ASIS ASIS-PSP Practice Questions
Answer a question to see the correct answer and the explanation, or click Show answer. Newest questions first.
- Questions
- 13
- Answered
- 0
- Correct
- 0
- Score
- -
-
1 Question 1 Single choice Application, Design, and Integration of Physical Security Systems
A pharmaceutical distribution center has completed a risk analysis that identified unauthorized vehicle access to its loading dock as the highest-rated threat. The site must keep trucks moving during a 16-hour operating day, and the budget cannot support a full vehicle barrier retrofit within the current fiscal year. The facility's roadway is a public right-of-way that cannot be closed. Local code requires that any barrier installed in the fire lane allow emergency vehicle passage within 10 seconds. Which design approach best incorporates the risk analysis results while satisfying all constraints?
Correct Answer: AExplanationA retractable bollard row, operated by a guard switch with a manual override, deters and delays hostile vehicles at the highest-rated threat point while still letting trucks and fire apparatus pass, which respects both operations and code. Fixed crash-rated bollards on the approach would block the fire lane and cannot be relocated within the budget and roadway constraints. A swing gate offers no crash protection and depends on a fence that does not address vehicle ramming. Lighting and CCTV detect but do not delay, and deferring the barrier leaves the top-rated risk unmitigated for another year.
-
2 Question 2 Single choice Implementation of Physical Security Measures
A regional bank is procuring a new access control and video integration system for 14 branches. The procurement lead has received three bids. Bid A is the lowest cost but lists no installers certified for the chosen panel platform and has not provided references from comparable branch installations. Bid B is mid-priced, includes certified installers and three references, but its proposed video management server is end-of-life and will not receive security patches during the warranty period. Bid C is the highest priced, meets all technical specifications, and includes a 12-month parts-and-labour warranty. The bank's policy prohibits awarding contracts to vendors whose proposed components will be unsupported during warranty. Which action is the BEST next step in the evaluation?
Correct Answer: BExplanationBid B is the only bid that is otherwise qualified, so requesting a formal substitution for the end-of-life server is the appropriate procurement step; the revised bid must then be rechecked against technical compliance and references. Bid A fails the certification and reference criteria, and shifting that gap onto the bank's staff is not a vendor qualification. Bid C is compliant but awarding immediately skips the evaluation of cost and scheduling against alternatives. Reissuing the solicitation is premature when a qualified substitution path exists.
-
3 Question 3 Single choice Physical Security Assessment
A logistics company wants to assess its distribution campus, which includes a high-value pharmaceutical cage, a shared data room, and an open staging yard. The assessment team is considering an outside-inward approach to start. Leadership has limited the assessment window to three weeks and the budget excludes penetration testing. Several stakeholders argue the team should begin with the cage because it holds the highest-value inventory. Which approach best develops the assessment plan given the constraints and the need to establish how threats reach critical assets?
Correct Answer: BExplanationAn outside-inward approach traces how an adversary would move from the perimeter and staging yard toward critical assets, which fits a campus with an open yard and a tight three-week window because it identifies the attack paths that the internal controls must counter. Starting inside the cage documents controls without showing how a threat reaches them. Excluding the yard ignores a potential entry path that can affect critical assets. Relying solely on staff opinion without observation weakens the assessment and fails to establish actual threat exposure.
-
4 Question 4 Single choice Application, Design, and Integration of Physical Security Systems
A hospital is designing protection for its pediatric ward. Operational requirements call for infant abduction prevention with staff exit from the ward remaining unobstructed during emergencies. The design team must apply CPTED principles and defense-in-depth without creating an entrapment hazard that would violate fire life-safety codes. Which measure most effectively applies the concepts while meeting all stated requirements?
Correct Answer: AExplanationElectrically locked doors with a request-to-exit device and a fire alarm-tied fail-safe release combine delay of abduction with the life-safety requirement that egress is never blocked during an emergency. A keypad-only door with no alarm integration would trap occupants in a fire event, and a remote-only release fails if the nurse station is unattended. Sightlines and CCTV detect but do not delay or deny an abductor, so they do not meet the stated deterrence and delay requirement.
-
5 Question 5 Single choice Implementation of Physical Security Measures
During commissioning of a new integrated access control and intrusion system at a university research lab, the integrator reports that door-held alarms are intermittently triggering while doors are closed and latched. Field technicians measured a consistent 1.2-second delay between the door contact closing and the controller registering the closed state. The commissioning punch list requires all zones to report accurately within the vendor's specified tolerance before handover. Which corrective action most directly resolves the installation problem?
Correct Answer: BExplanationA consistent timing discrepancy on specific zones points to zone input configuration, such as input delay or end-of-line resistor values not matching the installed contact type. Adjusting those settings on the affected zones and retesting against the punch list resolves the cause while proving compliance. Raising building-wide sensitivity risks false alarms in other zones, and replacing hardware without retesting ignores the diagnostic evidence. Disabling alarms removes a required detection function and violates handover criteria.
-
6 Question 6 Single choice Physical Security Assessment
A manufacturer assesses the risk of theft of proprietary prototypes stored in an R&D building. Stakeholders disagree on how to express the loss impact. Finance can estimate replacement cost of the physical prototypes, but the intellectual property value cannot be reliably monetised, and the R&D director notes that a competitor obtaining the designs could eliminate a product line worth several years of revenue. The assessment must produce a criticality rating that supports a decision on whether to invest in access controls for the lab. Which approach best determines the loss impact for this asset?
Correct Answer: BExplanationLoss impact for tangible and intangible assets should combine what can be measured, such as replacement cost, with a structured qualitative assessment of intangible value, such as competitive harm and revenue exposure. This gives leadership a defensible criticality rating for the access control investment. Excluding intangibles understates the true loss and skews the decision. Assigning total company revenue is arbitrary and inflates the figure without a basis, and deferring the rating to stakeholder preference abandons method.
-
7 Question 7 Single choice Application, Design, and Integration of Physical Security Systems
A city government is redesigning the security of a municipal records archive. The archive is subject to a records retention code that prohibits altering the fire suppression system, and the budget permits only one major intrusion-related upgrade this year. A risk analysis ranks unauthorized after-hours entry through the loading area highest, followed by insider misuse of records. Operations requires that archive staff can retrieve materials on a 24-hour on-call basis. Which upgrade best satisfies the risk ranking, the budget, the code, and the operational requirement?
Correct Answer: AExplanationA credential reader with logging at the loading door addresses the highest-ranked threat, and the two-person rule for after-hours retrieval addresses insider misuse while preserving 24-hour operations. Leaving the fire suppression unchanged respects the code. Replacing fire suppression violates the records code and exceeds the budget constraint. A safe protects only some records and leaves the top-ranked entry point weak, and upgrading the lower-priority frontage contradicts the risk analysis.
-
8 Question 8 Single choice Implementation of Physical Security Measures
A healthcare system is outsourcing installation of a new video surveillance network across eight clinics. The procurement plan specifies that vendors be evaluated on demonstrated project management capability, due diligence, and reference checks. One vendor has excellent references but its project manager has not been named, and a second vendor has a named project manager but its references are unverifiable because the clients are unavailable. The procurement lead must select a vendor before the contract deadline. Which action best applies vendor evaluation and due diligence to make the selection?
Correct Answer: BExplanationDue diligence requires each vendor's claims to be verified: the first vendor must commit a named project manager and resource plan, and the second vendor's references must be validated through documentation or alternative verification. This gives the procurement lead a defensible basis before the deadline. Relying on references alone ignores project management capability, waiving references ignores due diligence, and splitting the contract does not resolve the evaluation gap and adds integration risk.
-
9 Question 9 Multiple choice Physical Security Assessment
A county courthouse is conducting a physical security assessment before a major trial. The assessment team needs to identify threats and hazards and determine their likelihood and severity for the courtroom and holding areas. Which TWO activities are most appropriate for assessing the nature, severity, and likelihood of threats to these assets? (Choose two.)
Correct Answer: A, DExplanationLikelihood is best estimated from relevant incident history and comparable facility data, and severity depends on how a threat would exploit a specific vulnerability, such as unmonitored transfer corridors in the holding area. A uniform high likelihood ignores evidence and produces no differentiation. City-wide statistics do not reflect building-specific threats. Excluding hazards is incorrect because the assessment must address both threats and hazards.
-
10 Question 10 Order list Application, Design, and Integration of Physical Security Systems
A corporate campus is adding a new parking structure and must develop the security design for it. The design team must follow a defensible sequence from requirements through to a verified design. The steps below are listed out of order. Drag the steps into the correct order.
Drag the steps into the correct order, or use the arrows.
- Map the structure's entry and exit points and identify where CPTED measures such as lighting and sightlines apply.
- Select countermeasures and confirm they meet applicable codes and the operational staffing model.
- Incorporate the risk analysis results to determine which threats the design must deter, detect, delay, or deny.
- Establish performance requirements such as detection range, response times, and success metrics.
- Verify the design against the success metrics through a field test before acceptance.
Correct Answer:- Establish performance requirements such as detection range, response times, and success metrics.
- Incorporate the risk analysis results to determine which threats the design must deter, detect, delay, or deny.
- Map the structure's entry and exit points and identify where CPTED measures such as lighting and sightlines apply.
- Select countermeasures and confirm they meet applicable codes and the operational staffing model.
- Verify the design against the success metrics through a field test before acceptance.
ExplanationPerformance requirements must be established first, which defines the success metrics against which everything else is measured. The risk analysis results are then incorporated to determine what the design must address. The layout and CPTED mapping follows, then countermeasures are selected and checked against codes and staffing, and the design is finally verified by field test. Starting with risk analysis before setting performance requirements leaves no metrics to validate the design. Mapping the layout before the requirements are set means the layout is not guided by any defined target. Field testing before countermeasures are selected cannot verify anything meaningful.
-
11 Question 11 Order list Implementation of Physical Security Measures
A utility company is replacing the access control system at a substation under a fixed-price contract. The project manager must sequence the implementation so that installation problems are caught and resolved before handover. The steps below are listed out of order. Drag the steps into the correct order.
Drag the steps into the correct order, or use the arrows.
- Perform commissioning tests on every zone and device against the acceptance criteria.
- Issue the punch list of deficiencies and track each item to closure.
- Complete the system integration with the existing alarm monitoring platform.
- Conduct installation inspections of readers, controllers, and cabling against the approved drawings.
Correct Answer:- Conduct installation inspections of readers, controllers, and cabling against the approved drawings.
- Complete the system integration with the existing alarm monitoring platform.
- Perform commissioning tests on every zone and device against the acceptance criteria.
- Issue the punch list of deficiencies and track each item to closure.
ExplanationInstallation inspection comes first to confirm the physical work matches the drawings before anything is energised. Integration with the monitoring platform follows once the hardware is sound. Commissioning tests then verify every zone and device against acceptance criteria, and the punch list captures the resulting deficiencies for closure. Issuing the punch list before commissioning means deficiencies are not yet identified, and testing before integration leaves the integrated behaviour unverified.
-
12 Question 12 Single choice Physical Security Assessment
A museum is assessing its collections for protection planning. The assessment team must correctly match each asset type to the value dimension that best describes how its loss would affect the institution. Match each item to its target.
1. Original irreplaceable painting
2. Donor and visitor personal data held in the membership database
3. Museum reputation and public trust
Targets:
A. Tangible asset valued by replacement and historical uniqueness
B. Intangible asset whose loss affects legal and privacy obligations
C. Intangible asset whose loss affects public confidence and future giving
Which mapping is correct?Correct Answer: AExplanationThe original painting is a tangible asset whose loss is measured by replacement and irreplaceable historical value, so it maps to A. Donor and visitor personal data carries legal and privacy obligations, which is the intangible loss captured by B. Reputation and public trust are intangible assets affecting confidence and future giving, which is C. The other mappings misclassify tangible and intangible assets or confuse the legal exposure of personal data with reputational loss.
-
13 Question 13 Dropdown Application, Design, and Integration of Physical Security Systems
Which pair of values correctly completes the configuration? Choose the correct value for each blank.
Choose the correct value for each blank.
A data center is configuring its access control design so that the server hall door fails in a safe state during a fire alarm while still enforcing credential control during normal operations. The design specifies that the door must remain locked under normal conditions and release automatically on a fire alarm input. The controller is set to mode for the electric strike, and the fire alarm interface is set to signal so that release occurs during an alarm.Correct Answer:A data center is configuring its access control design so that the server hall door fails in a safe state during a fire alarm while still enforcing credential control during normal operations. The design specifies that the door must remain locked under normal conditions and release automatically on a fire alarm input. The controller is set to fail-secure mode for the electric strike, and the fire alarm interface is set to normally open signal so that release occurs during an alarm.
ExplanationA fail-secure strike stays locked when power is removed and must be released by the alarm interface, so the server hall door requires a fail-secure configuration for credential control under normal conditions. The fire alarm contact is wired normally open and closes on alarm to release the strike. Fail-safe strikes unlock on power loss, which would defeat credential control in a power event, and a normally closed fire interface would release the strike constantly or fail in the wrong direction under the stated design.
These are 13 of the 312 questions in the full ASIS-PSP pack.
Get All 312 QuestionsGet all 312 questions & answers
Full access options for ASIS ASIS-PSP
Self-study
PDF Version
- 312 actual exam questions
- Compatible with all devices
- Printable PDF format
- No download limits
- 90 days free updates
- 24/7 customer support
Best value
Bundle Pack
- Discounted PDF + online access
- 312 actual exam questions
- Both PDF and online practice test
- Free 90 days updates
- No download or practice limits
- 24/7 customer support
Exam simulation
Online Practice Test
- 312 actual exam questions
- Actual exam environment
- 90 days free updates
- Browser-based software
- 24/7 customer support
100% Money Back Guarantee
Your success comes first
At DumpsProvider, we give you a 100% money back guarantee on all of our exam dumps. For us, your success is the #1 priority and we are more than confident that our exam material will help you pass the ASIS-PSP Exam (Physical Security Professional (PSP) Exam) on your very first attempt.
In a rare case, if you fail your exam, we will refund your amount without asking a single question.