2026 Actual Avixa CTS-I Dumps, Updated Exam Questions for Guaranteed Pass

Certified Technology Specialist - Installation - Free Practice Questions with Explanations, Exam Dumps, and Complete Practice Pack from DumpsProvider.

Exam Information

VendorAvixa
Exam codeCTS-I
Exam nameCertified Technology Specialist - Installation
Questions in pack511
Last updatedNovember 21, 2026
Related certificationsAvixa CTS Certification

Free practice questions with explanations

Avixa CTS-I Practice Questions

Answer a question to see the correct answer and the explanation, or click Show answer. Newest questions first.

Questions
11
Answered
0
Correct
0
Score
-
  1. 1 Question 1 Single choice Conduct Post Project Activities (e.g., support, warranties, maintenance)

    A corporate headquarters installed a 4K video conferencing system in its boardroom eight months ago. The manufacturer's warranty covers parts and labor for 12 months from the date of substantial completion. The integrator's service agreement has just been renewed. During a routine check, the technician finds that a camera has begun intermittently losing its PTZ control, and the facilities manager wants it fixed before the next quarterly board meeting in three weeks. The camera's firmware is two minor releases behind the current version, and the manufacturer's release notes list a known PTZ command-timeout fix in the newer version. The client's IT policy requires that all firmware changes be approved in writing before they are applied to production AV devices. What is the BEST first action?

  2. 2 Question 2 Single choice Conduct Site Rough-In/First-Fix (weight: 12%)

    A school district is converting a 1970s lecture hall into a hybrid learning room. The existing ceiling is a suspended grid with plenum-rated tiles, and the old analog video cabling runs through an open return-air plenum. The new design calls for HDBaseT transmitters at the lectern and a ceiling-mounted projector fed from a central rack in an adjacent room. The mechanical contractor has asked the AV integrator to remove the old coaxial runs and install new cable pathways before the ceiling is closed. The district requires that all new cable in the return-air plenum be plenum-rated and that no cable be laid on the ceiling grid or pulled through any fire-rated barrier without an approved firestop. Which action should the integrator take during rough-in?

  3. 3 Question 3 Single choice Implement Pre-Installation Activities (weight: 17%)

    An integrator is preparing to install an AV system in a corporate auditorium with a new 20-metre fibre run between the control room and the stage. During the site survey, the integrator discovers that the planned route passes through a shared telecom riser that the building operator has scheduled for a structural retrofit starting in six weeks. The AV project schedule has a fixed opening date, and the fibre cable has a 10-week lead time. The client has asked for a recommendation that protects the opening date while keeping the design intact. The building operator will not permit AV pathway work in the riser during the retrofit. What is the BEST recommendation to present to the client?

  4. 4 Question 4 Single choice Install AV Systems (weight: 39%)

    An integrator is assembling a 24U equipment rack for a training room that houses a matrix switcher, a DSP, a control processor, and a 2U power amplifier that draws significant current and exhausts heat from its rear. The rack is in a closet with no active cooling, and the design requires that the amplifier not be heated by the equipment above it. The rack will be cabled from the top down. The client also requires that the rack be serviceable from the front without removing other equipment. Which assembly approach best meets these requirements?

  5. 5 Question 5 Single choice Install AV Systems (weight: 39%)

    A company is installing a networked AV system for a boardroom. The control processor and the DSP must be placed on a dedicated AV VLAN, separate from the corporate data network, and the design calls for the DSP to receive a static IP address. The network team has issued the AV VLAN subnet as 10.20.30.0/24, with the default gateway at 10.20.30.1, and has reserved 10.20.30.10 through 10.20.30.49 for the DHCP pool. The DSP's IP address must be assigned outside that range. The control processor must be reachable from the corporate network for remote monitoring through a firewall rule that permits only the control port. Which configuration is correct for the DSP?

  6. 6 Question 6 Single choice Install AV Systems (weight: 39%)

    During calibration of a conference room's ceiling microphone array, the integrator observes that a single microphone shows a consistently lower signal level than the others, with a different response in the mid-frequency range. The microphones are connected to a DSP through a Dante network, and the array has been wired using the manufacturer's recommended cable and termination. The integrator has confirmed that the cable runs are correct and the connectors are fully seated. The room's ceiling was installed to specification and is within the planned height. The integrator must decide the NEXT step to resolve the discrepancy before final acceptance testing. What should the integrator do next?

  7. 7 Question 7 Multiple choice Install AV Systems (weight: 39%)

    A conference room uses a Crestron control processor to manage a projector, a video matrix, and an AV network device through an IP-based control system. The integrator is preparing the control and device settings for handover. The client's network team requires that the control system use only secured protocols and that no default administrative credentials remain on any device. The projector must also be controllable over IP but must not expose its web interface to guest users. Which TWO configuration actions meet these requirements? (Choose two.)

  8. 8 Question 8 Single choice Perform AV Systems Closeout (weight: 12%)

    An integrator is completing a commercial lecture hall project. During the client's acceptance walkthrough, the client's representative reviews a list of performance criteria in the signed design specification, including a required 95 percent speech intelligibility score measured with a STIPA test at five seats, and the requirement that the lectern wireless microphone operate reliably across the entire seating area. The integrator has completed the pre-acceptance test report, which shows the STIPA scores at the five test seats meet the threshold, but the wireless microphone has not yet been tested beyond the front rows. The client's representative asks the integrator to demonstrate that the system performs to specifications before signing off. What is the BEST next action for the integrator?

  9. 9 Question 9 Single choice Perform AV Systems Closeout (weight: 12%)

    An integrator has completed a corporate board room installation and is preparing the final documentation package. The client requires that the as-built drawings reflect the installed condition, that the DSP programming file be delivered in its final version, and that any changes made during commissioning be captured. During commissioning, the integrator moved one display 150 mm to the left to clear a structural beam, and changed the DSP's output routing for a ceiling speaker zone after testing revealed a phase problem. The original design drawings and the DSP file on the integrator's laptop both reflect the pre-commissioning design. Which action best ensures the closeout documentation is accurate?

  10. 10 Question 10 Single choice Practice Ongoing Project Responsibilities (weight: 12%)

    A general contractor is building a new campus theatre. The AV integrator is responsible for installing a loudspeaker system above a suspended ceiling, but the mechanical contractor has just issued a revised duct layout that now runs through the planned speaker suspension points. The mechanical contractor has asked the integrator to confirm a new mounting location by the end of the day so the ceiling framing can proceed. The integrator's engineer is off site and cannot review the revised layout until tomorrow. The general contractor's schedule has no float for ceiling framing. The integrator must not commit to a mounting change that affects the acoustic design without engineering approval. What is the BEST action for the integrator to take today?

  11. 11 Question 11 Multiple choice Practice Ongoing Project Responsibilities (weight: 12%)

    An integrator is managing daily field reporting on a multi-room AV installation. During a site visit, the integrator's foreman reports that a lift was used near an active electrical panel, a rack was delivered to the wrong floor, and a ceiling speaker bracket was installed in a location that differs from the approved shop drawing. The owner's representative requests a clear record of the issues and the actions taken. Which TWO actions should the integrator include in the daily field report and resulting coordination? (Choose two.)

These are 11 of the 511 questions in the full CTS-I pack.

Get All 511 Questions

Get all 511 questions & answers

735 Satisfied customers
94.4% Pass rate feedback
82.4% Said questions matched
97% Found material helpful

Full access options for Avixa CTS-I

Self-study

PDF Version

$40.00 $20.00
  • 511 actual exam questions
  • Compatible with all devices
  • Printable PDF format
  • No download limits
  • 90 days free updates
  • 24/7 customer support

Exam simulation

Online Practice Test

$50.00 $25.00
  • 511 actual exam questions
  • Actual exam environment
  • 90 days free updates
  • Browser-based software
  • 24/7 customer support

100% Money Back Guarantee

Your success comes first

At DumpsProvider, we give you a 100% money back guarantee on all of our exam dumps. For us, your success is the #1 priority and we are more than confident that our exam material will help you pass the CTS-I Exam (Certified Technology Specialist - Installation) on your very first attempt.

In a rare case, if you fail your exam, we will refund your amount without asking a single question.

100%

Security & Privacy

10000+

Satisfied Customers

24/7

Committed Service

100%

Money Back Guranteed