1 Question 1 Single choice Site survey and planning
A regional utility is planning a 7 GHz Huawei microwave link of 38 km between two substations. The survey team finds that the planned tower at the midpoint has a clear line of sight, but a new housing development is scheduled to be built within the first Fresnel zone in 18 months. The customer requires the link to stay available for at least five years without a costly redesign, and the budget does not allow extra towers. Which planning action is the BEST choice?
Correct Answer: AExplanationRaising the antenna heights at both ends is the planning choice that keeps the first Fresnel zone clear of the future housing development without adding towers, which the budget rules out. Larger antennas improve gain but do not remove diffraction loss from an obstructed path, so they do not solve the clearance problem. The 38 GHz band has a smaller Fresnel zone, but its rain attenuation over 38 km is far worse and the link would fail the availability target. Lowering transmit power only reduces the margin further and adaptive modulation cannot recover a path that is blocked by terrain or structures.
-
2 Question 2 Single choice Equipment configuration
An operator is commissioning a Huawei microwave link between two sites that must carry an E1 service. The engineer has set the radio frequency channel, the transmit power and the working frequency, but the link does not come up. The remote end reports a frequency mismatch alarm. The planning sheet states that both ends must use the same channel arrangement and that the local station is the one allocated the lower-band channel. Which action should the engineer take FIRST to bring the link up?
Correct Answer: CExplanationA frequency mismatch alarm points to radio channel configuration rather than hardware or power. Each end of a microwave link must transmit on the frequency the other end receives, so the transmit and receive frequencies must be the complementary pair defined by the channel arrangement. Modulation settings matter only after the radio pair is aligned, so changing them first wastes time. Replacing the IF cable addresses a hardware fault that the alarm does not indicate. Raising power cannot fix a frequency plan error and could violate regulatory limits.
-
3 Question 3 Multiple choice Installation procedures
A field crew is installing an outdoor unit on a rooftop mast at a coastal site. The installation manual requires that the outdoor unit be bonded to the tower earth system and that the feeder grounding be correct to protect against lightning surges. The crew must meet the grounding requirement while keeping the installation within a limited maintenance window. Which TWO actions should the crew take to meet the grounding and cabling requirements? (Choose two.)
Correct Answer: A, BExplanationShort, low-impedance bonding of the outdoor unit and feeder ground kits to the tower ground bar is what protects equipment from lightning-induced surges, and ground kits at the building entry are part of the required feeder grounding. Running power and IF cables together in one tray introduces interference and violates separation practice. Connecting the outdoor unit to the electrical neutral instead of the tower earth creates a potential difference hazard. Omitting the lower tower ground kits removes protection that the manual requires.
-
4 Question 4 Dropdown Microwave hardware components
A technician is reviewing the power supply configuration for an outdoor radio site where the indoor power module must feed the outdoor unit over a shared cable. The site uses a DC power source, and the technician must confirm the correct power-supply mapping before commissioning. Complete the statement by selecting the correct value for each blank.
Choose the correct value for each blank.
The outdoor unit is supplied with power through the cable, and the indoor unit receives its power from the module.Correct Answer:The outdoor unit is supplied with 48 V DC power through the power cable, and the indoor unit receives its power from the rectifier module.
ExplanationIn a standard Huawei outdoor radio deployment the outdoor unit is fed with 48 V DC delivered over the power portion of the combined cable, while the indoor unit draws its supply from the rectifier module at the site. A 220 V AC or 24 V AC feed does not match the DC-powered architecture described. The IF cable carries intermediate frequency signals rather than power, so it cannot be the feed path. A battery or inverter is not the module that converts site mains into the working DC supply, and a surge protector only limits transients, not supply.
-
5 Question 5 Order list Safety procedures
A maintenance engineer must replace a faulty outdoor radio unit on a tower while the link is in service at a site where the power feed cannot be fully isolated during the working period. The site safety policy requires that hazards be controlled before any tower work starts. Arrange the steps in the correct order.
Drag the steps into the correct order, or use the arrows.
- Disconnect the faulty unit only after the power and feeder are confirmed isolated, then replace it.
- Confirm the tower work permit and the isolation status of the power feed with the site supervisor.
- Apply the lockout and tagout on the DC supply and verify zero voltage with a meter at the feed point.
- Secure the tower climbing equipment and attach the fall protection before ascending.
Correct Answer:- Confirm the tower work permit and the isolation status of the power feed with the site supervisor.
- Apply the lockout and tagout on the DC supply and verify zero voltage with a meter at the feed point.
- Secure the tower climbing equipment and attach the fall protection before ascending.
- Disconnect the faulty unit only after the power and feeder are confirmed isolated, then replace it.
ExplanationWork permits and isolation confirmation must come first, because nothing on the tower can start until the supervisor has approved the job and the power status is known. Lockout and tagout with a zero-voltage check must follow before any physical contact with the powered equipment. Fall protection is set up before climbing, which logically sits after the energy-control steps but before the replacement. The unit is disconnected and replaced only once isolation is verified, so disconnecting earlier would expose the engineer to live supply.
-
6 Question 6 Single choice Microwave transmission principles
An operator is designing a 6 GHz hop of 52 km in a region with heavy seasonal fog and moderate rain. The engineers want to know which propagation effect is most likely to degrade the link availability over the year and should be included in the fade margin calculation. The operator wants a design that meets the availability target without over-engineering the radio hardware. Which effect should be prioritised in the fade margin?
Correct Answer: BExplanationAt 6 GHz rain attenuation is small, so the dominant year-round fading mechanism that limits availability on long paths over water is multipath fading caused by temperature inversions, which the fade margin must cover. Free-space path loss is fixed and is already accounted for in the link budget rather than being a fading effect. Co-channel interference is addressed through frequency planning and is not a fade margin term. Describing rain as comparatively small is correct at 6 GHz, but the option pairs it with the wrong conclusion that it dominates the availability, which is not the case here.
-
7 Question 7 Drag and drop Testing and optimization
After commissioning a new microwave link, the operations team must verify its performance before handover. The customer has asked for a set of checks that confirm the radio is transmitting at the correct level, the receive signal is within limits, and the link is stable under test. Match each verification requirement to the test that confirms it.
Drag each item onto its matching target. On a phone: tap an item, then tap a target.
Confirm the transmit power is within the planned range at both endsConfirm the receive signal level has adequate fade marginConfirm the link is error free over an extended periodRun a bit error rate test over the agreed durationMeasure the antenna alignment with a spectrum analyser sweepRecord the received signal level and compare it to the thresholdCheck the transmit power reading against the link planVerify the grounding resistance of the tower ground barCorrect Answer:- Confirm the transmit power is within the planned range at both ends → Check the transmit power reading against the link plan
- Confirm the receive signal level has adequate fade margin → Record the received signal level and compare it to the threshold
- Confirm the link is error free over an extended period → Run a bit error rate test over the agreed duration
ExplanationTransmit power is verified against the planned value because that is what the link plan specifies, so reading the transmit level and comparing it to the plan is the direct check. The received signal level must be recorded and compared to the receiver threshold to prove fade margin. Error-free operation over time is proven by a bit error rate test run for the contracted duration. Antenna alignment is checked through received level optimisation rather than a spectrum sweep, and grounding resistance is a separate installation check, so neither fits the three requirements.
-
8 Question 8 Single choice Troubleshooting
A microwave link between two towers is carrying traffic but shows a high bit error rate and frequent errored seconds during peak hours, while the received signal level remains within the expected range. The site has a recent history of an unprotected coaxial feeder that was re-terminated after a storm. The operator needs to find the most likely cause quickly without interrupting the service for more than a few minutes. Which action should the engineer take FIRST?
Correct Answer: AExplanationA normal received signal level with a high bit error rate points to an interference or hardware path fault rather than a path loss issue, and the recent re-termination of the feeder makes poor connector or grounding work the prime suspect. Checking the connectors at that point is quick and does not interrupt service much. Replacing the far-end radio is premature because the receive level is healthy. Raising transmit power could worsen interference and is not a diagnosis. Realigning antennas targets received level, which is already within range, so it would not address the errors.
-
9 Question 9 Multiple choice Equipment configuration
A network planner is configuring a Huawei microwave link that must provide a guaranteed 155 Mbit/s service while keeping the link within a constrained licensed bandwidth allocation. The customer requires that the link adapt its modulation to rain conditions instead of dropping traffic during fades, and that the configuration remain within the licensed channel bandwidth. Which TWO configuration choices meet these requirements? (Choose two.)
Correct Answer: B, CExplanationAdaptive coding and modulation lets the link step down its modulation during fades so the service stays up, which is exactly what the customer asks for. Choosing a channel bandwidth that carries the capacity while staying inside the licence is required by the licensed allocation. A fixed 256QAM setting cannot adapt and would drop traffic in fades. A 56 MHz channel violates the 28 MHz licence limit. Disabling radio link protection removes the switchover that keeps traffic alive during a hardware or path failure.
-
10 Question 10 Single choice Site survey and planning
A mobile operator needs a short microwave backhaul hop of 4 km between a macro site and a hub site in a dense urban area. The survey shows that the hub rooftop is available but a glass-clad building lies on the direct line between the two sites. The operator requires the link to be installed within six weeks and wants to avoid an extended civil works project. Which planning solution is the BEST choice?
Correct Answer: CExplanationA two-hop route through an intermediate rooftop that clears the obstruction avoids civil works and meets the six-week timeline, since rooftop sites are available. Mounting on a glass facade relies on uncontrolled reflection and is not a reliable design. Increasing power does not overcome the blockage from a building, and the glass does not reduce interference in a useful way. A passive reflector without a survey breaks the requirement to plan the link properly and would not hold the fade margin.
-
11 Question 11 Dropdown Installation procedures
An installation engineer is preparing the outdoor unit cabling on a tower where the feeder length and the cable routing must meet the manufacturer's specified limits. The engineer must confirm the correct cable and bend radius settings before the final connection. Complete the statement by selecting the correct value for each blank.
Choose the correct value for each blank.
The feeder must be routed with a minimum bend radius of times the cable outer diameter, and the connectors must be weatherproofed with tape before the grounding kits are fitted.Correct Answer:The feeder must be routed with a minimum bend radius of 10 times the cable outer diameter, and the connectors must be weatherproofed with self-amalgamating tape before the grounding kits are fitted.
ExplanationFeeder cables must be routed with a bend radius of about ten times the outer diameter to avoid damaging the internal conductor and impedance, and connectors are sealed with self-amalgamating tape before grounding kits are added. A smaller multiple such as five or two would overstress the cable. Adhesive vinyl and masking tape do not form the weatherproof seal that outdoor connectors need, and cloth tape gives no moisture protection, so those choices break the weatherproofing requirement.
-
12 Question 12 Single choice Microwave transmission principles
A link engineer is reviewing an existing 13 GHz hop whose receive level has become unstable after a neighbouring site installed a new transmitter on a similar frequency. The operator wants the cause identified before any hardware is changed, and the engineer must choose the interference check to run first. Which check should the engineer perform FIRST?
Correct Answer: CExplanationBecause a new transmitter on a similar frequency appeared and the operator forbids changing hardware first, measuring the spectrum around the receive frequency directly identifies the interfering signal. Replacing the outdoor unit violates the instruction to diagnose before changing hardware. Recalculating path loss will not reveal interference, since the path itself has not changed. Lowering modulation may mask the symptom but does not identify the cause and reduces capacity.
-
13 Question 13 Order list Troubleshooting
A microwave link has lost its service after a planned upgrade and the alarm shows a radio synchronisation failure at the remote site. The engineer must restore service with the least disruption and follow a logical fault isolation sequence. Arrange the steps in the correct order.
Drag the steps into the correct order, or use the arrows.
- Restore the last known good configuration if the parameter mismatch is confirmed and monitor the link.
- Inspect the IF cable and power connections at the remote outdoor unit for faults.
- Check the active alarms at both ends to confirm which site reports the synchronisation failure.
- Verify the configuration of the radio channel and frequency parameters against the planned values.
Correct Answer:- Check the active alarms at both ends to confirm which site reports the synchronisation failure.
- Verify the configuration of the radio channel and frequency parameters against the planned values.
- Inspect the IF cable and power connections at the remote outdoor unit for faults.
- Restore the last known good configuration if the parameter mismatch is confirmed and monitor the link.
ExplanationThe engineer starts by reading the alarms to see which end is affected and what is reported. Configuration parameters are checked next because an upgrade is the likely trigger for a mismatch. Physical cable and power checks come after the configuration has been confirmed, so that hardware is not touched unnecessarily. Restoring the last known good configuration is the corrective step only once the mismatch is verified, and monitoring confirms recovery.
-
14 Question 14 Single choice Equipment configuration
A utility is commissioning a high-availability Huawei microwave link that must support protection switching between two radio pairs in a 1+1 arrangement. The engineer must ensure the protection pair switches automatically after a main radio failure while keeping the traffic path intact. The budget is limited, so the engineer wants the protection configured without adding new hardware. Which configuration should the engineer apply?
Correct Answer: CExplanationA 1+1 hot standby configuration with automatic switching is the protection mode that keeps traffic moving when the main radio fails, and it uses the radio pair already in the design. Manual switching does not meet the automatic requirement. Two independent links sharing an address create an addressing conflict and provide no protection. Increasing transmit power does not prevent hardware failure, so it cannot satisfy the availability requirement.
These are 14 of the 60 questions in the full H35-911 pack.
Get All 60 QuestionsGet all 60 questions & answers
Full access options for Huawei H35-911
Self-study
PDF Version
- 60 actual exam questions
- Compatible with all devices
- Printable PDF format
- No download limits
- 90 days free updates
- 24/7 customer support
Best value
Bundle Pack
- Discounted PDF + online access
- 60 actual exam questions
- Both PDF and online practice test
- Free 90 days updates
- No download or practice limits
- 24/7 customer support
Exam simulation
Online Practice Test
- 60 actual exam questions
- Actual exam environment
- 90 days free updates
- Browser-based software
- 24/7 customer support
100% Money Back Guarantee
Your success comes first
At DumpsProvider, we give you a 100% money back guarantee on all of our exam dumps. For us, your success is the #1 priority and we are more than confident that our exam material will help you pass the H35-911 Exam (HCS Microwave Hardware Installation (Written)) on your very first attempt.
In a rare case, if you fail your exam, we will refund your amount without asking a single question.