Exam Information
Free practice questions with explanations
BICSI RCDDv14.1 Practice Questions
Answer a question to see the correct answer and the explanation, or click Show answer. Newest questions first.
- Questions
- 11
- Answered
- 0
- Correct
- 0
- Score
- -
-
1 Question 1 Dropdown Design ICT Solutions
A designer is specifying the grounding and bonding of a telecommunications room in a building with an existing telecommunications bonding backbone. The design must bond the telecommunications main grounding busbar to the building's grounding electrode system using the required conductor, and the conductor must be sized per the applicable standard. Complete the specification by selecting the correct value for each blank.
Choose the correct value for each blank.
Bond the telecommunications main grounding busbar to the building service ground using a conductor sized according to the table, and route the conductor with bends.Correct Answer:Bond the telecommunications main grounding busbar to the building service ground using a insulated copper conductor sized according to the grounding conductor sizing table, and route the conductor with gradual bends.
ExplanationThe telecommunications bonding conductor is specified as insulated copper, sized from the grounding conductor sizing table in the cited standard, and routed with gradual bends to limit inductance. Bare copper is not the choice for an insulated bonding conductor in this context, aluminium is not favoured for grounding in telecommunications spaces, and steel-reinforced conductors are not used for bonding. Power loading and cable ampacity tables do not size grounding conductors, and fire-stop ratings are unrelated. Sharp and right-angle bends increase impedance, so gradual bends are required.
-
2 Question 2 Single choice Design ICT Solutions
A retail chain is designing a standardised store template with a single 48-port horizontal patch panel in each telecommunications room. The store manager requires that a single cable fault should not disrupt point-of-sale transactions, and that administrators can identify each cable path during troubleshooting without referring to paper records. The design must also remain within the existing 600 mm wall-mounted rack depth. Which specification BEST satisfies these requirements?
Correct Answer: BExplanationRedundant, separately routed paths for point-of-sale ensure a single cable fault does not interrupt transactions, and a full identifier scheme (room, panel, port, destination) lets administrators trace paths without paper records. The larger 96-port rack in option D would not fit the stated 600 mm wall-mounted depth constraint and defers labelling, which fails the requirement. A single shared route creates a single point of failure, and relying on a drawing rather than on-cable labels fails the identification requirement.
-
3 Question 3 Multiple choice Support ICT Installation Process
A contractor is installing a horizontal cabling system in a 12-storey office building. The project timeline is compressed and the designer is required to participate in field observations and conduct inspections to protect the owner's interest. The designer notes that several cable jackets appear damaged at pull points and that some pathway fill ratios look high. Which TWO actions should the designer take during the inspection? (Choose two.)
Correct Answer: A, CExplanationDamaged jackets at pull points must be remediated before termination, because damage can degrade performance and is a conformance failure. Checking fill ratios against the design limits and manufacturer guidance confirms the pathway will not impose excessive pulling tension or heat. Approving fill ratios on the basis of one floor ignores that other routes may differ, and accepting self-certified results skips the verification the designer is responsible for. Re-pulling every floor is disproportionate and not supported by the observed evidence.
-
4 Question 4 Dropdown Design ICT Solutions
A healthcare facility's network administrator needs a consistent naming approach for patch panels in a multi-building campus, so that a technician can identify the physical location of each port from its label. The campus standard uses a building code, floor, and room identifier. Complete the labelling convention by selecting the correct value for each blank.
Choose the correct value for each blank.
Each patch panel label uses the format -- where the first field is the building code, the second is the floor level, and the third is the telecommunications room identifier.Correct Answer:Each patch panel label uses the format building code-floor level-telecommunications room identifier where the first field is the building code, the second is the floor level, and the third is the telecommunications room identifier.
ExplanationThe labelling format builds the identifier from the building code, floor level and telecommunications room identifier, which together locate a panel physically without reference to any logical attribute. Circuit IDs, IP addresses, VLAN IDs, asset tags, cable lengths, port speeds, patch cord colours and firmware versions change independently of location and so cannot serve as a physical locator. Each option is a real attribute of a network device or cable, but none of them fixes its physical position in the campus.
-
5 Question 5 Drag and drop Define Scope of ICT Design
A county government is planning a new civic centre and requires the designer to establish the project's scope boundaries and the estimated timeline before a cost commitment is made. The designer must identify which design tasks fall inside the telecommunications scope and which belong to other disciplines. Match each design task to the discipline that owns it.
Drag each item onto its matching target. On a phone: tap an item, then tap a target.
Designing the ductwork and cooling load for the server roomSpecifying the fire-stop materials for penetrations through rated wallsSizing the building's main electrical service and distribution panelsSpecifying the horizontal cabling and work area outlet locationsArchitectural or fire-stopping coordinationMechanical designProcurement of office furnitureTelecommunications (ICT) designElectrical designLandscape irrigation controlsCorrect Answer:- Specifying the horizontal cabling and work area outlet locations → Telecommunications (ICT) design
- Sizing the building's main electrical service and distribution panels → Electrical design
- Designing the ductwork and cooling load for the server room → Mechanical design
- Specifying the fire-stop materials for penetrations through rated walls → Architectural or fire-stopping coordination
ExplanationHorizontal cabling and outlet locations belong to telecommunications design, while main service sizing, server room cooling and fire-stopping in rated walls each fall within the electrical, mechanical and architectural disciplines respectively. The designer still coordinates with these disciplines, but does not own their design. Furniture procurement and irrigation controls lie outside the ICT scope entirely, which makes them the distractors.
-
6 Question 6 Single choice Support ICT Bid/Tender Process
A designer is reviewing four bids received in response to a Request for Proposal for a campus fibre network. Bidder W is the lowest price but its schedule omits the required pre-installation survey and testing labour. Bidder X is mid-priced but proposes a substitute cable type not listed in the specification, and has not stated the substitution as a deviation. Bidder Y is mid-priced, fully compliant with the specification, and provides a schedule that includes all specified tasks. Bidder Z is the highest price and includes a non-compliant warranty term. The owner's evaluation criteria require that bids be evaluated on responsiveness and total cost. Which bid should the designer recommend?
Correct Answer: AExplanationBidder Y is responsive, meaning it meets all specified requirements, and includes every required task, so its price is a true basis for comparison. Bidder W's omissions would become change orders and erase its apparent price advantage. Bidder X proposes an unlisted substitution without declaring it, which makes the bid non-responsive. Bidder Z's warranty term is non-compliant and its price premium is not justified by the stated criteria.
-
7 Question 7 Order list Support ICT Installation Process
A cabling contractor has completed installation of a fibre backbone in a campus and the owner requires formal acceptance before occupancy. The designer must ensure the closeout sequence produces verifiable evidence of conformance with the design. Arrange the steps in the correct order.
Drag the steps into the correct order, or use the arrows.
- Verify that labelling and as-built documentation match the installed plant
- Issue the acceptance certificate once all links pass and documentation is complete
- Review test results and reconcile any failed links with the contractor for remediation and retest
- Complete field testing of each fibre link and record the results against the specified limits
- Submit the final test report and as-built drawings to the owner for review
Correct Answer:- Complete field testing of each fibre link and record the results against the specified limits
- Review test results and reconcile any failed links with the contractor for remediation and retest
- Verify that labelling and as-built documentation match the installed plant
- Issue the acceptance certificate once all links pass and documentation is complete
- Submit the final test report and as-built drawings to the owner for review
ExplanationField testing must occur first so that results exist to review, then failed links are remediated and retested before the test results can be reconciled. Labelling and as-built documentation are verified against the installed plant before the final report is assembled. The report and as-builts are then submitted for owner review, and the acceptance certificate is issued only after everything passes. Submitting documentation before testing would present unverified results, and issuing acceptance before reconciliation would bypass the required evidence.
-
8 Question 8 Single choice Define Scope of ICT Design
A regional hospital is adding a 4-storey outpatient wing to an existing building. The owner wants the ICT design scope and budget estimate finalised before the architect issues the schematic design. The existing main distributor room is at capacity and the local authority requires that new telecommunications pathways comply with the applicable premises cabling standard and fire-stopping rules. The owner has a tight budget and a fixed opening date that cannot move. Which action should the designer take FIRST to establish a credible scope and cost estimate?
Correct Answer: CExplanationAssessing current conditions is the logical first step because the main distributor room is already at capacity, which directly drives whether the new wing can be served from it and what pathway and space upgrades cost. Only after the existing plant is documented can scope, code-driven requirements and a realistic estimate be set. Issuing specifications or bids first would price work that may be infeasible. Using the highest-density reference layout ignores the stated budget, and deferring code review risks rework on fire-stopping and pathway compliance.
-
9 Question 9 Multiple choice Design ICT Solutions
A university is renovating a laboratory building that will house high-density research computing. The design team must place telecommunications rooms so that horizontal cabling distances stay within limits, coordinate space with the mechanical and electrical disciplines, and avoid electromagnetic interference from power feeders. The floor plan has a 90-metre horizontal run limit to the furthest work area outlet and the power distribution panels are on the same wall as the proposed telecommunications room. Which TWO design decisions best meet these requirements? (Choose two.)
Correct Answer: A, CExplanationThe 90-metre horizontal limit applies to the permanent link plus channel allowance, so placing the telecommunications room so the farthest outlet stays within that reach, with allowance for patch cords, satisfies the distance requirement. Maintaining separation from power conductors and coordinating routing with the electrical engineer addresses interference. Sharing a cable tray with 480 V feeders breaks separation rules, and co-locating telecommunications rooms with electrical panels conflicts with clearance and access requirements. Adding a second room is not required by the stated constraints and is not the best decision for the question asked.
-
10 Question 10 Order list Support ICT Bid/Tender Process
A designer has received a Request for Information from a prospective owner asking which vendors could support a 2,000-outlet campus network refresh. The owner later intends to issue a formal Request for Proposal, and the designer must avoid any appearance of bias or unequal information among bidders. Arrange the steps in the correct order.
Drag the steps into the correct order, or use the arrows.
- Prepare a written response to the RFI listing capabilities, references and relevant experience
- Publish the RFI responses and any clarifications to all registered prospective bidders
- Confirm the RFP scope with the owner and verify that no bidder received information unavailable to others
- Submit the RFI response to the owner before the stated response deadline
- Use the RFI feedback to refine the scope and specification before the RFP is issued
Correct Answer:- Publish the RFI responses and any clarifications to all registered prospective bidders
- Prepare a written response to the RFI listing capabilities, references and relevant experience
- Submit the RFI response to the owner before the stated response deadline
- Use the RFI feedback to refine the scope and specification before the RFP is issued
- Confirm the RFP scope with the owner and verify that no bidder received information unavailable to others
ExplanationThe RFI response must be prepared and submitted before the deadline, and the owner then uses that feedback to refine scope before the RFP is issued. Because this is a competitive process, the owner must confirm no bidder has privileged information and distribute any clarifications to all bidders equally. The published clarification step therefore follows the owner's review and precedes the final equality confirmation. Reordering these steps would place the RFP refinement before any submission or breach equal-access principles.
-
11 Question 11 Drag and drop Support ICT Installation Process
During installation of a fibre backbone in a data centre, the contractor submits several documents and the designer must review each one against its purpose. Match each submittal to the review action that most directly confirms it meets the design intent.
Drag each item onto its matching target. On a phone: tap an item, then tap a target.
Proposed cable pathway routing drawingFibre cable manufacturer data sheet and attenuation specificationBill of materials for connectors and patch panelsPre-installation test planConfirm the test method and limits match the standard the design citesCheck that connector types match the specified interface and polishVerify that the contractor's labour rates match the approved bidVerify the cable type and attenuation values against the design specificationConfirm the route avoids conflicts with other services and meets bend radius limitsConfirm the warranty period meets the owner's procurement policyCorrect Answer:- Fibre cable manufacturer data sheet and attenuation specification → Verify the cable type and attenuation values against the design specification
- Proposed cable pathway routing drawing → Confirm the route avoids conflicts with other services and meets bend radius limits
- Bill of materials for connectors and patch panels → Check that connector types match the specified interface and polish
- Pre-installation test plan → Confirm the test method and limits match the standard the design cites
ExplanationEach submittal is reviewed against the specific design requirement it governs: the data sheet confirms attenuation and cable type, the routing drawing confirms clearances and bend radius, the bill of materials confirms connector compatibility, and the test plan confirms the acceptance method. Labour rates and warranty terms are commercial matters outside the technical submittal review, which is why they are distractors. Matching the test plan to the cited standard ensures acceptance testing will be meaningful.
These are 11 of the 320 questions in the full RCDDv14.1 pack.
Get All 320 QuestionsGet all 320 questions & answers
Full access options for BICSI RCDDv14.1
Self-study
PDF Version
- 320 actual exam questions
- Compatible with all devices
- Printable PDF format
- No download limits
- 90 days free updates
- 24/7 customer support
Best value
Bundle Pack
- Discounted PDF + online access
- 320 actual exam questions
- Both PDF and online practice test
- Free 90 days updates
- No download or practice limits
- 24/7 customer support
Exam simulation
Online Practice Test
- 320 actual exam questions
- Actual exam environment
- 90 days free updates
- Browser-based software
- 24/7 customer support
100% Money Back Guarantee
Your success comes first
At DumpsProvider, we give you a 100% money back guarantee on all of our exam dumps. For us, your success is the #1 priority and we are more than confident that our exam material will help you pass the RCDDv14.1 Exam (BICSI Registered Communications Distribution Designer Exam) on your very first attempt.
In a rare case, if you fail your exam, we will refund your amount without asking a single question.