2026 Actual Huawei H35-911 Dumps, Updated Exam Questions for Guaranteed Pass

HCS Microwave Hardware Installation (Written) - Free Practice Questions with Explanations, Exam Dumps, and Complete Practice Pack from DumpsProvider.

Exam Information

VendorHuawei
Exam codeH35-911
Exam nameHCS Microwave Hardware Installation (Written)
Questions in pack60
Last updatedNovember 22, 2026
Related certificationsHuawei Certified Specialist

Free practice questions with explanations

Huawei H35-911 Practice Questions

Answer a question to see the correct answer and the explanation, or click Show answer. Newest questions first.

Questions
14
Answered
0
Correct
0
Score
-
  1. 1 Question 1 Single choice Site survey and planning

    A regional utility is planning a 7 GHz Huawei microwave link of 38 km between two substations. The survey team finds that the planned tower at the midpoint has a clear line of sight, but a new housing development is scheduled to be built within the first Fresnel zone in 18 months. The customer requires the link to stay available for at least five years without a costly redesign, and the budget does not allow extra towers. Which planning action is the BEST choice?

  2. 2 Question 2 Single choice Equipment configuration

    An operator is commissioning a Huawei microwave link between two sites that must carry an E1 service. The engineer has set the radio frequency channel, the transmit power and the working frequency, but the link does not come up. The remote end reports a frequency mismatch alarm. The planning sheet states that both ends must use the same channel arrangement and that the local station is the one allocated the lower-band channel. Which action should the engineer take FIRST to bring the link up?

  3. 3 Question 3 Multiple choice Installation procedures

    A field crew is installing an outdoor unit on a rooftop mast at a coastal site. The installation manual requires that the outdoor unit be bonded to the tower earth system and that the feeder grounding be correct to protect against lightning surges. The crew must meet the grounding requirement while keeping the installation within a limited maintenance window. Which TWO actions should the crew take to meet the grounding and cabling requirements? (Choose two.)

  4. 4 Question 4 Dropdown Microwave hardware components

    A technician is reviewing the power supply configuration for an outdoor radio site where the indoor power module must feed the outdoor unit over a shared cable. The site uses a DC power source, and the technician must confirm the correct power-supply mapping before commissioning. Complete the statement by selecting the correct value for each blank.

    Choose the correct value for each blank.

    The outdoor unit is supplied with power through the cable, and the indoor unit receives its power from the module.
  5. 5 Question 5 Order list Safety procedures

    A maintenance engineer must replace a faulty outdoor radio unit on a tower while the link is in service at a site where the power feed cannot be fully isolated during the working period. The site safety policy requires that hazards be controlled before any tower work starts. Arrange the steps in the correct order.

    Drag the steps into the correct order, or use the arrows.

    1. Disconnect the faulty unit only after the power and feeder are confirmed isolated, then replace it.
    2. Confirm the tower work permit and the isolation status of the power feed with the site supervisor.
    3. Apply the lockout and tagout on the DC supply and verify zero voltage with a meter at the feed point.
    4. Secure the tower climbing equipment and attach the fall protection before ascending.
  6. 6 Question 6 Single choice Microwave transmission principles

    An operator is designing a 6 GHz hop of 52 km in a region with heavy seasonal fog and moderate rain. The engineers want to know which propagation effect is most likely to degrade the link availability over the year and should be included in the fade margin calculation. The operator wants a design that meets the availability target without over-engineering the radio hardware. Which effect should be prioritised in the fade margin?

  7. 7 Question 7 Drag and drop Testing and optimization

    After commissioning a new microwave link, the operations team must verify its performance before handover. The customer has asked for a set of checks that confirm the radio is transmitting at the correct level, the receive signal is within limits, and the link is stable under test. Match each verification requirement to the test that confirms it.

    Drag each item onto its matching target. On a phone: tap an item, then tap a target.

    Confirm the transmit power is within the planned range at both ends
    Confirm the receive signal level has adequate fade margin
    Confirm the link is error free over an extended period
    Run a bit error rate test over the agreed duration
    Measure the antenna alignment with a spectrum analyser sweep
    Record the received signal level and compare it to the threshold
    Check the transmit power reading against the link plan
    Verify the grounding resistance of the tower ground bar
  8. 8 Question 8 Single choice Troubleshooting

    A microwave link between two towers is carrying traffic but shows a high bit error rate and frequent errored seconds during peak hours, while the received signal level remains within the expected range. The site has a recent history of an unprotected coaxial feeder that was re-terminated after a storm. The operator needs to find the most likely cause quickly without interrupting the service for more than a few minutes. Which action should the engineer take FIRST?

  9. 9 Question 9 Multiple choice Equipment configuration

    A network planner is configuring a Huawei microwave link that must provide a guaranteed 155 Mbit/s service while keeping the link within a constrained licensed bandwidth allocation. The customer requires that the link adapt its modulation to rain conditions instead of dropping traffic during fades, and that the configuration remain within the licensed channel bandwidth. Which TWO configuration choices meet these requirements? (Choose two.)

  10. 10 Question 10 Single choice Site survey and planning

    A mobile operator needs a short microwave backhaul hop of 4 km between a macro site and a hub site in a dense urban area. The survey shows that the hub rooftop is available but a glass-clad building lies on the direct line between the two sites. The operator requires the link to be installed within six weeks and wants to avoid an extended civil works project. Which planning solution is the BEST choice?

  11. 11 Question 11 Dropdown Installation procedures

    An installation engineer is preparing the outdoor unit cabling on a tower where the feeder length and the cable routing must meet the manufacturer's specified limits. The engineer must confirm the correct cable and bend radius settings before the final connection. Complete the statement by selecting the correct value for each blank.

    Choose the correct value for each blank.

    The feeder must be routed with a minimum bend radius of times the cable outer diameter, and the connectors must be weatherproofed with tape before the grounding kits are fitted.
  12. 12 Question 12 Single choice Microwave transmission principles

    A link engineer is reviewing an existing 13 GHz hop whose receive level has become unstable after a neighbouring site installed a new transmitter on a similar frequency. The operator wants the cause identified before any hardware is changed, and the engineer must choose the interference check to run first. Which check should the engineer perform FIRST?

  13. 13 Question 13 Order list Troubleshooting

    A microwave link has lost its service after a planned upgrade and the alarm shows a radio synchronisation failure at the remote site. The engineer must restore service with the least disruption and follow a logical fault isolation sequence. Arrange the steps in the correct order.

    Drag the steps into the correct order, or use the arrows.

    1. Restore the last known good configuration if the parameter mismatch is confirmed and monitor the link.
    2. Inspect the IF cable and power connections at the remote outdoor unit for faults.
    3. Check the active alarms at both ends to confirm which site reports the synchronisation failure.
    4. Verify the configuration of the radio channel and frequency parameters against the planned values.
  14. 14 Question 14 Single choice Equipment configuration

    A utility is commissioning a high-availability Huawei microwave link that must support protection switching between two radio pairs in a 1+1 arrangement. The engineer must ensure the protection pair switches automatically after a main radio failure while keeping the traffic path intact. The budget is limited, so the engineer wants the protection configured without adding new hardware. Which configuration should the engineer apply?

These are 14 of the 60 questions in the full H35-911 pack.

Get All 60 Questions

Get all 60 questions & answers

706 Satisfied customers
95.7% Pass rate feedback
82.9% Said questions matched
95% Found material helpful

Full access options for Huawei H35-911

Self-study

PDF Version

$40.00 $20.00
  • 60 actual exam questions
  • Compatible with all devices
  • Printable PDF format
  • No download limits
  • 90 days free updates
  • 24/7 customer support

Exam simulation

Online Practice Test

$50.00 $25.00
  • 60 actual exam questions
  • Actual exam environment
  • 90 days free updates
  • Browser-based software
  • 24/7 customer support

100% Money Back Guarantee

Your success comes first

At DumpsProvider, we give you a 100% money back guarantee on all of our exam dumps. For us, your success is the #1 priority and we are more than confident that our exam material will help you pass the H35-911 Exam (HCS Microwave Hardware Installation (Written)) on your very first attempt.

In a rare case, if you fail your exam, we will refund your amount without asking a single question.

100%

Security & Privacy

10000+

Satisfied Customers

24/7

Committed Service

100%

Money Back Guranteed