazard under NFPA 13, so it is not a deficiency. A 9-foot ceiling does not by itself require higher density. Recessed lighting is acceptable as long as clearance and obstruction rules are met, and an absolute prohibition does not exist. The calculation basis is the substantive deficiency to document.
-
4 Question 4 Single choice General Knowledge
During a deposition arising from a lawsuit over a high-rise apartment fire, the plaintiff's attorney asks a fire plan examiner whether the approved plans showed compliance with the fire code. The examiner recalls that the plans were approved under an earlier edition of the code adopted by the jurisdiction at the time of permitting. The current edition has since been adopted with stricter requirements for corridor fire-resistance ratings. The attorney asks the examiner to state whether the building 'met the code today.' The examiner's department has asked to be consulted before any opinion is given outside the review record. What is the BEST response?
Correct Answer: CExplanationPlan review compliance is judged against the code edition that governed the permit, so the examiner must testify to what the record shows and avoid expanding beyond it. Stating that the building met today's code conflates two editions. Refusing all testimony is not appropriate, because examiners do give factual testimony about their reviews. Offering personal opinions from memory risks inaccurate testimony and contradicts the requirement to collaborate with counsel and the department. Explaining the governing edition and routing the comparison to counsel and the department keeps the testimony accurate and professional.
-
5 Question 5 Single choice Administrative
A plan reviewer completes a review of a commercial kitchen remodel and identifies four deficiencies: a missing hood suppression system detail, an unmarked exit sign location, an incorrect occupant load calculation, and an absent fire-rated enclosure for a shaft. The jurisdiction requires that corrections be communicated in a single written report that cites the specific code section for each deficiency and that the submitter be given an opportunity to resubmit. The submitter has asked for the list to be sent by phone to save time. Which action should the reviewer take?
Correct Answer: BExplanationJurisdictional policy requires a written correction report that cites the code section for each deficiency, and that record supports resubmittal and any later dispute. A phone call does not create the required documentation, even if noted internally. Withholding deficiencies or deferring them to inspection undermines the review and the record. Approving with conditions on items that are required to be corrected before approval is not the same as documenting deficiencies, and it bypasses the required resubmittal step.
-
6 Question 6 Single choice Fire Protection and Life Safety Systems Review
A fire plan examiner is reviewing a pre-engineered clean-agent suppression system for a telecommunications room. The submitted plans show the agent cylinders located inside the protected room, the discharge nozzles positioned 6 feet above the floor, and a manual release station mounted outside the room at the exit door. The manufacturer's listing specifies that the cylinders must be located outside the hazard or in an approved enclosure, and that the system must include a pre-discharge alarm with a delay before release. The plans do not show the delay device. Which deficiency is the reviewer's FIRST and most significant finding?
Correct Answer: DExplanationPre-engineered systems must be installed as listed, and the listing limits cylinder placement to outside the hazard or an approved enclosure, so cylinders inside the room are the primary deficiency. Nozzle height is governed by the listed design and is not a stand-alone violation here. A manual release station at the exit door is normal placement and does not require a 10-foot setback. Missing agent manufacturer information is an administrative gap, not the most significant life-safety concern. The delay device omission is also real, but the cylinder placement is the more fundamental listing conflict.
-
7 Question 7 Drag and drop Site Plan Review
A plan reviewer is evaluating a proposed 180,000-square-foot warehouse with a sprinkler system and a 12-inch private fire service main. The site plan shows the hydrants placed along the south property line only, and the fire flow test data is 2,200 gpm at 20 psi residual from a hydrant 350 feet from the building's east wall. Match each requirement to the review action that addresses it.
Drag each item onto its matching target. On a phone: tap an item, then tap a target.
Hydrant location relative to the east wallHydrant spacing for a required fire flow of 3,000 gpmFire flow test data showing 2,200 gpm availableConfirm the warehouse occupancy classification is Storage and not BusinessConfirm the test hydrant's distance and location is representative of the building's supply pointRequire a second turnaround at the south access roadVerify hydrant distances along approved access so each building face is within the required hydrant spacingCompare available flow to required fire flow and require a corrected water supply if it is insufficientCorrect Answer:- Hydrant spacing for a required fire flow of 3,000 gpm → Verify hydrant distances along approved access so each building face is within the required hydrant spacing
- Fire flow test data showing 2,200 gpm available → Compare available flow to required fire flow and require a corrected water supply if it is insufficient
- Hydrant location relative to the east wall → Confirm the test hydrant's distance and location is representative of the building's supply point
ExplanationHydrant spacing is checked against the required fire flow and the building's frontage on approved access, so the reviewer compares distances to requirements. Available fire flow from the test must be compared to the required fire flow, and insufficiency requires a corrected supply. The test hydrant's location must be judged for whether it reflects the supply serving the building, since a test point far from the building can misrepresent available flow. The occupancy and turnaround options are real review topics but do not match these three requirements.
-
8 Question 8 Drag and drop Building Plan Review
A plan reviewer is evaluating a proposed four-story residential building of Type VA construction with a sprinkler system. The architect's drawings show the building height and story count, and the structural notes list combustible wood framing. The reviewer must confirm that each characteristic aligns with the construction type and the permitted height and area. Match each design characteristic to the review check that verifies it.
Drag each item onto its matching target. On a phone: tap an item, then tap a target.
Total building area shown on the floor plansNumber of stories shown on the elevation drawingsStructural notes specifying combustible wood framingConfirm the egress width required for the occupant load per floorCompare the story count to the limit for the stated construction type and occupancyConfirm the framing materials meet the fire-resistance rating required for the stated construction typeVerify the fire alarm notification appliance spacing on each floorCheck area against the allowable area for the construction type with sprinkler increases appliedCorrect Answer:- Number of stories shown on the elevation drawings → Compare the story count to the limit for the stated construction type and occupancy
- Structural notes specifying combustible wood framing → Confirm the framing materials meet the fire-resistance rating required for the stated construction type
- Total building area shown on the floor plans → Check area against the allowable area for the construction type with sprinkler increases applied
ExplanationStory count is compared against the allowable height limit for the construction type and occupancy, since height limits are tied to construction type. Framing materials must meet the fire-resistance ratings the construction type requires, which is a material-verification check. Total building area is compared to the allowable area, including any sprinkler increases, which is a separate check from height. The alarm and egress items are real checks but do not verify the construction characteristics listed.
-
9 Question 9 Order list Fire Protection and Life Safety Systems Review
A fire plan examiner receives a submission for a new three-story mixed-use building with a standpipe system and a fire pump. The reviewer must evaluate the standpipe and pump design before approval and document any deficiencies. Arrange the steps in the order they must be performed.
Drag the steps into the correct order, or use the arrows.
- Document each deficiency with the applicable code section and return it to the submitter for correction
- Compare the standpipe pressure and flow requirements against the hydraulic calculations submitted for the system
- Confirm the fire pump suction supply and the flow test data are sufficient for the calculated demand
- Verify the standpipe riser locations and hose connection positions against the required access and stair locations
Correct Answer:- Confirm the fire pump suction supply and the flow test data are sufficient for the calculated demand
- Verify the standpipe riser locations and hose connection positions against the required access and stair locations
- Compare the standpipe pressure and flow requirements against the hydraulic calculations submitted for the system
- Document each deficiency with the applicable code section and return it to the submitter for correction
ExplanationThe fire pump supply and flow data must be confirmed first because the hydraulic demand depends on available water. Standpipe riser and connection locations are then checked against the access and stair requirements, since the pressure and flow analysis depends on the layout. Hydraulic calculations are compared against the verified layout and supply. Deficiencies are documented and returned last, after all checks are complete. Reordering any of the first three steps would evaluate the calculations before their inputs are trustworthy.
-
10 Question 10 Multiple choice General Knowledge
A fire plan examiner is asked to determine which codes and standards apply to a proposed hospital wing that includes a smoke control system, a generator-backed emergency power system, and sprinkler protection in patient areas. The jurisdiction has adopted the model codes and local amendments. Which TWO actions best ensure that the correct references are made in the review findings? (Choose two.)
Correct Answer: C, DExplanationFindings must cite the edition the jurisdiction actually adopted, and local amendments can change the referenced requirement, so the adopted edition with amendments is the defensible reference. Citing the section that governs the specific system, rather than a general occupancy chapter, makes the finding precise and actionable. Using the newest edition regardless of adoption is incorrect because enforcement follows the adopted code. The sprinkler standard does not govern smoke control or emergency power. Manufacturer manuals cannot replace the adopted code requirements.
-
11 Question 11 Dropdown Site Plan Review
A plan reviewer is checking a fire flow requirement for a proposed 60,000-square-foot Type IIB storage building with automatic sprinklers. The jurisdiction's fire flow table lists the required flow based on the building's area and construction, and the reviewer records the requirement and the test result in the review notes. Complete the review note by selecting the correct value for each blank.
Choose the correct value for each blank.
Required fire flow: gpm. Available flow from the hydrant test: gpm. Result: the available flow the required fire flow.Correct Answer:Required fire flow: 4,500 gpm. Available flow from the hydrant test: 2,750 gpm. Result: the available flow does not meet the required fire flow.
ExplanationThe required fire flow for this area and construction is 4,500 gpm, so the reviewer must record that number. The test result of 2,750 gpm falls short of the requirement, so the review must state that available flow does not meet the required flow. The 3,000 and 5,000 options are not the values given for the test, and the 'meets' and 'exceeds' options would misstate the result. The reviewer must require a corrected water supply before approval.
-
12 Question 12 Dropdown Building Plan Review
A plan reviewer is verifying the occupancy classification of a proposed building that will house a daycare for 60 children on the ground floor and offices above. The architect labels the whole building Business occupancy. The reviewer records the correct classification and the reason for it in the review notes. Complete the note by selecting the correct value for each blank.
Choose the correct value for each blank.
Ground floor occupancy: . Reason: a daycare with more than persons is classified as use under the model code.Correct Answer:Ground floor occupancy: Day care. Reason: a daycare with more than 5 persons is classified as Institutional use under the model code.
ExplanationThe ground floor must be classified as a day care occupancy, and a day care serving more than five persons is governed as an Institutional-type use under the model code, so classifying the whole building as Business is wrong. The threshold of five persons separates a day care from an accessory or small use that might be treated differently. Business, Storage, and Mercantile do not match the use, and the reviewer must correct the classification before reviewing the separations.
These are 12 of the 100 questions in the full CFPE pack.
Get All 100 QuestionsGet all 100 questions & answers
Full access options for NFPA CFPE
Self-study
PDF Version
- 100 actual exam questions
- Compatible with all devices
- Printable PDF format
- No download limits
- 90 days free updates
- 24/7 customer support
Best value
Bundle Pack
- Discounted PDF + online access
- 100 actual exam questions
- Both PDF and online practice test
- Free 90 days updates
- No download or practice limits
- 24/7 customer support
Exam simulation
Online Practice Test
- 100 actual exam questions
- Actual exam environment
- 90 days free updates
- Browser-based software
- 24/7 customer support
100% Money Back Guarantee
Your success comes first
At DumpsProvider, we give you a 100% money back guarantee on all of our exam dumps. For us, your success is the #1 priority and we are more than confident that our exam material will help you pass the CFPE Exam (Certified Fire Plan Examiner) on your very first attempt.
In a rare case, if you fail your exam, we will refund your amount without asking a single question.