Exam Information
Free practice questions with explanations
Ericsson ECP-206 Practice Questions
Answer a question to see the correct answer and the explanation, or click Show answer. Newest questions first.
- Questions
- 11
- Answered
- 0
- Correct
- 0
- Score
- -
-
1 Question 1 Single choice Subnetting
A branch office has been allocated 10.20.64.0/20 by head office. The branch needs four separate VLAN subnets, each sized for a maximum of 500 hosts, and it must leave the remaining address space unassigned so that a future site can be added without renumbering. The network team wants the smallest number of subnets that satisfies the 500-host requirement while keeping the allocation aligned on prefix boundaries. Which subnetting plan should the engineer implement?
Correct Answer: DExplanationA /23 provides 510 usable host addresses, which covers the 500-host requirement, and four /23 blocks aligned on 2-address-block boundaries (third octet 64, 66, 68, 70) fit within the /20 without wasting space that the branch would need to keep free. Option B uses /22 blocks, which satisfy the host count but consume the entire /20 and leave no room for the future site as required. Option C places the subnets on consecutive /23 boundaries that actually overlap the same /22 in a way that is not aligned to the intended allocation plan and fails the spacing requirement. Option D provides only 254 hosts per subnet, which is insufficient for the 500-host requirement.
-
2 Question 2 Order list Network Troubleshooting
A site-to-site IPsec tunnel between two Ericsson routers has stopped passing traffic after a maintenance window, although the interfaces are up. The on-call engineer must isolate the fault without disrupting the other tunnels on the same router. Arrange the steps in the order they must be performed.
Drag the steps into the correct order, or use the arrows.
- Review the IPsec security association and traffic selectors to confirm they match the protected local and remote subnets
- Compare the IKE and IPsec proposals and pre-shared key or certificate settings on both ends for mismatches
- Confirm that the protected subnets are reachable in both directions and check interface counters for drops
- Verify that the tunnel interface and the physical interface carrying the tunnel endpoint are both up and that routing points the remote peer subnet toward the tunnel
- Check the IKE security association state to confirm phase 1 is established with the expected peer address
Correct Answer:- Verify that the tunnel interface and the physical interface carrying the tunnel endpoint are both up and that routing points the remote peer subnet toward the tunnel
- Check the IKE security association state to confirm phase 1 is established with the expected peer address
- Compare the IKE and IPsec proposals and pre-shared key or certificate settings on both ends for mismatches
- Review the IPsec security association and traffic selectors to confirm they match the protected local and remote subnets
- Confirm that the protected subnets are reachable in both directions and check interface counters for drops
ExplanationTroubleshooting starts with the lowest layer, confirming the tunnel and underlay interfaces and the routes that send traffic into the tunnel, before any tunnel-specific checks. Phase 1 (IKE) must be verified before phase 2, so the IKE SA state comes next, followed by a comparison of proposals and credentials that explains a failed phase 1. Once IKE is up, the IPsec SA and traffic selectors are checked, and only then is end-to-end reachability validated. Doing the reachability test first wastes time, and checking proposals before the underlay ignores the more basic routing and interface causes.
-
3 Question 3 Single choice Routing Protocols (OSPF, BGP, RIP)
An Ericsson router in a regional aggregation site runs OSPF area 0 with a neighbouring router in a second site. Operations has reported that after a link flap, the OSPF adjacency returns but some prefixes take several minutes to reappear in the routing table, which violates a 30-second convergence target. The engineer must improve convergence without changing the topology or adding hardware. Which change is the most appropriate first action?
Correct Answer: DExplanationBFD gives fast, sub-second failure detection independent of OSPF's hello timers, which is the bottleneck when a flap is detected only after the dead interval expires. Pairing BFD with OSPF lets the protocol react quickly and meets the convergence target without topology changes. Increasing the hello and dead intervals makes detection slower, not faster, and worsens the problem. Making the interface passive removes the adjacency entirely, which breaks the routing exchange. Changing the network type alters LSA behaviour but does not address detection latency and would require adjacency re-establishment on a live link.
-
4 Question 4 Drag and drop Network Security and Firewalls
A financial services company is tightening access to a shared management subnet that hosts router and switch administration interfaces. Only the network operations jump host may reach SSH and SNMP on those devices, the monitoring server must poll SNMP only, and all other hosts in the campus must be denied without logging noise on the core. Match each requirement to the access control element that meets it best.
Drag each item onto its matching target. On a phone: tap an item, then tap a target.
Drop all remaining traffic into the management subnet without per-packet logging on the corePermit SSH to management devices only from the jump host addressPermit SNMP polling from the monitoring server while blocking other sourcesExtended ACL entry matching the jump host source and TCP port 22Named prefix list applied to the BGP neighbourExtended ACL entry matching the monitoring server source and UDP port 161Standard ACL matching source addresses onlyFinal implicit or explicit deny at the end of the access listCorrect Answer:- Permit SSH to management devices only from the jump host address → Extended ACL entry matching the jump host source and TCP port 22
- Permit SNMP polling from the monitoring server while blocking other sources → Extended ACL entry matching the monitoring server source and UDP port 161
- Drop all remaining traffic into the management subnet without per-packet logging on the core → Final implicit or explicit deny at the end of the access list
ExplanationPort-specific control for SSH and SNMP requires an extended ACL, which can match both source address and destination port, and it should be applied inbound on the interface facing the management subnet. The monitoring server requirement is met the same way by matching UDP 161 from that single source. The default deny at the end of the list blocks everything else, and avoiding a log keyword keeps noise off the core. A standard ACL cannot distinguish services, and a prefix list filters routing updates rather than data traffic, so neither fits the stated requirements.
-
5 Question 5 Single choice IP Addressing (IPv4, IPv6)
A utility company is deploying an IPv6 addressing plan for remote substations. Each substation router must receive a /56 delegated prefix from a central pool, and the substation LAN must use a /64 for each of several VLANs so that hosts autoconfigure addresses with SLAAC. The operations team wants minimal manual configuration at each site and a single summarisable block per region. Which addressing design best meets these requirements?
Correct Answer: AExplanationA /48 regional block gives a summarisable aggregate, delegating /56 to each substation leaves eight bits for subnets, and each /64 VLAN is the size SLAAC requires, so the hierarchy is consistent from region down to the host. Option B allocates a /64 to a region, which leaves no space for substations to receive /56 delegations. Option C reverses the hierarchy so substations receive /64s that cannot be further subnetted for multiple VLANs, and static host addressing contradicts the minimal-configuration goal. Option D places /56 blocks on VLANs where SLAAC requires /64, so the VLAN prefix length is wrong.
-
6 Question 6 Dropdown Network Address Translation (NAT)
A retail chain has deployed a branch router that must give internal hosts in 192.168.10.0/24 outbound internet access using the single public address on its WAN interface. Internal web servers in 192.168.20.0/24 must also be reachable from the internet on TCP port 443 at the same public address, and the solution must not require a second public IP. Complete the configuration fragment by selecting the correct value for each blank.
Choose the correct value for each blank.
ip nat inside source list INSIDE-HOSTS interface GigabitEthernet0/1
ip nat inside source static tcp 192.168.20.10 443 interface GigabitEthernet0/1
interface GigabitEthernet0/0
ip natCorrect Answer:ip nat inside source list INSIDE-HOSTS interface GigabitEthernet0/1 overload
ip nat inside source static tcp 192.168.20.10 443 interface GigabitEthernet0/1 443
interface GigabitEthernet0/0
ip nat insideExplanationPAT is achieved by adding the overload keyword to a dynamic source translation, which lets many internal hosts share the single WAN address by distinguishing sessions on port numbers. The static port-level mapping for the web server uses the same interface address and forwards TCP 443 to the internal server, so the public address serves both directions. Interfaces facing the LAN are marked inside, the WAN side is marked outside, and the internal interface is the one labelled inside on the GigabitEthernet0/0 segment. Using pool would require a separate public address, and selecting a different port would break the stated HTTPS service.
-
7 Question 7 Multiple choice Network Troubleshooting
An Ericsson router in a data centre edge shows intermittent packet loss toward a set of application servers. Interface GigabitEthernet0/2 shows a rising input error count, the CPU is normal, and the issue began after a patch cable was replaced. The engineer must determine the most likely causes and the verification steps that are appropriate without taking the link out of service during business hours. Choose two actions that are appropriate for this situation.
Correct Answer: C, DExplanationRising input errors after a cable change point to physical-layer problems such as a faulty patch cable, damaged connector, or optics, so reading error counters and optic or cable diagnostics confirms the fault without service interruption. Duplex or speed mismatch is another common cause of CRC and alignment errors after cabling work, and checking both ends is a non-disruptive verification step. Shutting down the interface disrupts traffic and clears counters only at the cost of losing evidence, and replacing the line card is premature. Raising the MTU does not address input errors and may introduce new problems.
-
8 Question 8 Single choice Ericsson IP networking products and solutions
A telecom operator is selecting an Ericsson router platform for an edge aggregation site that must provide high-density 10G access ports, run full routing protocol support including BGP, and be deployable in a compact rack with redundant power. The site has a strict power budget and the operator will not accept end-of-sale hardware. Which product choice best fits the requirements, and what must the engineer verify before ordering?
Correct Answer: BExplanationThe correct approach matches the platform to the stated port density, compact form factor, redundant power, and routing needs, then checks that the hardware and software are still in active support, since the operator excludes end-of-sale equipment. Verifying the release notes for BGP feature support avoids a mismatch between the chosen software train and the required protocol functions. Selecting an oversized core router ignores the power budget, and a Layer 2 access switch cannot provide the required routing on its own. Ignoring the power budget and seeking a waiver contradicts a stated constraint.
-
9 Question 9 Order list Routing Protocols (OSPF, BGP, RIP)
A service provider is adding a new eBGP peering session between an Ericsson edge router and an upstream transit provider. The session must come up with the correct policy applied so that only the agreed prefixes are accepted before any routes are advertised, and the change must not disturb existing sessions. Arrange the steps in the order they must be performed.
Drag the steps into the correct order, or use the arrows.
- Apply the policies to the neighbour and confirm that existing peer sessions are unaffected
- Configure the inbound prefix filter that accepts only the agreed customer prefixes from the new neighbour
- Create the BGP neighbour statement with the remote AS and the correct update source and enable the address family
- Configure the outbound policy so that only the agreed local prefixes are advertised to the new neighbour
- Verify the session reaches the Established state and check the received and accepted prefix counts
Correct Answer:- Configure the inbound prefix filter that accepts only the agreed customer prefixes from the new neighbour
- Create the BGP neighbour statement with the remote AS and the correct update source and enable the address family
- Verify the session reaches the Established state and check the received and accepted prefix counts
- Configure the outbound policy so that only the agreed local prefixes are advertised to the new neighbour
- Apply the policies to the neighbour and confirm that existing peer sessions are unaffected
ExplanationThe neighbour and address family must exist before any policy can be attached, so the peer is defined first. Inbound filtering is configured before the session is brought up so that unwanted routes are never accepted, and outbound policy follows before advertisement. Policies are then applied to the neighbour, and the Established state and prefix counts are checked to confirm the expected routes. Verifying existing sessions last ensures the change did not disrupt them. Checking the session state before policy is attached risks accepting the full table or advertising prefixes early.
-
10 Question 10 Single choice Network Security and Firewalls
A healthcare provider must allow its clinical workstations on VLAN 30 to reach an application server on VLAN 60 using only HTTPS, and it must prevent those workstations from reaching any other service on that server. The network team applies an ACL on the router interface facing VLAN 30. The first attempt blocks all traffic, including HTTPS, and the change window is closing. What is the most likely cause, and what should be changed?
Correct Answer: AExplanationACL entries are evaluated top to bottom and the first match wins, so a broader deny placed before the permit for HTTPS would block the intended traffic, which explains why all traffic was dropped. Reordering the permit above the deny and keeping the final deny for everything else meets the requirement without changing the interface or design. Return traffic is handled by the ACL direction and the router's routing state rather than requiring a stateful firewall. Applying the ACL in the other direction would change which packets are filtered, but the symptom described points to ordering, and an IP-based ACL cannot match a MAC address.
-
11 Question 11 Dropdown Subnetting
A logistics company has a regional network that must support an address plan where each warehouse uses a /27 for its management VLAN, and head office wants to summarise all warehouses in the 172.16.0.0 range into a single advertised route to reduce the BGP table size. The current warehouse blocks are 172.16.4.0/27, 172.16.4.32/27, 172.16.4.64/27 and 172.16.4.96/27. Complete the summary route statement by selecting the correct value for each blank.
Choose the correct value for each blank.
ip route 172.16.4.0 Null0
The summary prefix length is bits, and the four /27 blocks fall within the 172.16.4.0 to 172.16.4.127 range.Correct Answer:ip route 172.16.4.0 255.255.255.128 Null0
The summary prefix length is 25 bits, and the four /27 blocks fall within the 172.16.4.0 to 172.16.4.127 range.ExplanationFour consecutive /27 blocks, 172.16.4.0 through 172.16.4.127, together occupy a /25, which is a 25-bit prefix with subnet mask 255.255.255.128. Summarising to this boundary is valid because the blocks are contiguous and aligned on the /25 boundary. Using /27 or /26 as the summary would either be too specific or include addresses outside the warehouse ranges. A /24 summary would overreach into space that is not part of the warehouse allocation and would advertise routes the company does not own in that range.
These are 11 of the 60 questions in the full ECP-206 pack.
Get All 60 QuestionsGet all 60 questions & answers
Full access options for Ericsson ECP-206
Self-study
PDF Version
- 60 actual exam questions
- Compatible with all devices
- Printable PDF format
- No download limits
- 90 days free updates
- 24/7 customer support
Best value
Bundle Pack
- Discounted PDF + online access
- 60 actual exam questions
- Both PDF and online practice test
- Free 90 days updates
- No download or practice limits
- 24/7 customer support
Exam simulation
Online Practice Test
- 60 actual exam questions
- Actual exam environment
- 90 days free updates
- Browser-based software
- 24/7 customer support
100% Money Back Guarantee
Your success comes first
At DumpsProvider, we give you a 100% money back guarantee on all of our exam dumps. For us, your success is the #1 priority and we are more than confident that our exam material will help you pass the ECP-206 Exam (Ericsson Certified Associate - IP Networking) on your very first attempt.
In a rare case, if you fail your exam, we will refund your amount without asking a single question.