Exam Information
Free practice questions with explanations
IBM C1000-132 Practice Questions
Answer a question to see the correct answer and the explanation, or click Show answer. Newest questions first.
- Questions
- 14
- Answered
- 0
- Correct
- 0
- Score
- -
-
1 Question 1 Single choice Asset & Inventory Management Confiuration
A utility company manages 4,000 pumps across three sites. Each pump's runtime hours must be captured daily from the SCADA historian and used to trigger preventive maintenance based on usage rather than calendar time. The company wants the readings to be recorded against each asset without creating a separate record for every reading, and the data must be available for trend analysis. Which configuration best meets these requirements?
Correct Answer: DExplanationMeters are the Maximo construct for usage-based measurement: a meter is defined once, associated with assets, and its readings are stored as meter readings that can drive usage-based PMs and be trended. Recording readings as work log text prevents them from driving PM frequency or being analysed numerically. A meter group at site level aggregates meters rather than capturing per-pump readings, which loses the per-asset data required. Failure codes classify failures after they occur and should not be used to store routine operating measurements, so logging a failure report daily misuses the structure and pollutes failure history.
-
2 Question 2 Single choice Configure service Management
A facilities help desk receives service requests about lighting, HVAC and plumbing across two campuses. Management wants requesters to pick a category and sub-category, and the system must escalate any request not acknowledged within four business hours to the campus supervisor. Requests from the executive floor must be tracked against a stricter response target than other requests, without creating duplicate categories. Which configuration best satisfies these requirements?
Correct Answer: AExplanationService Request Categories, sub-categories and issues provide the classification requesters select, while SLAs with acknowledgement targets and escalations handle timing and notification, and SLA scope can differ for the executive floor without duplicating classification. Creating separate categories for the executive floor duplicates classification and conflates location with service type. Making every request escalate immediately on creation ignores the four-hour acknowledgement requirement. Bypassing the SLA for executive requests contradicts the requirement to apply a stricter target to them.
-
3 Question 3 Multiple choice Configure Work Safety
A chemical plant must ensure that contractors entering a confined-space area are covered by a safety plan before work orders begin. Plans must be reusable across similar work orders, and an auditor requires evidence that the plan was applied to the specific work order rather than merely existing in the library. Which TWO actions together meet these requirements? (Choose two.)
Correct Answer: B, EExplanationA safety plan must first be created as a reusable record with its precautions, then explicitly applied to the work order so the link is system-held and auditable per work order. Attaching the plan to an asset makes it visible but does not evidence application to a particular work order. Typing the plan number in the description is unverifiable and not a link. A job plan containing safety tasks is a different construct and does not create a safety plan application record.
-
4 Question 4 Order list Financial Configuration
A manufacturer is setting up a new organization in Maximo Manage that must track asset costs using straight-line depreciation over ten years, with budgets monitored against a new chart of accounts. Arrange the steps in the correct order.
Drag the steps into the correct order, or use the arrows.
- Create the budget and enable budget monitoring for the chart of accounts values.
- Define the asset depreciation schedule referencing the straight-line method and ten-year life.
- Assign depreciation schedules to the asset records or asset classifications.
- Define the chart of accounts segments and values for the new organization.
- Configure the organization's financial options and select the chart of accounts.
Correct Answer:- Define the chart of accounts segments and values for the new organization.
- Configure the organization's financial options and select the chart of accounts.
- Define the asset depreciation schedule referencing the straight-line method and ten-year life.
- Create the budget and enable budget monitoring for the chart of accounts values.
- Assign depreciation schedules to the asset records or asset classifications.
ExplanationThe chart of accounts must exist before the organization's financial options can reference it, and the financial options must be in place before budget monitoring and depreciation can be tied to accounting values. Depreciation schedules are defined as reusable schedules before they can be assigned to assets, and budgets must reference valid accounting values already created. Placing the depreciation schedule before the chart of accounts or the financial options would reference objects that do not yet exist.
-
5 Question 5 Drag and drop Asset & Inventory Management Confiuration
A warehouse supervisor needs to support three inventory needs at a distribution centre: keeping spare bearings separated by physical location, tracking the same bearing type stocked across two sites, and defining a catalogue entry that is shared across all sites before any stock is held. Match each requirement to the Maximo Manage object that meets it.
Drag each item onto its matching target. On a phone: tap an item, then tap a target.
Per-site quantity and balance of the bearing part held in a storeroomPhysical location where spare bearings are held and countedShared catalogue definition of the bearing part used at every siteMeter groupInventory recordStoreroom locationFailure classItem master recordCorrect Answer:- Physical location where spare bearings are held and counted → Storeroom location
- Shared catalogue definition of the bearing part used at every site → Item master record
- Per-site quantity and balance of the bearing part held in a storeroom → Inventory record
ExplanationThe item master holds the part definition used across sites, while the inventory record tracks quantities and balances for that item within a specific storeroom and site. Storeroom locations represent the physical places where stock is kept. Meter groups aggregate usage meters and failure classes organise failure codes, so neither relates to stock holding or catalogue definition.
-
6 Question 6 Single choice Financial Configuration
A university maintains a chart of accounts that distinguishes capital and operating expenses. Its finance team reports that depreciation postings for newly acquired laboratory equipment are being recorded against the wrong expense account. The equipment records already show the correct asset classification, and the depreciation schedule is correct. Which location should the administrator review FIRST to resolve the posting problem?
Correct Answer: CExplanationSince the depreciation schedule and asset classification are confirmed correct, the account postings are governed by the organization's financial options and the default chart of accounts values they reference. Reviewing the depreciation schedule again would repeat work already verified as correct. Item master spare parts do not drive depreciation expense posting for the equipment asset. Budget thresholds affect alerts rather than which expense account receives depreciation postings.
-
7 Question 7 Dropdown Platform Configuration
A multi-site manufacturer must ensure that supervisors in each plant can only view and edit work orders for their own site, and that the security group membership is managed centrally. An administrator is configuring the security group for the Plant B supervisors. Select the correct value for each blank in the configuration statement.
Choose the correct value for each blank.
In the Security Groups application, create the group PLANTB_SUP, then set the Site restriction to and assign the group to users through the application. Finally, grant the group access to the Work Order application with the permission.Correct Answer:In the Security Groups application, create the group PLANTB_SUP, then set the Site restriction to Plant B and assign the group to users through the Users application. Finally, grant the group access to the Work Order application with the Modify permission.
ExplanationMaximo restricts data visibility by assigning site access to a security group, so the Plant B site is the correct restriction for the Plant B supervisors, while assignment of users to groups occurs through the Users application. Granting Modify permission allows editing as well as viewing. Organization would widen access beyond the single plant, and Global does not apply a site restriction. Person and Labor are records describing workers rather than user accounts, and Crews relate to scheduling rather than security membership. Read only would block the required editing, and Restricted is not a permission level for applications.
-
8 Question 8 Single choice Maximo Application Suite Overview
A water utility is evaluating a Maximo Application Suite deployment. Its operations team wants to create asset and work order records directly from the Health application when an equipment health score drops, and to view the resulting work orders from Health without signing in to Manage separately. The IT lead insists that licensing be planned around actual user roles rather than the number of applications used. Which statement best describes how these requirements are met?
Correct Answer: AExplanationWithin Maximo Application Suite, components share the platform session so that a user moving from Health into Manage can create and view records without re-authenticating, and licensing is determined by the user type accessing each application. A standalone Health database would prevent cross-application record creation. Separate sign-in per application contradicts the shared platform model, and charging per installed application ignores the user-based requirement. Health being read-only is incorrect, since it can create records in Manage.
-
9 Question 9 Multiple choice Work Management & Planning
A maintenance team maintains a conveyor line whose PM tasks vary according to the product type running on the line, requiring different lubrication and inspection steps for each. The team wants to avoid maintaining several near-identical job plans and must ensure the correct tasks appear on each generated work order. Which TWO approaches meet these requirements? (Choose two.)
Correct Answer: C, EExplanationDynamic job plans allow tasks to be included or excluded based on conditions such as product type, so a single job plan can serve every variant, and a master PM referencing that job plan produces work orders carrying the applicable tasks. Maintaining separate plans and copying tasks manually is the maintenance burden the team wants to avoid. Routes list tasks in sequence without conditional applicability. Relying on technicians to skip tasks is error-prone and does not ensure correct task content.
-
10 Question 10 Single choice Procurement & Contract Management
A hospital's procurement team issues purchase orders against a contract that has a not-to-exceed value and a defined expiry date. Several POs were recently approved after the contract expiry date, causing finance to question the validity of the spend. The contract itself was entered correctly with the right vendor and value. Which action is the MOST appropriate to prevent purchase orders being issued against expired contracts?
Correct Answer: CExplanationA contract governs purchasing only within its effective and expiry dates, so the correct control is to ensure POs reference a contract active on the PO date and to manage contract status as it expires. Removing the expiry date removes the control entirely and would worsen the governance problem. Creating a new contract per PO defeats contract-based purchasing and the not-to-exceed control. Deactivating the vendor blocks all purchasing from that supplier, which goes beyond the requirement and disrupts other valid contracts.
-
11 Question 11 Drag and drop Platform Configuration
A logistics company is configuring Maximo Manage integrations and the scheduler for its depots. It needs to synchronise inventory transactions to an external ERP in near-real time, perform complex data validation that the standard application cannot express, and share labour and crew calendars with the scheduling team. Match each requirement to the configuration approach that best meets it.
Drag each item onto its matching target. On a phone: tap an item, then tap a target.
Labour and crew availability used by the schedulerNear-real-time synchronisation of inventory transactions to an external ERPComplex validation logic that standard field rules cannot expressDatabase Configuration domain changeCalendars and shifts linked to labour and crewsSecurity group site restrictionPublish channel integration endpointAutomation script on the objectCorrect Answer:- Near-real-time synchronisation of inventory transactions to an external ERP → Publish channel integration endpoint
- Complex validation logic that standard field rules cannot express → Automation script on the object
- Labour and crew availability used by the scheduler → Calendars and shifts linked to labour and crews
ExplanationA publish channel integration endpoint delivers object changes to external systems as they occur, which supports near-real-time ERP synchronisation. Automation scripts attached to objects can implement validation logic that exceeds standard configuration. Labour and crew availability for scheduling is modelled through calendars and shifts assigned to labour and crews. Domain changes and security site restrictions neither synchronise data externally nor provide scheduling availability.
-
12 Question 12 Single choice Asset & Inventory Management Confiuration
A distribution centre's inventory team notices that stock counts for a fast-moving item differ between the storeroom and the reorder report. The item is stored in two storerooms, and the reorder report sums balances across all storerooms. A new reorder point has just been applied to the item, yet the reorder report still flags the item as needing replenishment despite sufficient combined stock. Which investigation step is the MOST appropriate FIRST step?
Correct Answer: CExplanationReorder points in Maximo are maintained at the item-storeroom level, so the first check is whether the new reorder point was applied in each storeroom holding the item, since a storeroom with an older value would still trigger a flag. Deleting the item master would destroy the shared definition and history without addressing the cause. A meter does not affect reorder calculations, which are driven by inventory balances and reorder settings. Setting the reorder quantity to zero masks the problem rather than diagnosing it and may cause real shortages.
-
13 Question 13 Order list Work Management & Planning
A plant needs a recurring inspection of its boiler every 90 days, with the generated work order carrying the standard inspection tasks and being scheduled into the maintenance calendar. The planner has no master PM for the boiler yet and the job plan already exists. Arrange the steps in the correct order.
Drag the steps into the correct order, or use the arrows.
- Activate the master PM so that the PM generation process creates work orders.
- Set the frequency of the master PM to 90 days and define the start date.
- Create the job plan with the inspection tasks and confirm its status is active.
- Verify the generated work order contains the job plan tasks and appears in the scheduler.
- Create a master PM for the boiler asset and select the job plan.
Correct Answer:- Create the job plan with the inspection tasks and confirm its status is active.
- Create a master PM for the boiler asset and select the job plan.
- Set the frequency of the master PM to 90 days and define the start date.
- Activate the master PM so that the PM generation process creates work orders.
- Verify the generated work order contains the job plan tasks and appears in the scheduler.
ExplanationThe job plan must exist and be active before a master PM can reference it, the master PM must be created and given its frequency and start date, and only then can it be activated so the PM generation process produces work orders. Verification of the generated work order comes last, after generation has occurred. Activating the master PM before defining its frequency or job plan would create a PM with incomplete definition, and verifying before activation would find no generated work orders.
-
14 Question 14 Single choice Work Management & Planning
A maintenance supervisor wants to review and track a set of equipment inspections as a distinct workflow separate from corrective and preventive work orders. Inspection results must be recorded against each asset with measurable readings, and the supervisor wants the inspection queue to be accessed without creating new work order records for routine checks. Which work centre best supports this requirement?
Correct Answer: AExplanationThe Inspections work centre is designed for scheduling and recording inspection forms against assets with measurable results, separate from standard work order processing. Work Order Tracking filters work orders, which would still create work order records for routine checks, contrary to the requirement. Purchase Requisitions handle procurement, and Labor Reporting captures time, so neither supports inspection recording.
These are 14 of the 64 questions in the full C1000-132 pack.
Get All 64 QuestionsGet all 64 questions & answers
Full access options for IBM C1000-132
Self-study
PDF Version
- 64 actual exam questions
- Compatible with all devices
- Printable PDF format
- No download limits
- 90 days free updates
- 24/7 customer support
Best value
Bundle Pack
- Discounted PDF + online access
- 64 actual exam questions
- Both PDF and online practice test
- Free 90 days updates
- No download or practice limits
- 24/7 customer support
Exam simulation
Online Practice Test
- 64 actual exam questions
- Actual exam environment
- 90 days free updates
- Browser-based software
- 24/7 customer support
100% Money Back Guarantee
Your success comes first
At DumpsProvider, we give you a 100% money back guarantee on all of our exam dumps. For us, your success is the #1 priority and we are more than confident that our exam material will help you pass the C1000-132 Exam (IBM Maximo Manage v8.0 Implementation) on your very first attempt.
In a rare case, if you fail your exam, we will refund your amount without asking a single question.